# Bitdeer Clarington (Hannibal Industrial Park)

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** 3b343912-3a4b-4227-a09a-c7550407fd7c
- **Type:** AI data center facility
- **Operator:** [Bitdeer](/companies/bitdeer.md)
- **Location:** Clarington
- **Status:** planned
- **Facility type:** crypto hpc
- **Critical IT (MW):** 570

## Evidence (each fact, sourced)

- critical_it_mw: 570 · claimed · https://crypto.news/bitcoin-miner-bitdeer-to-launch-570-mw-power-facility-in-ohio/
- record: Bitdeer Clarington (Hannibal Industrial Park) · reported · https://crypto.news/bitcoin-miner-bitdeer-to-launch-570-mw-power-facility-in-ohio/
- status: planned · claimed · https://crypto.news/bitcoin-miner-bitdeer-to-launch-570-mw-power-facility-in-ohio/

## Common questions


**What is Bitdeer Clarington (Hannibal Industrial Park)?**

Bitdeer Clarington (Hannibal Industrial Park) is a data center facility record on the DEPLOY registry, in Clarington. Every fact on the record is individually sourced and dated.

**Who operates Bitdeer Clarington (Hannibal Industrial Park)?**

Bitdeer operates Bitdeer Clarington (Hannibal Industrial Park), per the sourced record on the DEPLOY registry.

**Is Bitdeer Clarington (Hannibal Industrial Park) operating?**

Bitdeer Clarington (Hannibal Industrial Park) is recorded as planned on the DEPLOY registry, with 570 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on Bitdeer Clarington (Hannibal Industrial Park)?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/bitdeer-clarington-hannibal-oh
JSON: https://registry.deploy.report/v1/datacenters/facilities/bitdeer-clarington-hannibal-oh
