# Pace Lone Star Project

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** be77c49a-e334-4b30-9e03-56fd62bc1009
- **Type:** AI data center facility
- **Operator:** [Pace](/companies/pace.md)
- **Location:** Garden City
- **Status:** planned
- **Facility type:** crypto hpc
- **Critical IT (MW):** 100

## Evidence (each fact, sourced)

- critical_it_mw: 100 MW · claimed · https://www.datacenterdynamics.com/en/news/pace-plans-100mw-texas-first-data-center-in-glasscock-county/
- record: Pace Lone Star Project · reported · https://www.datacenterdynamics.com/en/news/pace-plans-100mw-texas-first-data-center-in-glasscock-county/
- status: planned; behind-the-meter gas, site control secured June 2026 · reported · https://www.datacenterdynamics.com/en/news/pace-plans-100mw-texas-first-data-center-in-glasscock-county/

## Common questions


**What is Pace Lone Star Project?**

Pace Lone Star Project is a data center facility record on the DEPLOY registry, in Garden City. Every fact on the record is individually sourced and dated.

**Who operates Pace Lone Star Project?**

Pace operates Pace Lone Star Project, per the sourced record on the DEPLOY registry.

**Is Pace Lone Star Project operating?**

Pace Lone Star Project is recorded as planned on the DEPLOY registry, with 100 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on Pace Lone Star Project?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/pace-lone-star-project-glasscock-county-tx
JSON: https://registry.deploy.report/v1/datacenters/facilities/pace-lone-star-project-glasscock-county-tx
