# South Dallas One

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** ebb7ac16-3fc9-450e-9cf0-d15e834928e2
- **Type:** AI data center facility
- **Operator:** [GridFree AI](/companies/gridfree-ai.md)
- **Location:** Hillsboro
- **Status:** planned
- **Facility type:** hyperscale
- **Critical IT (MW):** 1500

## Evidence (each fact, sourced)

- critical_it_mw: 1.5+ GW per site, gas grid-independent · claimed · https://www.datacenterknowledge.com/energy-power-supply/gridfree-unveils-first-power-foundry-site-for-ai-data-center-workloads
- record: South Dallas One · reported · https://thedatacenterengineer.com/news/gridfree-ai-names-newmark-exclusive-advisor-for-south-dallas-one-grid-independent-data-center-campus-in-texas/
- status: planned; first site of a ~5 GW three-site South Dallas cluster · reported · https://thedatacenterengineer.com/news/gridfree-ai-names-newmark-exclusive-advisor-for-south-dallas-one-grid-independent-data-center-campus-in-texas/

## Common questions


**What is South Dallas One?**

South Dallas One is a data center facility record on the DEPLOY registry, in Hillsboro. Every fact on the record is individually sourced and dated.

**Who operates South Dallas One?**

GridFree AI operates South Dallas One, per the sourced record on the DEPLOY registry.

**Is South Dallas One operating?**

South Dallas One is recorded as planned on the DEPLOY registry, with 1500 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on South Dallas One?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/gridfree-ai-south-dallas-one-hill-county-tx
JSON: https://registry.deploy.report/v1/datacenters/facilities/gridfree-ai-south-dallas-one-hill-county-tx
