# AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 7cb8993b-ed76-464a-8094-82a4395840e3
- **Type:** AI data center campus
- **Location:** Salem Township, Pennsylvania, United States
- **Lifecycle state:** partially_energized
- **Announced capacity (GW):** 0.96

## Capacity ledger (append-only, dated, sourced)

- announced: 0.96 GW · reported · as of 2024-06-01 · https://www.datacenterfrontier.com/hyperscale/article/33038288/aws-eyes-960-mw-for-newly-acquired-nuclear-power-data-center-in-pennsylvania

## Parties


## Common questions


**What is AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus?**

AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus is an AI data center campus tracked on the DEPLOY registry, located in Salem Township. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus use?**

AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus has 0.96 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Is AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus operating yet?**

As of the most recent verification on the DEPLOY registry, AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Data Center Frontier: AWS eyes 960 MW at PA nuclear campus: https://www.datacenterfrontier.com/hyperscale/article/33038288/aws-eyes-960-mw-for-newly-acquired-nuclear-power-data-center-in-pennsylvania
- Utility Dive: Talen to sell Amazon 1.92 GW from Susquehanna: https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-centert/750440/
- DCD: AWS acquires Talen's nuclear data center campus: https://www.datacenterdynamics.com/en/news/aws-acquires-talens-nuclear-data-center-campus-in-pennsylvania/
- Talen Energy Form 10-K (FY2025): https://www.sec.gov/Archives/edgar/data/1622536/000162253626000017/tln-20251231.htm

Canonical: https://registry.deploy.report/datacenters/aws-susquehanna-cumulus-salem-township-pennsylvania
JSON: https://registry.deploy.report/v1/datacenters/aws-susquehanna-cumulus-salem-township-pennsylvania
