# Quantum Frederick

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** a650829e-339e-4f5c-8b9d-179a2e001706
- **Type:** AI data center facility
- **Operator:** [Quantum Loophole](/companies/quantum-loophole.md)
- **Location:** Adamstown
- **Status:** under_construction
- **Facility type:** hyperscale

## Evidence (each fact, sourced)

- critical_it_mw: ~1000 (1 GW site power capacity) · claimed · https://dgtlinfra.com/tpg-quantum-loophole-100m-1gw-data-center/
- record: Quantum Frederick · reported · https://quantumloophole.com/2022/06/22/construction-begins-at-quantum-fredericks-data-campus/
- status: 2,100-acre master-planned campus on former Alcoa Eastalco Works site; under construction, Aligned first tenant, Rowan Digital projects approved · reported · https://www.datacenterfrontier.com/featured/article/11428096/quantum-loophole-plans-2100-acre-data-center-campus-in-maryland

## Common questions


**What is Quantum Frederick?**

Quantum Frederick is a data center facility record on the DEPLOY registry, in Adamstown. Every fact on the record is individually sourced and dated.

**Who operates Quantum Frederick?**

Quantum Loophole operates Quantum Frederick, per the sourced record on the DEPLOY registry.

**Is Quantum Frederick operating?**

Quantum Frederick is recorded as under construction on the DEPLOY registry. Each figure traces to a source.

**How verified is the data on Quantum Frederick?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/quantum-loophole-quantum-frederick-md
JSON: https://registry.deploy.report/v1/datacenters/facilities/quantum-loophole-quantum-frederick-md