# Crusoe Abilene Microsoft AI Factory Campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** d7e72a52-2394-4b8e-9583-dcabc8fa0f7d
- **Type:** AI data center campus
- **Operator / developer:** [Crusoe](/companies/crusoe.md)
- **Location:** Abilene, Texas, United States
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 0.9

## Capacity ledger (append-only, dated, sourced)

- announced: 0.9 GW · claimed · as of 2026-03-27 · https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure

## Parties

- Crusoe (developer): https://registry.deploy.report/companies/crusoe
- Microsoft (tenant): https://registry.deploy.report/companies/microsoft

## Common questions


**What is Crusoe Abilene Microsoft AI Factory Campus?**

Crusoe Abilene Microsoft AI Factory Campus is an AI data center campus tracked on the DEPLOY registry, located in Abilene. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Crusoe Abilene Microsoft AI Factory Campus use?**

Crusoe Abilene Microsoft AI Factory Campus has 0.90 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building Crusoe Abilene Microsoft AI Factory Campus?**

Crusoe is recorded as a party to Crusoe Abilene Microsoft AI Factory Campus on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Crusoe Abilene Microsoft AI Factory Campus operating yet?**

As of the most recent verification on the DEPLOY registry, Crusoe Abilene Microsoft AI Factory Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Crusoe Abilene Microsoft AI Factory Campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Crusoe Announces New 900 MW AI Factory Campus in Abilene, Texas to Support Microsoft AI Infrastructure: https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure
- Crusoe Expands Abilene AI Campus With New 900 MW AI Factory for Microsoft: https://www.datacenterknowledge.com/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft

Canonical: https://registry.deploy.report/datacenters/crusoe-abilene-microsoft-campus
JSON: https://registry.deploy.report/v1/datacenters/crusoe-abilene-microsoft-campus
