# EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 723b1b3b-1564-4932-acea-7c32d83bc2c2
- **Type:** AI data center campus
- **Operator / developer:** [EdgeCore Digital Infrastructure](/companies/edgecore-digital-infrastructure.md)
- **Location:** Reno, Nevada, United States
- **Lifecycle state:** partially_energized
- **Announced capacity (GW):** 0.216

## Capacity ledger (append-only, dated, sourced)

- announced: 0.216 GW · claimed · as of 2026-11-20 · https://edgecore.com/locations/reno-data-center

## Parties

- EdgeCore Digital Infrastructure (developer): https://registry.deploy.report/companies/edgecore-digital-infrastructure
- EdgeCore Digital Infrastructure (operator): https://registry.deploy.report/companies/edgecore-digital-infrastructure

## Common questions


**What is EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)?**

EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) is an AI data center campus tracked on the DEPLOY registry, located in Reno. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) use?**

EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) has 0.22 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)?**

EdgeCore Digital Infrastructure is recorded as a party to EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) on the DEPLOY registry. The full party list, with each role, is on the record.

**Is EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) operating yet?**

As of the most recent verification on the DEPLOY registry, EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)?**

This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Reno Data Centers: https://edgecore.com/locations/reno-data-center
- EdgeCore Launches First Facility and Completes Structural Milestone at Second Data Center in 216 MW Reno Campus, Nevada: https://usdatacenterprojects.com/nevada/edgecore-launches-first-facility-and-completes-structural-milestone-at-second-data-center-in-216-mw-reno-campus-nevada

Canonical: https://registry.deploy.report/datacenters/edgecore-reno-data-center-campus
JSON: https://registry.deploy.report/v1/datacenters/edgecore-reno-data-center-campus