# Loughton

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 308baf4c-f91b-4d89-8e6f-3c91626ba4d8
- **Type:** AI data center campus
- **Operator / developer:** [Nscale](/companies/nscale.md)
- **Location:** Loughton, Essex, United Kingdom
- **Lifecycle state:** under_construction

## Parties

- Nscale (developer): https://registry.deploy.report/companies/nscale

## Common questions


**What is Loughton?**

Loughton is an AI data center campus tracked on the DEPLOY registry, located in Loughton. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**Who is building Loughton?**

Nscale is recorded as a party to Loughton on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Loughton operating yet?**

As of the most recent verification on the DEPLOY registry, Loughton is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Loughton?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Loughton — nscale facility: https://en.wikipedia.org/wiki/Nscale

Canonical: https://registry.deploy.report/datacenters/nscale-loughton
JSON: https://registry.deploy.report/v1/datacenters/nscale-loughton
