# Crusoe Abilene Second Campus

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** 203c5bd9-5582-4702-a39e-810b83ac5015
- **Type:** AI data center facility
- **Operator:** [Crusoe](/companies/crusoe.md)
- **Location:** Abilene
- **Status:** planned
- **Facility type:** hyperscale
- **Critical IT (MW):** 900

## Evidence (each fact, sourced)

- critical_it_mw: 900 · claimed · https://www.sdxcentral.com/news/crusoe-expands-ai-data-center-campus-in-abilene-to-12-gigawatts/
- record: Crusoe Abilene Second Campus · reported · https://www.sdxcentral.com/news/crusoe-expands-ai-data-center-campus-in-abilene-to-12-gigawatts/
- status: planned · reported · https://www.sdxcentral.com/news/crusoe-expands-ai-data-center-campus-in-abilene-to-12-gigawatts/

## Common questions


**What is Crusoe Abilene Second Campus?**

Crusoe Abilene Second Campus is a data center facility record on the DEPLOY registry, in Abilene. Every fact on the record is individually sourced and dated.

**Who operates Crusoe Abilene Second Campus?**

Crusoe operates Crusoe Abilene Second Campus, per the sourced record on the DEPLOY registry.

**Is Crusoe Abilene Second Campus operating?**

Crusoe Abilene Second Campus is recorded as planned on the DEPLOY registry, with 900 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on Crusoe Abilene Second Campus?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/crusoe-abilene-tx-second-campus-900mw
JSON: https://registry.deploy.report/v1/datacenters/facilities/crusoe-abilene-tx-second-campus-900mw
