# Giga Energy Project Clay (Hunt County, Texas)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 7eb8871d-2d85-4e38-858e-c85d6ba993b9
- **Type:** AI data center campus
- **Operator / developer:** [Giga Energy](/companies/giga-energy.md)
- **Location:** Texas, United States
- **Lifecycle state:** under_construction

## Capacity ledger (append-only, dated, sourced)

- contracted: 0.06 GW · claimed · as of 2026-11-17 · https://www.gigaenergy.com/news/giga-news-hunt-county-deal

## Parties

- Giga Energy (developer): https://registry.deploy.report/companies/giga-energy
- Giga Energy (operator): https://registry.deploy.report/companies/giga-energy

## Common questions


**What is Giga Energy Project Clay (Hunt County, Texas)?**

Giga Energy Project Clay (Hunt County, Texas) is an AI data center campus tracked on the DEPLOY registry, located in Texas. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**Who is building Giga Energy Project Clay (Hunt County, Texas)?**

Giga Energy is recorded as a party to Giga Energy Project Clay (Hunt County, Texas) on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Giga Energy Project Clay (Hunt County, Texas) operating yet?**

As of the most recent verification on the DEPLOY registry, Giga Energy Project Clay (Hunt County, Texas) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Giga Energy Project Clay (Hunt County, Texas)?**

This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Giga Energy Inks 10-Year, $1B Lease on Project Clay, a 60MW AI Data Center in Hunt County, TX: https://www.gigaenergy.com/news/giga-news-hunt-county-deal
- Giga Energy signs $1 billion lease for Texas AI data center with cloud provider: https://www.channelnewsasia.com/business/giga-energy-signs-1-billion-lease-texas-ai-data-center-cloud-provider-6559516

Canonical: https://registry.deploy.report/datacenters/giga-energy-project-clay-hunt-county
JSON: https://registry.deploy.report/v1/datacenters/giga-energy-project-clay-hunt-county
