# UT Austin x Samsung Austin Semiconductor (Talent Pipeline) revision history

Append-only Arc G field-change log. Forward-only honesty: events accrue from Arc G adoption.

Partnership: [UT Austin x Samsung Austin Semiconductor (Talent Pipeline)](/partnerships/ut-austin-x-samsung-austin-semiconductor-talent-pipeline.md)

## Recorded posture

- First recorded event: 2023-09-01
- Last material change: 2023-09-01
- Material event count: 1
- Editorial event count: 0

## Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

_Canonical URL: /partnerships/ut-austin-x-samsung-austin-semiconductor-talent-pipeline/history. REST: /v1/partnerships/95480a1f-f371-4ea5-8b56-43b0c10e52fc/history. HTML: [/partnerships/ut-austin-x-samsung-austin-semiconductor-talent-pipeline/history](/partnerships/ut-austin-x-samsung-austin-semiconductor-talent-pipeline/history)._
