{"id":"18375243-0a93-416c-af11-c07ea297a24f","name":"BDx Data Centers","slug":"bdx-data-centers","description":"BDx Data Centers (Big Data Exchange) is a Singapore-headquartered colocation and hyperscale operator focused on Southeast Asia, Greater China, and India. The company was formed in 2020 as a joint venture backed by I Squared Capital and Bin Jiang Group, and today runs more than 20 facilities across Indonesia, Hong Kong, Singapore, Taiwan, and mainland China (Guangzhou and Nanjing).\n\nIts center of gravity has shifted decisively toward Indonesia, where the June 2026 agreement with state utility PLN locked in 1.2 GW of power for a national AI infrastructure platform, the largest single power commitment ever secured by a data center operator in the country. The Jakarta-area CGK4 campus, launched in 2024, is designed to scale to 500 MW of renewable-powered capacity. BDx Indonesia is co-owned with Telkom Indonesia subsidiary NeutraDC and serves as the anchor for NVIDIA's sovereign-AI cloud deal with Indosat Ooredoo Hutchison and Lintasarta.\n\nOutside Indonesia, BDx runs three Hong Kong facilities (HKG1/2/8), a Singapore flagship whose freehold it acquired in March 2024, a Taipei site, and Chinese facilities in Guangzhou and Nanjing. Recent financing includes a US$320 million loan announced in April 2026 to accelerate AI-ready buildout across Asia, on top of a US$155 million DBS/OCBC facility raised in March 2024 and a 2025 Hong Kong expansion financing.","status":"private","founded":2019,"hq":"Singapore","hqLat":1.357107,"hqLng":103.8194992,"hqGeocodedAt":"2026-10-10T04:20:43.127Z","hqAddress":null,"hqPrecision":null,"website":"https://www.bdxdatacenters.com","fundingTotal":null,"type":"infrastructure","roles":[],"reviewStatus":"reviewed","heatIndex":0,"lifecycleState":"active","supersededByCompanyId":null,"sources":[{"url":"https://www.bdxworld.com/","title":"BDx Data Centers"},{"url":"https://www.bdxworld.com/press-release/","title":"BDx Data Centers press releases (2023-2026)"},{"url":"https://www.bdxworld.com/press-release/bdx-data-centers-secures-indonesias-largest-data-center-power-commitment-at-1-2-gw/","title":"BDx Secures Indonesia's Largest Data Center Power Commitment at 1.2 GW"},{"url":"https://www.bdxworld.com/press-release/bdx-secures-us320-million-loan-to-accelerate-ai-ready-data-center-infrastructure-in-asia/","title":"BDx Secures US$320 Million Loan to Accelerate AI-Ready Data Center Infrastructure in Asia"},{"url":"https://www.bdxworld.com/press-release/bdx-acquires-freehold-of-flagship-singapore-data-center/","title":"BDx Acquires Freehold of Flagship Singapore Data Center"},{"url":"https://www.bdxworld.com/press-release/bdx-achieves-certification-in-the-nvidia-dgx-ready-data-center-program/","title":"BDx Achieves Certification in the NVIDIA DGX-Ready Data Center Program"},{"url":"https://www.reuters.com/world/asia-pacific/indonesian-governor-orders-halt-data-centre-project-by-singapores-bdx-due-lack-2026-09-30/","title":"Indonesian governor orders halt on data-centre project by Singapore's BDx due to lack of permits","sourceName":"Reuters","publishedAt":"2026-09-30"},{"url":"https://www.straitstimes.com/asia/se-asia/singapores-bdx-ai-sticks-to-2027-target-after-indonesia-halts-work-on-data-centre","title":"BDx AI sets 2027 deadline after data centre construction halted","sourceName":"The Straits Times","publishedAt":"2026-10-03"},{"url":"https://www.thejakartapost.com/indonesia/2026/10/01/water-concerns-triggers-suspension-of-west-java-data-center-project","title":"Water concerns triggers suspension of West Java data center project","sourceName":"The Jakarta Post","publishedAt":"2026-09-30"},{"url":"https://x.com/tchsignal/status/2107183397571559706","title":"West Java ordered BDx to halt construction on its planned 640 MW AI campus","sourceName":"X / @tchsignal","publishedAt":"2026-10-05"}],"keyFacts":[{"label":"Ownership","value":"Majority-owned by I Squared Capital. Formed in 2020 as a joint venture of I Squared Capital and Bin Jiang Group; Bain Capital and Asia Pacific Capital invested."},{"label":"Footprint","value":"20+ data centers: 11 in Indonesia, plus Hong Kong, Singapore (SIN1), Taiwan and mainland China (Guangzhou, Nanjing)."},{"label":"PLN power deal (Jun 2026)","value":"1.2 GW from Indonesia's state utility PLN for a national AI platform, the largest such deal in Indonesia."},{"label":"Jakarta CGK4 campus","value":"Launched July 2024, designed to scale to 500 MW of renewable-powered capacity."},{"label":"Jatiluhur campus halted (reported, unconfirmed)","value":"West Java's governor halted the 640 MW Jatiluhur AI campus until permits are issued; BDx still targets a 120 MW first phase in early 2027."},{"label":"Debt financing","value":"A $320M loan (April 2026) and a $155M Singapore loan from DBS and OCBC (March 2024)."},{"label":"NVIDIA","value":"DGX-Ready certified (April 2025); hosts NVIDIA's sovereign AI cloud with Indosat and Lintasarta in Indonesia."},{"label":"Indonesia joint venture","value":"BDx Indonesia is co-owned with NeutraDC, Telkom Indonesia's data center arm."},{"label":"Customers","value":"Indosat Ooredoo Hutchison, Lintasarta, Singtel, HGC, Console Connect and Colt."},{"label":"Sustainability","value":"A 50 MW green power deal with HEXA Renewables (Sep 2025); first live use of Singapore's Tropical Data Centre Standard (Mar 2026)."}],"aliases":[],"collisionRisk":"low","reviewNote":null,"atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"tickerSymbol":null,"stockExchange":null,"secCik":null,"revenueUsd":null,"revenueBasis":null,"revenueAsOf":null,"employeeCount":400,"employeeCountBasis":"LinkedIn company page range 201-500 as of Aug 2026; midpoint estimate","employeeCountAsOf":"2026-08-01T00:00:00.000Z","marketCapUsd":null,"marketCapAsOf":null,"marketCapSource":null,"createdAt":"2026-08-27T18:29:41.383Z","updatedAt":"2026-10-12T21:33:03.697Z","jsonLd":{"@context":"https://schema.org","@type":"Organization","@id":"https://registry.deploy.report/companies/bdx-data-centers","url":"https://registry.deploy.report/companies/bdx-data-centers","name":"BDx Data Centers","description":"BDx Data Centers (Big Data Exchange) is a Singapore-headquartered colocation and hyperscale operator focused on Southeast Asia, Greater China, and India. The company was formed in 2020 as a joint venture backed by I Squared Capital and Bin Jiang Group, and today runs more than 20 facilities across Indonesia, Hong Kong, Singapore, Taiwan, and mainland China (Guangzhou and Nanjing).\n\nIts center of gravity has shifted decisively toward Indonesia, where the June 2026 agreement with state utility PLN locked in 1.2 GW of power for a national AI infrastructure platform, the largest single power commitment ever secured by a data center operator in the country. The Jakarta-area CGK4 campus, launched in 2024, is designed to scale to 500 MW of renewable-powered capacity. BDx Indonesia is co-owned with Telkom Indonesia subsidiary NeutraDC and serves as the anchor for NVIDIA's sovereign-AI cloud deal with Indosat Ooredoo Hutchison and Lintasarta.\n\nOutside Indonesia, BDx runs three Hong Kong facilities (HKG1/2/8), a Singapore flagship whose freehold it acquired in March 2024, a Taipei site, and Chinese facilities in Guangzhou and Nanjing. Recent financing includes a US$320 million loan announced in April 2026 to accelerate AI-ready buildout across Asia, on top of a US$155 million DBS/OCBC facility raised in March 2024 and a 2025 Hong Kong expansion financing.","identifier":"18375243-0a93-416c-af11-c07ea297a24f","foundingDate":"2019","address":"Singapore","publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"verified","maturity_stage":null,"lifecycle_state":null,"architectural_position":{"cohort":null,"sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":10,"primary_source_types":["secondary-established-publication"]}}}