- **Data center pipeline (company-stated, Sep 2026):** 12,870 MW of requested data center load at Sep 30 2026, up from 12,710 MW in June. 8,350 MW is at application and preliminary engineering; 640 MW is in construction agreements or construction.
- **Energized data center load (company-stated):** 174 MW of new data center projects energized since 2024, as of Q3 2026.
- **Deferred large load (company-stated, Oct 2026):** Its Q3 2026 capital plan lists large load beyond an initial 1.8 GW among work to be delayed or deferred, alongside new housing connections and renewable interconnections.

- **Slug:** pacific-gas-and-electric
- **Status:** active
- **HQ:** Oakland, California

## Models

_No models registered._

## Supplies to

_No verified supply relationships on file. Supply-chain coverage is being added across the registry; check back as the seed populates this company's outbound edges._

_Outbound supply edges. Each appears when verified with at least two strong sources. Sources are append-only; corrections add new sources rather than rewrite history._

## Common questions

### What is PG&E?

PG&E (Pacific Gas and Electric Company) is the electric and gas utility for northern and central [California](/locations/california.md), with 12,870 MW of requested data center load in its pipeline at Sep 30 2026.

### What does PG&E make?

PG&E has no robot models recorded on the DEPLOY registry.

### Where is PG&E headquartered?

PG&E is headquartered in [Oakland](/locations/oakland-michigan.md), [California](/locations/california.md).

### Is PG&E a top robotics company?

On DEPLOY's intelligence score, which blends verified deployments, funding, hiring, media, safety, and IP signals, PG&E ranks in roughly the top 81% of companies tracked by the registry.


## Sources (3)

1. **PG&E Corporation Q3 2026 earnings presentation** · https://www.sec.gov/Archives/edgar/data/1004980/000100498026000056/q326earningspresentation.htm · 2026-10-22
2. **PG&E Corporation Reports Third Quarter 2026 Results; On Track to Deliver Solid 2026; Reaffirms 2026 and 2027 Guidance** · https://investor.pgecorp.com/news-events/press-releases/press-release-details/2026/PGE-Corporation-Reports-Third-Quarter-2026-Results-On-Track-to-Deliver-Solid-2026-Reaffirms-2026-and-2027-Guidance/default.aspx · 2026-10-22
3. **PG&E reports 12,870 MW of data center load in its pipeline and lists large load beyond an initial 1.8 GW as work to be delayed or deferred** · https://colocationscout.com/news-pge-data-center-pipeline-12870mw-september-2026.html · 2026-10-23

## The verified answers

- [Which companies have the most robots deployed](/which-companies-have-the-most-robots-deployed.md)
- [Which operators run the most robots](/which-operators-run-the-most-robots.md)
- [Which robot operators cover the most countries](/which-robot-operators-cover-the-most-countries.md)

_API: GET /v1/companies/bc348a43-9e74-4b5e-9909-39d368760217 · canonical URL: /companies/pacific-gas-and-electric_