# Meta Talavera de la Reina Data Center Campus (Torrehierro)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 6e1e64cb-aa2a-424b-8dfe-59d1535ae1e9
- **Type:** AI data center campus
- **Operator / developer:** [Meta Platforms](/companies/meta-platforms.md)
- **Location:** Talavera de la Reina, Toledo (Castilla-La Mancha), Spain
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 0.248

## Capacity ledger (append-only, dated, sourced)

- announced: 0.248 GW · reported · as of 2024-06-01 · https://inspain.news/opening-water-guzzling-datacenter-in-empty-and-dry-spain/

## Parties

- Meta Platforms (developer): https://registry.deploy.report/companies/meta-platforms

## Common questions


**What is Meta Talavera de la Reina Data Center Campus (Torrehierro)?**

Meta Talavera de la Reina Data Center Campus (Torrehierro) is an AI data center campus tracked on the DEPLOY registry, located in Talavera de la Reina. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Meta Talavera de la Reina Data Center Campus (Torrehierro) use?**

Meta Talavera de la Reina Data Center Campus (Torrehierro) has 0.25 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building Meta Talavera de la Reina Data Center Campus (Torrehierro)?**

Meta Platforms is recorded as a party to Meta Talavera de la Reina Data Center Campus (Torrehierro) on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Meta Talavera de la Reina Data Center Campus (Torrehierro) operating yet?**

As of the most recent verification on the DEPLOY registry, Meta Talavera de la Reina Data Center Campus (Torrehierro) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Meta Talavera de la Reina Data Center Campus (Torrehierro)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Opening water-guzzling datacenter in empty and dry Spain: https://inspain.news/opening-water-guzzling-datacenter-in-empty-and-dry-spain/
- Meta Data Center in Talavera de la Reina will be a 1,000 million dollars investment: https://cross-border-magazine.com/meta-data-center-talavera/
- Meta Drives Europe's Digital Future from Talavera: What Its Torrehierro Data Center Will Look Like: https://cloudnews.tech/meta-drives-europes-digital-future-from-talavera-heres-what-its-data-center-in-torrehierro-will-look-like/

Canonical: https://registry.deploy.report/datacenters/meta-talavera-de-la-reina
JSON: https://registry.deploy.report/v1/datacenters/meta-talavera-de-la-reina