{"id":"262083f0-2356-423e-bb7c-255f1a285576","name":"GE Vernova","slug":"ge-vernova","description":"Power, wind, and electrification business spun off from GE in 2024. Gas power, wind turbines, and grid. Public company (NYSE: GEV).","status":"public","founded":null,"hq":"Cambridge, MA","hqLat":42.3656347,"hqLng":-71.1040018,"hqGeocodedAt":"2026-08-05T00:51:01.579Z","hqAddress":null,"hqPrecision":null,"website":"gevernova.com","fundingTotal":null,"type":"both","roles":[],"reviewStatus":"reviewed","heatIndex":60,"lifecycleState":"active","supersededByCompanyId":null,"sources":[{"url":"https://www.gevernova.com/","title":"GE Vernova"},{"url":"https://www.prnewswire.com/news-releases/tva-first-us-utility-to-receive-construction-permit-for-bwrx-300-advanced-nuclear-reactor-302893324.html","title":"TVA First U.S. Utility to Receive Construction Permit for BWRX-300 Advanced Nuclear Reactor","sourceName":"PR Newswire (Tennessee Valley Authority)","publishedAt":"2026-09-29"},{"url":"https://www.nrc.gov/about-nrc/news-releases/2026/26-079","title":"NRC Approves Construction of Nation's First Small Modular Reactor","sourceName":"U.S. Nuclear Regulatory Commission","publishedAt":"2026-09-29"},{"url":"https://x.com/NRCgov/status/2104974977984287190","title":"NRC: first-ever U.S. commercial SMR construction permit (14 months)","sourceName":"X (@NRCgov)","publishedAt":"2026-09-29"},{"url":"https://www.nrc.gov/reactors/new-reactors/advanced/who-were-working-with/applicant-projects/clinch-river.html","title":"Clinch River Nuclear Site Application (NRC project page)","sourceName":"U.S. Nuclear Regulatory Commission","publishedAt":"2026-09-29"},{"url":"https://www.gevernova.com/news/press-releases/ge-vernova-crusoe-announce-major-29-unit-aeroderivative-gas-turbine-deliver-ai-data-centers","title":"GE Vernova and Crusoe announce major 29-unit aeroderivative gas turbine deal to deliver power to AI data centers","sourceName":"GE Vernova","publishedAt":"2025-07-22"},{"url":"https://crusoe.ai/newsroom/ge-vernova-and-crusoe-announce-major-29-unit-gas-turbine-deal","title":"GE Vernova and Crusoe announce major 29-unit aeroderivative gas turbine deal","sourceName":"Crusoe","publishedAt":"2025-07-22"},{"url":"https://x.com/GMitchellDaily/status/2107943456433906060","title":"GE Vernova and Crusoe 29-unit order recap","sourceName":"X/@GMitchellDaily","publishedAt":"2026-10-07"}],"keyFacts":[{"label":"Business","value":"Power, wind and electrification business spun off from GE in 2024, covering gas power, wind turbines and grid solutions."},{"label":"Turbine backlog","value":"Sold out through 2029, with order books stretching to 2031."},{"label":"Data center demand","value":"GSU transformer lead times average about 3 years; data centers now run $20B per GW."},{"label":"BWRX-300 permit (Sep 2026)","value":"The NRC issued TVA a construction permit for Clinch River Unit 1 at Oak Ridge, using the ~300 MW BWRX-300 SMR. An operating license is still required."},{"label":"BWRX-300 permit milestone (Sep 2026)","value":"TVA is the first U.S. utility permitted to build a BWRX-300; the NRC review took 14 months, ahead of schedule."},{"label":"Crusoe turbine order (company-claimed)","value":"Jul 2025: 29 LM2500XPRESS gas turbine packages for Crusoe AI data centers (10 ordered Dec 2024, 19 booked Jun 2025), nearly 1 GW. No newer order is confirmed."},{"label":"LM2500XPRESS package (company-claimed)","value":"About 35 MW each, dual fuel, about 95% factory assembled, with five-minute fast start and selective catalytic reduction."}],"aliases":[],"collisionRisk":"low","reviewNote":null,"atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"tickerSymbol":"GEV","stockExchange":"NYSE","secCik":null,"revenueUsd":null,"revenueBasis":null,"revenueAsOf":null,"employeeCount":null,"employeeCountBasis":null,"employeeCountAsOf":null,"marketCapUsd":null,"marketCapAsOf":null,"marketCapSource":null,"createdAt":"2026-06-08T04:34:44.925Z","updatedAt":"2026-10-13T02:44:34.618Z","jsonLd":{"@context":"https://schema.org","@type":"Organization","@id":"https://registry.deploy.report/companies/ge-vernova","url":"https://registry.deploy.report/companies/ge-vernova","name":"GE Vernova","description":"Power, wind, and electrification business spun off from GE in 2024. Gas power, wind turbines, and grid. Public company (NYSE: GEV).","identifier":"262083f0-2356-423e-bb7c-255f1a285576","address":"Cambridge, MA","publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"verified","maturity_stage":null,"lifecycle_state":null,"architectural_position":{"cohort":null,"sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":8,"primary_source_types":[]}}}