# Teraco DB1 Riverhorse Valley

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 28115e34-8d97-4a4e-b0c9-a0e9159cedd5
- **Type:** AI data center campus
- **Operator / developer:** [Teraco Data Environments](/companies/teraco.md)
- **Location:** Durban
- **Lifecycle state:** energized

## Parties

- Teraco Data Environments (developer): https://registry.deploy.report/companies/teraco

## Common questions


**What is Teraco DB1 Riverhorse Valley?**

Teraco DB1 Riverhorse Valley is an AI data center campus tracked on the DEPLOY registry, located in Durban. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**Who is building Teraco DB1 Riverhorse Valley?**

Teraco Data Environments is recorded as a party to Teraco DB1 Riverhorse Valley on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Teraco DB1 Riverhorse Valley operating yet?**

As of the most recent verification on the DEPLOY registry, Teraco DB1 Riverhorse Valley is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Teraco DB1 Riverhorse Valley?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Teraco DB1 Riverhorse Valley — teraco facility: https://www.teraco.co.za/data-centre-locations/durban/

Canonical: https://registry.deploy.report/datacenters/teraco-db1-riverhorse-valley
JSON: https://registry.deploy.report/v1/datacenters/teraco-db1-riverhorse-valley
