# Fervo Energy: physical AI company

Canonical ID: `8afa9d74-31db-4bec-beae-d7bd47242b25`

## Key facts

- **Cape Station First Power (Sep 2026):** Company-stated ([company-stated](https://fervoenergy.com/fervo-energy-achieves-first-power-at-cape-station-a-landmark-moment-for-the-future-of-enhanced-geothermal-systems/)): on Sep 24 2026 Fervo announced Cape Station (Beaver County, Utah) achieved First Power, framed as the first utility-scale greenfield enhanced geothermal system synchronized to the grid and exporting electricity. Phase I is ~100 MW as three 33 MW GeoBlocks; first GeoBlock at First Power with contractual COD targeted by Oct 1 2026; remaining two GeoBlocks targeted COD by Jan 1 2027. Next ~400 MW phase under construction (COD 2028). Fully contracted offtake at Cape Station ~900 MW. Company press
- **Google Cape Station PPA 396 MW (Sep 2026):** Company-stated ([company-stated](https://fervoenergy.com/fervo-energy-and-google-sign-396-mw-ppa/)): Sep 1 2026 Fervo announced a 396 MW PPA with Google for Cape Station GeoCluster capacity expected online in 2028, with an option for Google to expand offtake by ~600 MW (toward ~1 GW) by June 2030. Separate from the Sep 24 First Power milestone on Phase I's first GeoBlock; Google is among contracted Cape Station offtakers
- **Next-generation geothermal:** Fervo Energy says it delivers 24/7 carbon-free energy through next-generation geothermal projects ([Fervo Energy](https://fervoenergy.com/)).

- **Slug:** fervo-energy
- **Status:** public
- **HQ:** Houston, Texas, USA

## Models

_No models registered._

## Supplies to

_No verified supply relationships on file. Supply-chain coverage is being added across the registry; check back as the seed populates this company's outbound edges._

_Outbound supply edges. Each appears when verified with at least two strong sources. Sources are append-only; corrections add new sources rather than rewrite history._

## Common questions

### What is Fervo Energy?

Fervo Energy (Nasdaq: FRVO) develops utility-scale enhanced geothermal systems (EGS). Flagship Cape Station GeoCluster in Beaver County, Utah, achieved First Power in Sep 2026 on its first 33 MW GeoBlock, with ~900 MW of contracted offtake including a 396 MW Google PPA.

### What does Fervo Energy make?

Fervo Energy has no robot models recorded on the DEPLOY registry.

### Is Fervo Energy publicly traded?

Yes. Fervo Energy is publicly traded on public markets, per the DEPLOY registry.

### How can I invest in Fervo Energy?

Fervo Energy is publicly traded (public markets), so its shares can be bought through any broker.

### Where is Fervo Energy headquartered?

Fervo Energy is headquartered in Houston, Texas, USA.

### Who owns Fervo Energy?

Fervo Energy is publicly held by its shareholders.

### Is Fervo Energy a top robotics company?

On DEPLOY's intelligence score, which blends verified deployments, funding, hiring, media, safety, and IP signals, Fervo Energy ranks in roughly the top 12% of companies tracked by the registry.


## Sources (4)

1. https://fervoenergy.com/fervo-energy-achieves-first-power-at-cape-station-a-landmark-moment-for-the-future-of-enhanced-geothermal-systems/ · 2026-09-24
2. https://x.com/fervoenergy/status/2103146366017151234 · 2026-09-24
3. https://fervoenergy.com/fervo-energy-and-google-sign-396-mw-ppa/ · 2026-09-01
4. https://fervoenergy.com/

## The verified answers

- [Which companies have the most robots deployed](/which-companies-have-the-most-robots-deployed.md)
- [Which operators run the most robots](/which-operators-run-the-most-robots.md)
- [Which robot operators cover the most countries](/which-robot-operators-cover-the-most-countries.md)

_API: GET /v1/companies/8afa9d74-31db-4bec-beae-d7bd47242b25 · canonical URL: /companies/fervo-energy_
