# DataOne AI Factory at Grenoble and Lyon, France: deployment

Canonical ID: `57ca2ca0-d561-40db-8938-7b1326260986`

Giga-scale AI hosting data centre campus across Grenoble (Eybens) and Lyon (Villefontaine), France. Currently 15MW IT load across 50,000 sqm on 14 hectares. Targeting 400MW by 2028, powered by EDF hydroelectric and nuclear energy with zero-carbon operations. ISO 27001, 14001, 50001, and SOC 1 and 2 certified.

## Key facts

- **Current capacity:** 15MW (80MW target April 2025)
- **Target capacity:** 400MW by 2028
- **Energy:** 100% renewable (EDF hydroelectric + nuclear backup)

**Trust tier:** Unverified

_Last updated: 2026-08-19_

- **Slug:** dataone-ai-factory-grenoble-lyon-france
- **Status:** operational
- **Model:** [DataOne AI Factory](/models/dataone-ai-factory.md) (id: `61b8ee5b-2267-4d50-8f34-923ef50d454f`)
- **Company:** [DataOne](/companies/dataone.md) (id: `6dc05227-b83c-45e7-9238-9d2591c00358`)
- **Location:** [Grenoble and Lyon, France](/locations/grenoble-lyon-france.md) (id: `64e401ce-503d-4f6e-9ec4-807aee48e5b2`)
- **Operator:** [DataOne](/companies/dataone.md) (id: `6dc05227-b83c-45e7-9238-9d2591c00358`)
- **First seen:** 2024-11-26T00:00:00.000Z

## Verification log (0, append-only)

_No verifications recorded._

## Sources (1)

1. **BSO Unveils DataOne: Europe's First Giga-Scale AI Hosting Data Centre** · https://www.bso.co/all-insights/bso-unveils-dataone-europes-first-giga-scale-ai-hosting-data-centre · 2024-11-26

## Common questions

### What is the DataOne AI Factory deployment at Grenoble and Lyon, France?

DataOne AI Factory, built by DataOne, is recorded as a deployment at Grenoble and Lyon, France on the DEPLOY registry. DataOne operates the deployment directly.

### Who operates DataOne AI Factory at Grenoble and Lyon, France?

DataOne, the manufacturer of DataOne AI Factory, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.

### When did the DataOne AI Factory deployment at Grenoble and Lyon, France go live?

The deployment is recorded as starting November 26, 2024 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.

### Have there been incidents at the DataOne AI Factory deployment at Grenoble and Lyon, France?

No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.


_API: GET /v1/robots/57ca2ca0-d561-40db-8938-7b1326260986 · feeds: GET /v1/feeds?deploymentId=57ca2ca0-d561-40db-8938-7b1326260986 · canonical URL: /deployments/dataone-ai-factory-grenoble-lyon-france_
