# NTT Global Data Centers x Amata B.Grimm Power (400 MW Amata City Chonburi campus study) revision history

Append-only Arc G field-change log. Forward-only honesty: events accrue from Arc G adoption.

Partnership: [NTT Global Data Centers x Amata B.Grimm Power (400 MW Amata City Chonburi campus study)](/partnerships/ntt-gdc-x-amata-b-grimm-power-chonburi-400mw.md)

_No events on file. Arc G is forward-only; the recorded event log accrues from Arc G adoption (2026-06-04). For the current state of this partnership, see the partnership page._

## Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

_Canonical URL: /partnerships/ntt-gdc-x-amata-b-grimm-power-chonburi-400mw/history. REST: /v1/partnerships/752f6369-12f7-4153-b5be-9ea96ef7869d/history. HTML: [/partnerships/ntt-gdc-x-amata-b-grimm-power-chonburi-400mw/history](/partnerships/ntt-gdc-x-amata-b-grimm-power-chonburi-400mw/history)._
