AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 8ad2dfad-c906-4d69-bfb9-b9d78a8671c3
- **Type:** AI data center campus
- **Operator / developer:** [Applied Digital](/companies/applied-digital.md)
- **Location:** Boyce, Rapides Parish, Louisiana, United States
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 0.3

## Capacity ledger (append-only, dated, sourced)

- announced: 0.3 GW · reported · as of 2026-05-26 · https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus
- contracted: 0.3 GW · reported · as of 2026-04-23 · https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf

## Parties

- Applied Digital (developer): https://registry.deploy.report/companies/applied-digital

## Common questions


**What is Delta Forge 1 (Boyce / Rapides Parish)?**

Delta Forge 1 (Boyce / Rapides Parish) is an AI data center campus tracked on the DEPLOY registry, located in Boyce. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Delta Forge 1 (Boyce / Rapides Parish) use?**

Delta Forge 1 (Boyce / Rapides Parish) has 0.30 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building Delta Forge 1 (Boyce / Rapides Parish)?**

Applied Digital is recorded as a party to Delta Forge 1 (Boyce / Rapides Parish) on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Delta Forge 1 (Boyce / Rapides Parish) operating yet?**

As of the most recent verification on the DEPLOY registry, Delta Forge 1 (Boyce / Rapides Parish) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Delta Forge 1 (Boyce / Rapides Parish)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus in a Southern U.S. State: https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai
- Central Louisiana Secures $3.6 Billion Applied Digital AI Factory Campus: https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus
- Applied Digital Form 8-K (Apr 23, 2026) — Delta Forge 1 hyperscaler lease: https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf

Canonical: https://registry.deploy.report/datacenters/applied-digital-delta-forge-1-boyce-louisiana
JSON: https://registry.deploy.report/v1/datacenters/applied-digital-delta-forge-1-boyce-louisiana