# Digital Edge CGK Hyperscale Campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 24c7acc1-9891-46d1-90bd-cb1fe474380c
- **Type:** AI data center campus
- **Operator / developer:** [Digital Edge](/companies/digital-edge-dc.md)
- **Location:** Cikarang, Indonesia
- **Lifecycle state:** under_construction

## Parties

- Digital Edge (developer): https://registry.deploy.report/companies/digital-edge-dc

## Common questions


**What is Digital Edge CGK Hyperscale Campus?**

Digital Edge CGK Hyperscale Campus is an AI data center campus tracked on the DEPLOY registry, located in Cikarang. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**Who is building Digital Edge CGK Hyperscale Campus?**

Digital Edge is recorded as a party to Digital Edge CGK Hyperscale Campus on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Digital Edge CGK Hyperscale Campus operating yet?**

As of the most recent verification on the DEPLOY registry, Digital Edge CGK Hyperscale Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Digital Edge CGK Hyperscale Campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Digital Edge CGK Hyperscale Campus — digital-edge-dc facility: https://www.digitaledgedc.com/products-services/data-centers/indonesia/

Canonical: https://registry.deploy.report/datacenters/digital-edge-dc-digital-edge-cgk-hyperscale-campus
JSON: https://registry.deploy.report/v1/datacenters/digital-edge-dc-digital-edge-cgk-hyperscale-campus
