# ECL TerraSite-TX1

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** bad2e518-5a71-47bd-a5a1-f0c376653f3d
- **Type:** AI data center facility
- **Operator:** [ECL (EdgeCloudLink)](/companies/ecl-edgecloudlink.md)
- **Location:** Houston
- **Status:** under_construction
- **Facility type:** hyperscale
- **Critical IT (MW):** 1000

## Evidence (each fact, sourced)

- critical_it_mw: 1000 (2GW at full expansion) · reported · https://www.businesswire.com/news/home/20240925729563/en/ECL-Announces-Worlds-First-1-Gigawatt-Off-Grid-Hydrogen-Powered-AI-Factory-Data-Center
- record: ECL TerraSite-TX1 · reported · https://www.businesswire.com/news/home/20240925729563/en/ECL-Announces-Worlds-First-1-Gigawatt-Off-Grid-Hydrogen-Powered-AI-Factory-Data-Center
- status: under_construction (off-grid hydrogen AI factory, first 50MW module 2025, Lambda first tenant) · reported · https://www.datacenterfrontier.com/sustainability/article/55233745/ecl-debuts-1-gw-off-grid-hydrogen-powered-ai-factory-data-center-on-600-acres-near-houston

## Common questions


**What is ECL TerraSite-TX1?**

ECL TerraSite-TX1 is a data center facility record on the DEPLOY registry, in Houston. Every fact on the record is individually sourced and dated.

**Who operates ECL TerraSite-TX1?**

ECL (EdgeCloudLink) operates ECL TerraSite-TX1, per the sourced record on the DEPLOY registry.

**Is ECL TerraSite-TX1 operating?**

ECL TerraSite-TX1 is recorded as under construction on the DEPLOY registry, with 1000 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on ECL TerraSite-TX1?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/ecl-terrasite-tx1-houston-tx
JSON: https://registry.deploy.report/v1/datacenters/facilities/ecl-terrasite-tx1-houston-tx
