# Scala AI City

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** f16e490e-0625-4aba-89cc-c734381df6fb
- **Type:** AI data center campus
- **Location:** Eldorado do Sul, Rio Grande do Sul, Brazil
- **Lifecycle state:** announced
- **Announced capacity (GW):** 4.75

## Capacity ledger (append-only, dated, sourced)

- announced: 4.75 GW · claimed · as of 2025-05-01 · https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html
- contracted: 5 GW · reported · as of 2025-05-01 · https://www.datacenterdynamics.com/en/news/scala-ai-city-scala-pitches-50bn-brazil-data-center-campus-of-up-to-47gw/
- under_construction: 0.054 GW · claimed · as of 2025-06-01 · https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html

## Parties


## Common questions


**What is Scala AI City?**

Scala AI City is an AI data center campus tracked on the DEPLOY registry, located in Eldorado do Sul. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Scala AI City use?**

Scala AI City has 4.75 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Is Scala AI City operating yet?**

As of the most recent verification on the DEPLOY registry, Scala AI City is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Scala AI City?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Scala AI City: Brazil's MME Approves 5 GW Power Connection (PR Newswire): https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html
- Scala pitches $50bn Brazil data center campus of up to 4.7GW (DCD): https://www.datacenterdynamics.com/en/news/scala-ai-city-scala-pitches-50bn-brazil-data-center-campus-of-up-to-47gw/
- Brazil's MME approves 5 GW power connection (Intelligent CIO LATAM): https://www.intelligentcio.com/latam/2025/05/15/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul/

Canonical: https://registry.deploy.report/datacenters/scala-ai-city-eldorado-do-sul
JSON: https://registry.deploy.report/v1/datacenters/scala-ai-city-eldorado-do-sul
