# IREN Sweetwater AI Campus (Sweetwater 1 & 2)

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** e46627ab-f84e-41fa-85f5-02d31fcdb08c
- **Type:** AI data center facility
- **Operator:** [IREN (Iris Energy)](/companies/iren-iris-energy.md)
- **Location:** Sweetwater
- **Status:** under_construction
- **Facility type:** crypto hpc
- **Operational year:** 2026

## Evidence (each fact, sourced)

- record: IREN Sweetwater AI Campus (Sweetwater 1 & 2) · reported · https://iren.com/data-centers/sweetwater
- status: under_construction - 2,000 MW gross AI campus on 2,200 acres; Sweetwater 1 (1,400 MW) substation energization 2026, Sweetwater 2 (600 MW) 2027 · claimed · https://iren.com/data-centers/sweetwater

## Common questions


**What is IREN Sweetwater AI Campus (Sweetwater 1 & 2)?**

IREN Sweetwater AI Campus (Sweetwater 1 & 2) is a data center facility record on the DEPLOY registry, in Sweetwater. Every fact on the record is individually sourced and dated.

**Who operates IREN Sweetwater AI Campus (Sweetwater 1 & 2)?**

IREN (Iris Energy) operates IREN Sweetwater AI Campus (Sweetwater 1 & 2), per the sourced record on the DEPLOY registry.

**Is IREN Sweetwater AI Campus (Sweetwater 1 & 2) operating?**

IREN Sweetwater AI Campus (Sweetwater 1 & 2) is recorded as under construction on the DEPLOY registry. Each figure traces to a source.

**How verified is the data on IREN Sweetwater AI Campus (Sweetwater 1 & 2)?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/iren-sweetwater-ai-campus-tx
JSON: https://registry.deploy.report/v1/datacenters/facilities/iren-sweetwater-ai-campus-tx
