# Wyoming campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 1735b956-9138-477a-9caa-12bf8a2ba89c
- **Type:** AI data center campus
- **Operator / developer:** [CoreWeave](/companies/coreweave.md)
- **Location:** Cheyenne, Wyoming, USA
- **Lifecycle state:** announced

## Parties

- CoreWeave (developer): https://registry.deploy.report/companies/coreweave

## Common questions


**What is Wyoming campus?**

Wyoming campus is an AI data center campus tracked on the DEPLOY registry, located in Cheyenne, Wyoming, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**Who is building Wyoming campus?**

CoreWeave is recorded as a party to Wyoming campus on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Wyoming campus operating yet?**

As of the most recent verification on the DEPLOY registry, Wyoming campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Wyoming campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Wyoming campus — coreweave facility: https://www.baxtel.com/data-centers/coreweave

Canonical: https://registry.deploy.report/datacenters/coreweave-wyoming-campus
JSON: https://registry.deploy.report/v1/datacenters/coreweave-wyoming-campus
