# EdgeCore Reno Campus

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** 02679132-5dd6-484a-b430-89633ae95057
- **Type:** AI data center facility
- **Operator:** [EdgeCore Digital Infrastructure](/companies/edgecore-digital-infrastructure.md)
- **Location:** Reno
- **Status:** under_construction
- **Facility type:** hyperscale
- **Critical IT (MW):** 216
- **Building (sqft):** 1,500,000

## Evidence (each fact, sourced)

- critical_it_mw: 216 MW critical IT load · claimed · https://www.nnbw.com/news/2023/oct/11/edgecore-digital-infrastructure-building-15-million-square-foot-data-center-at-tric/
- record: EdgeCore Reno Campus · reported · https://www.nnbw.com/news/2023/oct/11/edgecore-digital-infrastructure-building-15-million-square-foot-data-center-at-tric/
- status: under construction (NV Energy power H2 2025) · reported · https://www.datacenterdynamics.com/en/news/edgecore-breaks-ground-on-data-center-in-reno-nevada/

## Common questions


**What is EdgeCore Reno Campus?**

EdgeCore Reno Campus is a data center facility record on the DEPLOY registry, in Reno. Every fact on the record is individually sourced and dated.

**Who operates EdgeCore Reno Campus?**

EdgeCore Digital Infrastructure operates EdgeCore Reno Campus, per the sourced record on the DEPLOY registry.

**Is EdgeCore Reno Campus operating?**

EdgeCore Reno Campus is recorded as under construction on the DEPLOY registry, with 216 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on EdgeCore Reno Campus?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/edgecore-reno-usa-parkway-storey-nv
JSON: https://registry.deploy.report/v1/datacenters/facilities/edgecore-reno-usa-parkway-storey-nv
