# Cloverleaf Infrastructure x NVIDIA (Data Center Infrastructure) revision history

Append-only Arc G field-change log. Forward-only honesty: events accrue from Arc G adoption.

Partnership: [Cloverleaf Infrastructure x NVIDIA (Data Center Infrastructure)](/partnerships/cloverleaf-infrastructure-x-nvidia-data-center-infrastructure.md)

## Recorded posture

- First recorded event: 2026-08-21
- Last material change: 2026-08-21
- Material event count: 1
- Editorial event count: 0

## Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

_Canonical URL: /partnerships/cloverleaf-infrastructure-x-nvidia-data-center-infrastructure/history. REST: /v1/partnerships/b25c2b94-1e6a-4956-9a19-3999b05cba66/history. HTML: [/partnerships/cloverleaf-infrastructure-x-nvidia-data-center-infrastructure/history](/partnerships/cloverleaf-infrastructure-x-nvidia-data-center-infrastructure/history)._
