# CtrlS Bihar 150 MW AI Data Centre

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 25fb4b19-d480-4fb9-adc6-5a5692bd30b4
- **Type:** AI data center campus
- **Operator / developer:** [CtrlS](/companies/ctrls.md)
- **Location:** Bihar, India
- **Lifecycle state:** announced
- **Announced capacity (GW):** 0.15

## Capacity ledger (append-only, dated, sourced)

- announced: 0.15 GW · claimed · as of 2026-11-20 · https://www.ctrls.com/press-release-ctrls-signs-mou-bihar-150-mw-ai-datacenter/

## Parties

- CtrlS (developer): https://registry.deploy.report/companies/ctrls

## Common questions


**What is CtrlS Bihar 150 MW AI Data Centre?**

CtrlS Bihar 150 MW AI Data Centre is an AI data center campus tracked on the DEPLOY registry, located in Bihar, India. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will CtrlS Bihar 150 MW AI Data Centre use?**

CtrlS Bihar 150 MW AI Data Centre has 0.15 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building CtrlS Bihar 150 MW AI Data Centre?**

CtrlS is recorded as a party to CtrlS Bihar 150 MW AI Data Centre on the DEPLOY registry. The full party list, with each role, is on the record.

**Is CtrlS Bihar 150 MW AI Data Centre operating yet?**

As of the most recent verification on the DEPLOY registry, CtrlS Bihar 150 MW AI Data Centre is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on CtrlS Bihar 150 MW AI Data Centre?**

This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- CtrlS Signs MoU with Bihar Government for 150-MW AI-Ready Data Centre: https://www.ctrls.com/press-release-ctrls-signs-mou-bihar-150-mw-ai-datacenter/

Canonical: https://registry.deploy.report/datacenters/ctrls-bihar-150mw-ai-data-centre
JSON: https://registry.deploy.report/v1/datacenters/ctrls-bihar-150mw-ai-data-centre