# Equinix Sagamu Campus (Ogun State)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 56b9c619-f2de-4e8f-8400-0abc5bd0ad1a
- **Type:** AI data center campus
- **Operator / developer:** [MainOne](/companies/mainone.md)
- **Location:** Sagamu, Nigeria
- **Lifecycle state:** announced

## Parties

- MainOne (developer): https://registry.deploy.report/companies/mainone

## Common questions


**What is Equinix Sagamu Campus (Ogun State)?**

Equinix Sagamu Campus (Ogun State) is an AI data center campus tracked on the DEPLOY registry, located in Sagamu. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**Who is building Equinix Sagamu Campus (Ogun State)?**

MainOne is recorded as a party to Equinix Sagamu Campus (Ogun State) on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Equinix Sagamu Campus (Ogun State) operating yet?**

As of the most recent verification on the DEPLOY registry, Equinix Sagamu Campus (Ogun State) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Equinix Sagamu Campus (Ogun State)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Equinix Sagamu Campus (Ogun State) — mainone facility: https://www.equinix.com/newsroom/press-releases/2022/03/equinix-completes-acquisition-of-mainone

Canonical: https://registry.deploy.report/datacenters/mainone-equinix-sagamu-campus-ogun-state
JSON: https://registry.deploy.report/v1/datacenters/mainone-equinix-sagamu-campus-ogun-state
