# PJM Interconnection: robotics company

Canonical ID: `e8daca0f-7639-4aaa-9424-ba0ea31caffd`

## Key facts

- **Data-center backstop capacity auction delayed (reported, Sep 2026):** Reported ([reported](https://www.utilitydive.com/news/pjm-delays-backstop-procurement-ferc-data-center/831751/)): on Sep 30 2026 Utility Dive reported PJM Interconnection is delaying its planned reliability backstop procurement auction for data-center-driven capacity shortfall after FERC on Sep 29 only partly approved the framework. PJM spokesman Jeffrey Shields said the auction that had been set to accept offers Sep 30 through Oct 21 is delayed; a new timeline is yet to be determined; PJM is reviewing the order and intends to address remaining FERC concerns on cost allocation, transmission-owner exit rules, and load-serving entity collateral. PJM had aimed to acquire about 6.8 GW of new capacity tied to a shortfall from the 2028/29 capacity auction. Cap: trade press quoting PJM spokesman + FERC order summary; not a PJM-hosted primary filing page fetched this pass. Interconnection / who-pays bottleneck, not a chip story
- **Wholesale electricity footprint:** PJM describes itself as a regional transmission organization that coordinates the movement of wholesale electricity in all or parts of 13 states and the District of Columbia ([PJM](https://www.pjm.com/about-pjm)).

- **Slug:** pjm-interconnection
- **Status:** private
- **HQ:** Audubon, Pennsylvania, USA

## Models

_No models registered._

## Supplies to

_No verified supply relationships on file. Supply-chain coverage is being added across the registry; check back as the seed populates this company's outbound edges._

_Outbound supply edges. Each appears when verified with at least two strong sources. Sources are append-only; corrections add new sources rather than rewrite history._

## Common questions

### What is PJM Interconnection?

Largest U.S. regional transmission organization / grid operator, spanning Mid-Atlantic and Midwest states plus D.C. Tracked for AI data-center power and interconnection: on Sep 30 2026 delayed a planned reliability backstop capacity auction after partial FERC approval of its data-center-driven procurement framework (Utility Dive reporting).

### What does PJM Interconnection make?

PJM Interconnection has no robot models recorded on the DEPLOY registry. PJM Interconnection builds physical robots.

### Is PJM Interconnection publicly traded?

No. PJM Interconnection is privately held and not publicly traded, per the DEPLOY registry.

### How can I invest in PJM Interconnection?

PJM Interconnection is a private company; its shares are not available on public markets, so retail investors cannot buy the stock today.

### Where is PJM Interconnection headquartered?

PJM Interconnection is headquartered in Audubon, Pennsylvania, USA.

### Who owns PJM Interconnection?

PJM Interconnection is privately held; ownership sits with its founders and private investors.

### Is PJM Interconnection a top robotics company?

On DEPLOY's intelligence score, which blends verified deployments, funding, hiring, media, safety, and IP signals, PJM Interconnection ranks in roughly the top 97% of companies tracked by the registry.


## Sources (2)

1. https://www.utilitydive.com/news/pjm-delays-backstop-procurement-ferc-data-center/831751/ · 2026-09-30
2. https://www.pjm.com/about-pjm

## The verified answers

- [Which companies have the most robots deployed](/which-companies-have-the-most-robots-deployed.md)
- [Which operators run the most robots](/which-operators-run-the-most-robots.md)
- [Which robot operators cover the most countries](/which-robot-operators-cover-the-most-countries.md)

_API: GET /v1/companies/e8daca0f-7639-4aaa-9424-ba0ea31caffd · canonical URL: /companies/pjm-interconnection_
