# Hilti revision history

Append-only Arc G field-change log. Forward-only honesty: events accrue from Arc G adoption.

Company: [Hilti](/companies/hilti.md)

## Recorded posture

- First recorded event: 2026-06-03
- Last material change: 2026-06-03
- Material event count: 1
- Editorial event count: 0

## Material events (1)

- **2026-06-03**: created (source: baseline:arc-g)

## Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date. To restate a recorded change, write a new event through the updateEntityField chokepoint.

_Canonical URL: /companies/hilti/history. REST: /v1/companies/b352ccd5-ce77-4b50-85e4-02d7abe32224/history. HTML: [/companies/hilti/history](/companies/hilti/history)._
