# Digi Power X Columbiana

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** d49a1173-7483-4451-86fc-bfd17c0adaee
- **Type:** AI data center facility
- **Operator:** [Digi Power X](/companies/digi-power-x.md)
- **Location:** Columbiana
- **Status:** under_construction
- **Facility type:** crypto hpc
- **Critical IT (MW):** 55
- **Building (sqft):** 160,000
- **Operational year:** 2027

## Evidence (each fact, sourced)

- critical_it_mw: 55 (by 2027; 40 MW phase 1) · claimed · https://www.datacenterdynamics.com/en/news/digi-power-x-to-deploy-nvidia-gpus-at-data-center-in-alabama/
- record: Digi Power X Columbiana · reported · https://www.datacenterdynamics.com/en/news/digi-power-x-to-deploy-nvidia-gpus-at-data-center-in-alabama/
- status: under_construction · reported · https://www.shelbycountyreporter.com/news/columbiana-data-center-signs-1b-agreement-future-plans-revealed-f520ff1b/

## Common questions


**What is Digi Power X Columbiana?**

Digi Power X Columbiana is a data center facility record on the DEPLOY registry, in Columbiana. Every fact on the record is individually sourced and dated.

**Who operates Digi Power X Columbiana?**

Digi Power X operates Digi Power X Columbiana, per the sourced record on the DEPLOY registry.

**Is Digi Power X Columbiana operating?**

Digi Power X Columbiana is recorded as under construction on the DEPLOY registry, with 55 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on Digi Power X Columbiana?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/digi-power-x-columbiana-al
JSON: https://registry.deploy.report/v1/datacenters/facilities/digi-power-x-columbiana-al
