# AeiROBOT x Daeduck Electronics PCB deployment revision history

Append-only Arc G field-change log. Forward-only honesty: events accrue from Arc G adoption.

Partnership: [AeiROBOT x Daeduck Electronics PCB deployment](/partnerships/aeirobot-x-daeduck-electronics-pcb-deployment.md)

## Recorded posture

- First recorded event: 2026-07-28
- Last material change: 2026-07-28
- Material event count: 1
- Editorial event count: 0

## Material events (1)

- **2026-07-28**: created (source: https://www.thelec.net/news/articleView.html?idxno=12609) (verified)

## Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

_Canonical URL: /partnerships/aeirobot-x-daeduck-electronics-pcb-deployment/history. REST: /v1/partnerships/edfeccbb-7309-41f9-a86f-f480fd39f0c6/history. HTML: [/partnerships/aeirobot-x-daeduck-electronics-pcb-deployment/history](/partnerships/aeirobot-x-daeduck-electronics-pcb-deployment/history)._
