{"id":"701a709e-1378-454a-a488-e323a77cbb40","name":"LandBridge / PowerBridge","slug":"landbridge-powerbridge","description":"LandBridge / PowerBridge is a [data center](/datacenters) and powered-land infrastructure joint venture between NYSE-listed LandBridge Company LLC (NYSE: LB) and PowerBridge LLC, both portfolio companies of Five Point Infrastructure. LandBridge owns ~320,000 surface acres across the Permian Basin in West Texas and New Mexico; PowerBridge develops gigawatt-scale powered data center campuses on that land, integrating co-located power generation, campus electrical infrastructure, and a regional fiber network. Their flagship project is the Alpha Digital Campus — a 2 GW, ~3,400-acre site in Reeves County, TX, near the Waha natural gas hub, targeting hyperscaler AI workloads.","status":"public","founded":2021,"hq":"Houston, Texas, USA","hqLat":7.6130084,"hqLng":5.248172,"hqGeocodedAt":"2026-08-23T21:21:39.615Z","hqAddress":null,"hqPrecision":null,"website":"https://www.landbridge.com","fundingTotal":null,"type":"both","roles":[],"reviewStatus":"reviewed","heatIndex":52,"lifecycleState":"active","supersededByCompanyId":null,"sources":[],"keyFacts":[{"label":"Headquarters","value":"Undisclosed"},null,{"label":"Status","value":"private"},{"label":"Type","value":"brain"},"LandBridge CEO=Jason Long","PowerBridge CEO=Alex Hernandez","LandBridge CFO=Scott McNeely","Parent/Backer=Five Point Infrastructure (~$8B AUM)","LandBridge ticker=NYSE: LB","Flagship project=Alpha Digital Campus (2 GW, Reeves County, TX)","LandBridge 2025 revenue=$199.1M (+81% YoY)","PowerBridge equity commitment=$1 billion (Five Point)","LandBridge acreage=~320,000 surface acres (TX & NM)"],"aliases":[],"collisionRisk":"low","reviewNote":"SCOPE-REVIEW: Off-axis entity (data center/crypto/investment/telecom/energy) — not core physical AI","atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"tickerSymbol":"LB","stockExchange":"NYSE","secCik":null,"revenueUsd":null,"revenueBasis":null,"revenueAsOf":null,"employeeCount":null,"employeeCountBasis":null,"employeeCountAsOf":null,"marketCapUsd":null,"marketCapAsOf":null,"marketCapSource":null,"createdAt":"2026-08-19T23:30:59.950Z","updatedAt":"2026-08-28T05:03:53.655Z","jsonLd":{"@context":"https://schema.org","@type":"Organization","@id":"https://registry.deploy.report/companies/landbridge-powerbridge","url":"https://registry.deploy.report/companies/landbridge-powerbridge","name":"LandBridge / PowerBridge","description":"LandBridge / PowerBridge is a [data center](/datacenters) and powered-land infrastructure joint venture between NYSE-listed LandBridge Company LLC (NYSE: LB) and PowerBridge LLC, both portfolio companies of Five Point Infrastructure. LandBridge owns ~320,000 surface acres across the Permian Basin in West Texas and New Mexico; PowerBridge develops gigawatt-scale powered data center campuses on that land, integrating co-located power generation, campus electrical infrastructure, and a regional fiber network. Their flagship project is the Alpha Digital Campus — a 2 GW, ~3,400-acre site in Reeves County, TX, near the Waha natural gas hub, targeting hyperscaler AI workloads.","identifier":"701a709e-1378-454a-a488-e323a77cbb40","foundingDate":"2021","address":"Houston, Texas, USA","publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"claimed-not-verified","maturity_stage":null,"lifecycle_state":null,"architectural_position":{"cohort":null,"sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":0,"primary_source_types":[]}}}