AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 56323450-3554-4715-9806-51f327ca1f36
- **Type:** AI data center campus
- **Operator / developer:** [Samsung SDS](/companies/samsung-sds.md)
- **Location:** Gumi Complex, North Gyeongsang, South Korea, South Korea
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 0.12

## Capacity ledger (append-only, dated, sourced)

- announced: 0.12 GW · reported · as of 2026-11-02 · https://www.koreaherald.com/article/10922887
- under_construction: 0.06 GW · reported · as of 2026-11-02 · https://www.koreaherald.com/article/10922887

## Parties

- Samsung SDS (developer): https://registry.deploy.report/companies/samsung-sds
- Samsung SDS (operator): https://registry.deploy.report/companies/samsung-sds

## Common questions


**What is Samsung SDS Gumi AI Data Center?**

Samsung SDS Gumi AI Data Center is an AI data center campus tracked on the DEPLOY registry, located in Gumi Complex, North Gyeongsang, South Korea. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Samsung SDS Gumi AI Data Center use?**

Samsung SDS Gumi AI Data Center has 0.12 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building Samsung SDS Gumi AI Data Center?**

Samsung SDS is recorded as a party to Samsung SDS Gumi AI Data Center on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Samsung SDS Gumi AI Data Center operating yet?**

As of the most recent verification on the DEPLOY registry, Samsung SDS Gumi AI Data Center is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Samsung SDS Gumi AI Data Center?**

This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Samsung SDS targets 120MW capacity at new Gumi AI data center: https://www.koreaherald.com/article/10922887

Canonical: https://registry.deploy.report/datacenters/samsung-sds-gumi-ai-data-center
JSON: https://registry.deploy.report/v1/datacenters/samsung-sds-gumi-ai-data-center