# North Carolina Utilities Commission approves a Duke Energy rate schedule for data centers with loads above 50 megawatts

Canonical ID: `28f90ede-548c-45fc-a0af-db42435d28bd`

- **Jurisdiction:** [North Carolina](/locations/united-states/north-carolina.md) (id: `f320265d-5dbc-42aa-952f-74ef6d536583`)
- **Kind:** `other`
- **Status (derived):** in_effect

In its Duke Energy Carolinas and Duke Energy Progress rate orders, the North Carolina Utilities Commission established a new rate schedule for data center customers with loads above 50 megawatts, with new rates taking effect Jan. 1. Per Duke Energy's SEC filing summarizing the Duke Energy Progress order, its data center schedule requires minimum 15-year contract terms for data centers above 100 MW and minimum billing demand of 75% of contract demand, along with contributions in aid of construction for dedicated facilities and letters of credit for transmission network upgrades.

## Sources (2)

1. **North Carolina regulators approve more cost-effective path to strengthen reliability and power the state's future** · https://investors.duke-energy.com/news/news-details/2026/North-Carolina-regulators-approve-more-cost-effective-path-to-strengthen-reliability-and-power-the-states-future/default.aspx · 2026-11-17
2. **Duke Energy Form 8-K Exhibit 99.2 (Duke Energy Progress North Carolina rate case summary)** · https://www.sec.gov/Archives/edgar/data/17797/000110465926128747/tm2629986d1_ex99-2.htm

## Common questions

### What does North Carolina Utilities Commission approves a Duke Energy rate schedule for data centers with loads above 50 megawatts cover?

In its Duke Energy Carolinas and Duke Energy Progress rate orders, the North Carolina Utilities Commission established a new rate schedule for data center customers with loads above 50 megawatts, with new rates taking effect Jan. 1. Per Duke Energy's SEC filing summarizing the Duke Energy Progress order, its data center schedule requires minimum 15-year contract terms for data centers above 100 MW and minimum billing demand of 75% of contract demand, along with contributions in aid of construction for dedicated facilities and letters of credit for transmission network upgrades.

### Where does North Carolina Utilities Commission approves a Duke Energy rate schedule for data centers with loads above 50 megawatts apply?

North Carolina Utilities Commission approves a Duke Energy rate schedule for data centers with loads above 50 megawatts is recorded as a other applying in [North Carolina](/locations/north-carolina.md) on the DEPLOY registry.

### Is North Carolina Utilities Commission approves a Duke Energy rate schedule for data centers with loads above 50 megawatts still in effect?

North Carolina Utilities Commission approves a Duke Energy rate schedule for data centers with loads above 50 megawatts is currently in effect and applies to covered operators in the named jurisdiction.

### What types of robots does North Carolina Utilities Commission approves a Duke Energy rate schedule for data centers with loads above 50 megawatts apply to?

North Carolina Utilities Commission approves a Duke Energy rate schedule for data centers with loads above 50 megawatts is recorded as cross-cutting on the DEPLOY registry, meaning it does not single out one robot form factor. Operators of any covered robot type in [North Carolina](/locations/north-carolina.md) should review the underlying primary sources for applicability.


_API: GET /v1/regulations/28f90ede-548c-45fc-a0af-db42435d28bd · sources: /v1/regulations/28f90ede-548c-45fc-a0af-db42435d28bd/sources · status: /v1/regulations/28f90ede-548c-45fc-a0af-db42435d28bd/status · canonical URL: /regulations/north-carolina-ncuc-duke-energy-data-center-rate-schedule-2026_