# Big Watt Digital x PowerHouse Data Centers (Taylor Technology Campus) revision history

Append-only Arc G field-change log. Forward-only honesty: events accrue from Arc G adoption.

Partnership: [Big Watt Digital x PowerHouse Data Centers (Taylor Technology Campus)](/partnerships/big-watt-digital-x-powerhouse-data-centers-taylor.md)

## Recorded posture

- First recorded event: 2026-10-08
- Last material change: 2026-10-08
- Material event count: 1
- Editorial event count: 0

## Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

_Canonical URL: /partnerships/big-watt-digital-x-powerhouse-data-centers-taylor/history. REST: /v1/partnerships/00ef87d7-58a1-4c72-82ca-612e8eac5a15/history. HTML: [/partnerships/big-watt-digital-x-powerhouse-data-centers-taylor/history](/partnerships/big-watt-digital-x-powerhouse-data-centers-taylor/history)._
