- **Canonical ID:** d595922a-3313-4569-864e-7940ac2b2f79
- **Type:** AI data center facility
- **Operator:** [Meta Platforms](/companies/meta-platforms.md)
- **Location:** El Paso
- **Status:** under_construction
- **Facility type:** hyperscale
- **Critical IT (MW):** 1000
- **Operational year:** 2028

## Evidence (each fact, sourced)

- critical_it_mw: 1000 · claimed · https://constructionreviewonline.com/meta-breaks-ground-on-1-5-billion-ai-data-center-in-el-paso-boosting-regions-tech-footprint/
- record: Meta El Paso Data Center · reported · https://constructionreviewonline.com/meta-breaks-ground-on-1-5-billion-ai-data-center-in-el-paso-boosting-regions-tech-footprint/
- status: broke ground Oct 15 2025; 1GW target by 2028 on 1,000 acres · reported · https://constructionreviewonline.com/meta-breaks-ground-on-1-5-billion-ai-data-center-in-el-paso-boosting-regions-tech-footprint/

## Common questions


**What is Meta El Paso Data Center?**

Meta El Paso Data Center is a data center facility record on the DEPLOY registry, in El Paso. Every fact on the record is individually sourced and dated.

**Who operates Meta El Paso Data Center?**

Meta Platforms operates Meta El Paso Data Center, per the sourced record on the DEPLOY registry.

**Is Meta El Paso Data Center operating?**

Meta El Paso Data Center is recorded as under construction on the DEPLOY registry, with 1000 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on Meta El Paso Data Center?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/meta-el-paso-tx
JSON: https://registry.deploy.report/v1/datacenters/facilities/meta-el-paso-tx