# Fluidstack Abernathy Campus (TeraWulf)

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** 6591315c-e959-42d7-b444-e8529401dc7e
- **Type:** AI data center facility
- **Operator:** [Fluidstack](/companies/fluidstack.md)
- **Location:** Abernathy
- **Status:** under_construction
- **Facility type:** hyperscale
- **Critical IT (MW):** 168
- **Operational year:** 2026

## Evidence (each fact, sourced)

- critical_it_mw: 168 MW contracted · reported · https://baxtel.com/data-center/fluidstack-abernathy-campus
- record: Fluidstack Abernathy Campus (TeraWulf) · reported · https://baxtel.com/data-center/fluidstack-abernathy-campus
- status: under construction (expected H2 2026; 120-acre site; Fluidstack 49% / TeraWulf 51%) · reported · https://baxtel.com/data-center/fluidstack-abernathy-campus

## Common questions


**What is Fluidstack Abernathy Campus (TeraWulf)?**

Fluidstack Abernathy Campus (TeraWulf) is a data center facility record on the DEPLOY registry, in Abernathy. Every fact on the record is individually sourced and dated.

**Who operates Fluidstack Abernathy Campus (TeraWulf)?**

Fluidstack operates Fluidstack Abernathy Campus (TeraWulf), per the sourced record on the DEPLOY registry.

**Is Fluidstack Abernathy Campus (TeraWulf) operating?**

Fluidstack Abernathy Campus (TeraWulf) is recorded as under construction on the DEPLOY registry, with 168 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on Fluidstack Abernathy Campus (TeraWulf)?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/fluidstack-abernathy-tx
JSON: https://registry.deploy.report/v1/datacenters/facilities/fluidstack-abernathy-tx