Civ Robotics CivDot autonomous layout robots marked pile-driving locations at the Cutlass Solar 2 project (about 218 MW, roughly 1,100 acres) in Fort Bend County, Texas. ENR reported CivDot raised layout throughput from about 300 to about 1,500 piles per day. Bechtel was the EPC contractor; the project reached full capacity in May 2024.

## Key facts

- **Site:** Cutlass Solar 2 (about 218 MW, about 1,100 acres), Fort Bend County, Texas
- **EPC contractor:** Bechtel
- **Task:** Marking pile-driving locations (survey/layout)
- **Result:** Layout raised from about 300 to about 1,500 piles per day
- **Project status:** Reached full capacity May 2024

**Trust tier:** Unverified

_Last updated: 2026-07-12_

- **Slug:** civ-civdot-cutlass-solar-2
- **Status:** operational
- **Model:** [CivDot](/models/civ-civdot.md) (id: `282d1311-a963-452b-a15f-dcd494f381ab`)
- **Company:** [Civ Robotics](/companies/civ-robotics.md) (id: `6f9b38f8-adc0-4249-83ef-ce4b44679237`)
- **Location:** [Fort Bend County](/locations/united-states/texas/fort-bend-county-tx.md) (id: `21236067-5e89-408c-b260-b0b418e9852e`)
- **Operator:** [Bechtel Corporation](/companies/bechtel.md) (id: `3b88f921-226d-4c50-8ebd-ad4c10e1d540`)
- **First seen:** 2023-01-01T00:00:00.000Z

## Verification log (0, append-only)

_No verifications recorded._

## Sources (2)

1. https://www.enr.com/articles/58145-bechtel-led-team-expedites-finish-of-large-texas-solar-power-job · 2024-01-01
2. https://www.bechtel.com/press-releases/bechtel-built-cutlass-solar-2-generates-energy-at-full-capacity/ · 2024-05-01

## Common questions

### What is the CivDot deployment at Fort Bend County?

CivDot, built by Civ Robotics, is recorded as a deployment at Fort Bend County on the DEPLOY registry. Bechtel Corporation operates the deployment.

### Who operates CivDot at Fort Bend County?

Bechtel Corporation operates this deployment as a customer of Civ Robotics, the manufacturer of CivDot.

### When did the CivDot deployment at Fort Bend County go live?

The deployment is recorded as starting January 1, 2023 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.

### Have there been incidents at the CivDot deployment at Fort Bend County?

No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.


_API: GET /v1/robots/455595d1-fe24-4e22-adda-9df5ed9d1986 · feeds: GET /v1/feeds?deploymentId=455595d1-fe24-4e22-adda-9df5ed9d1986 · canonical URL: /deployments/civ-civdot-cutlass-solar-2_