# BT-owned UK sites (3 sites, up to 14 MW total)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 06474a7b-2e67-453f-991b-0ae6517a9dc3
- **Type:** AI data center campus
- **Operator / developer:** [Nscale](/companies/nscale.md)
- **Location:** Multiple, Global
- **Lifecycle state:** announced

## Parties

- Nscale (developer): https://registry.deploy.report/companies/nscale

## Common questions


**What is BT-owned UK sites (3 sites, up to 14 MW total)?**

BT-owned UK sites (3 sites, up to 14 MW total) is an AI data center campus tracked on the DEPLOY registry, located in Multiple, Global. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**Who is building BT-owned UK sites (3 sites, up to 14 MW total)?**

Nscale is recorded as a party to BT-owned UK sites (3 sites, up to 14 MW total) on the DEPLOY registry. The full party list, with each role, is on the record.

**Is BT-owned UK sites (3 sites, up to 14 MW total) operating yet?**

As of the most recent verification on the DEPLOY registry, BT-owned UK sites (3 sites, up to 14 MW total) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on BT-owned UK sites (3 sites, up to 14 MW total)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- BT-owned UK sites (3 sites, up to 14 MW total) — nscale facility: https://en.wikipedia.org/wiki/Nscale

Canonical: https://registry.deploy.report/datacenters/nscale-bt-owned-uk-sites
JSON: https://registry.deploy.report/v1/datacenters/nscale-bt-owned-uk-sites