Apis Cor 3D-printed the walls of a two-story administrative building for Dubai Municipality, at the time described as the world's largest 3D-printed building (about 640 square meters, roughly 9.5 meters tall). The portable Apis Cor printer was moved around the site by crane and printed the structure on location. Dubai Municipality commissioned and owns the building; Apis Cor was the printing contractor.

## Key facts

- **Site:** Dubai Municipality administrative building, Dubai, UAE
- **Owner:** Dubai Municipality
- **Scale:** About 640 square meters, two stories, about 9.5 meters tall
- **Distinction:** Described as the world's largest 3D-printed building at completion
- **Method:** Portable printer repositioned around the site by crane

**Trust tier:** Unverified

_Last updated: 2026-07-12_

- **Slug:** apis-cor-dubai-municipality-building
- **Status:** operational
- **Model:** [Apis Cor Mobile Printer](/models/apis-cor-mobile-printer.md) (id: `9f1c6ca6-c378-4065-a6d3-aa6827aeb98c`)
- **Company:** [Apis Cor](/companies/apis-cor.md) (id: `3407cde1-f082-4d70-8e90-f361b774270b`)
- **Location:** [Dubai](/locations/uae/dubai.md) (id: `f0491685-0c1d-4be6-8010-1daf5225a234`)
- **Operator:** [Apis Cor](/companies/apis-cor.md) (id: `3407cde1-f082-4d70-8e90-f361b774270b`)
- **First seen:** 2019-12-01T00:00:00.000Z

## Verification log (0, append-only)

_No verifications recorded._

## Sources (1)

1. https://parametric-architecture.com/apis-cor-completes-the-dubai-municipality-largest-3d-printed-construction/ · 2019-12-01

## Common questions

### What is the Apis Cor Mobile Printer deployment at Dubai?

Apis Cor Mobile Printer, built by Apis Cor, is recorded as a deployment at Dubai on the DEPLOY registry. Apis Cor operates the deployment directly.

### Who operates Apis Cor Mobile Printer at Dubai?

Apis Cor, the manufacturer of Apis Cor Mobile Printer, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.

### When did the Apis Cor Mobile Printer deployment at Dubai go live?

The deployment is recorded as starting December 1, 2019 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.

### Have there been incidents at the Apis Cor Mobile Printer deployment at Dubai?

No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.


_API: GET /v1/robots/23384152-0051-4e9a-8f93-4a05bd734513 · feeds: GET /v1/feeds?deploymentId=23384152-0051-4e9a-8f93-4a05bd734513 · canonical URL: /deployments/apis-cor-dubai-municipality-building_