{"id":"e8daca0f-7639-4aaa-9424-ba0ea31caffd","name":"PJM Interconnection","slug":"pjm-interconnection","description":"Largest U.S. regional transmission organization / grid operator, spanning Mid-Atlantic and Midwest states plus D.C. Tracked for AI data-center power and interconnection: on Sep 30 2026 delayed a planned reliability backstop capacity auction after partial FERC approval of its data-center-driven procurement framework (Utility Dive reporting).","status":"nonprofit","founded":null,"hq":"Audubon, Pennsylvania, USA","hqLat":40.1311744,"hqLng":-75.4227989,"hqGeocodedAt":"2026-10-10T04:23:31.485Z","hqAddress":null,"hqPrecision":null,"website":"https://www.pjm.com","fundingTotal":null,"type":"hardware","roles":[],"reviewStatus":"reviewed","heatIndex":0,"lifecycleState":"active","supersededByCompanyId":null,"sources":[{"url":"https://www.utilitydive.com/news/pjm-delays-backstop-procurement-ferc-data-center/831751/","title":"FERC chair slams PJM 'mess' as country's largest grid operator delays power auction","sourceName":"Utility Dive","publishedAt":"2026-09-30"},{"url":"https://www.pjm.com/about-pjm","title":"About PJM","sourceName":"PJM Interconnection"},{"url":"https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20261009-3055","title":"Order Accepting Tariff Revisions in Part and Rejecting Tariff Revisions in Part re PJM under ER26-3515","sourceName":"FERC eLibrary","publishedAt":"2026-10-09"},{"url":"https://www.utilitydive.com/news/ferc-pjm-large-load-interconnection-iras-byonc/832716/","title":"FERC rejects most of PJM's large load interconnection plan","sourceName":"Utility Dive","publishedAt":"2026-10-12"},{"url":"https://www.energy.gov/articles/energy-secretary-secures-mid-atlantic-grid-ahead-anticipated-stressed-system-conditions","title":"Energy Secretary Secures Mid-Atlantic Grid","sourceName":"U.S. Department of Energy","publishedAt":"2026-10-12"},{"url":"https://www.energy.gov/ceser/2026-doe-202c-orders","title":"2026 DOE 202(c) Orders","sourceName":"DOE CESER","publishedAt":"2026-10-12"},{"url":"https://www.pjm.com/pjmfiles/directory/etariff/FercOrders/9207/20261009-er26-3515-000.pdf","title":"FERC order on PJM Large Load proposal, Docket ER26-3515-000","sourceName":"FERC (via PJM)","publishedAt":"2026-10-09"},{"url":"https://www.pjm.com/pjmfiles/directory/etariff/FercOrders/9154/20260929-er26-3380-000.pdf","title":"FERC order on PJM Reliability Backstop Procurement, Docket ER26-3380-000","sourceName":"FERC (via PJM)","publishedAt":"2026-09-29"},{"url":"https://insidelines.pjm.com/ferc-accepts-pjm-reliability-backstop-proposal/","title":"FERC Accepts PJM Reliability Backstop Proposal","sourceName":"PJM Inside Lines","publishedAt":"2026-09-30"},{"url":"https://www.publicpower.org/periodical/article/ferc-accepts-elements-pjm-proposal-tied-large-loads-rejects-others","title":"FERC Accepts Elements of PJM Proposal Tied to Large Loads, Rejects Others","sourceName":"American Public Power Association","publishedAt":"2026-10-13"},{"url":"https://x.com/SigForseti/status/2111492818657005702","title":"PJM asked FERC for two data center fixes this fall","sourceName":"X / SigForseti","publishedAt":"2026-10-17"}],"keyFacts":[{"label":"Role (company-claimed)","value":"A regional transmission organization coordinating wholesale electricity in all or parts of 13 states and DC."},{"label":"Backstop target (reported, Sep 2026)","value":"PJM aimed to buy about 6.8 GW of new capacity to cover a shortfall from the 2028/29 capacity auction."},{"label":"Open FERC issues (company-claimed)","value":"Cost allocation, transmission-owner exit rules and load-serving entity collateral."},{"label":"DOE Order 202-26-50 (government-stated)","value":"DOE Order 202-26-50 (Oct 12) for PJM, effective Oct 13-16: dispatch specified units and, as last resort, backup generation at large loads amid high demand and maintenance outages."},{"label":"Backstop procurement suspended (government-stated)","value":"FERC accepted PJM's Reliability Backstop Procurement on Sep 29 2026 but suspended it five months, to a Feb 28 2027 effective date. PJM dropped the Sep 30 start; new timing not set."},{"label":"Large Load order (government-stated, Oct 2026)","value":"FERC on Oct 9 2026 accepted PJM's Large Load definition and Large Load Registry, effective Oct 12, and rejected the IRAS curtailment framework and BYONC rules."},{"label":"Large Load threshold (government-stated)","value":"50 MW cumulative peak at one site, with affiliated loads within a one-mile radius combined and co-located and behind-the-meter loads included."}],"aliases":["PJM","PJM Interconnection LLC","PJM Interconnection, L.L.C."],"collisionRisk":"low","reviewNote":null,"atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"tickerSymbol":null,"stockExchange":null,"secCik":null,"revenueUsd":null,"revenueBasis":null,"revenueAsOf":null,"employeeCount":null,"employeeCountBasis":null,"employeeCountAsOf":null,"marketCapUsd":null,"marketCapAsOf":null,"marketCapSource":null,"createdAt":"2026-09-30T20:51:48.323Z","updatedAt":"2026-10-17T20:56:11.495Z","jsonLd":{"@context":"https://schema.org","@type":"Organization","@id":"https://registry.deploy.report/companies/pjm-interconnection","url":"https://registry.deploy.report/companies/pjm-interconnection","name":"PJM Interconnection","alternateName":["PJM","PJM Interconnection LLC","PJM Interconnection, L.L.C."],"description":"Largest U.S. regional transmission organization / grid operator, spanning Mid-Atlantic and Midwest states plus D.C. Tracked for AI data-center power and interconnection: on Sep 30 2026 delayed a planned reliability backstop capacity auction after partial FERC approval of its data-center-driven procurement framework (Utility Dive reporting).","identifier":"e8daca0f-7639-4aaa-9424-ba0ea31caffd","address":"Audubon, Pennsylvania, USA","publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"verified","maturity_stage":null,"lifecycle_state":null,"architectural_position":{"cohort":null,"sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":11,"primary_source_types":["primary-government-record"]}}}