# Nscale Loughton AI Data Centre (Langston Road, Essex)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** d3cda073-801d-42aa-a78d-1c88b0795b13
- **Type:** AI data center campus
- **Location:** Loughton, Essex, United Kingdom
- **Lifecycle state:** permitted
- **Announced capacity (GW):** 0.09

## Capacity ledger (append-only, dated, sourced)

- announced: 0.09 GW · reported · as of 2026-07-01 · https://datacentrereview.com/2026/07/nscales-2bn-essex-data-centre-hit-by-grid-delays/
- announced: 0.05 GW · claimed · as of 2025-06-01 · https://www.nscale.com/press-releases/ai-hyperscaler-nscale-to-invest-gbp-2-billion-in-the-uk-data-centre-industry

## Parties

- Microsoft (tenant): https://registry.deploy.report/companies/microsoft
- NVIDIA (chip_supplier): https://registry.deploy.report/companies/nvidia

## Common questions


**What is Nscale Loughton AI Data Centre (Langston Road, Essex)?**

Nscale Loughton AI Data Centre (Langston Road, Essex) is an AI data center campus tracked on the DEPLOY registry, located in Loughton. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Nscale Loughton AI Data Centre (Langston Road, Essex) use?**

Nscale Loughton AI Data Centre (Langston Road, Essex) has 0.09 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Is Nscale Loughton AI Data Centre (Langston Road, Essex) operating yet?**

As of the most recent verification on the DEPLOY registry, Nscale Loughton AI Data Centre (Langston Road, Essex) is permitted. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Nscale Loughton AI Data Centre (Langston Road, Essex)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- AI hyperscaler Nscale to invest GBP 2 billion in the UK data centre industry: https://www.nscale.com/press-releases/ai-hyperscaler-nscale-to-invest-gbp-2-billion-in-the-uk-data-centre-industry
- Nscale's GBP 2bn Essex data centre hit by grid delays: https://datacentrereview.com/2026/07/nscales-2bn-essex-data-centre-hit-by-grid-delays/

Canonical: https://registry.deploy.report/datacenters/nscale-loughton-essex
JSON: https://registry.deploy.report/v1/datacenters/nscale-loughton-essex
