{"id":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","name":"Crusoe","slug":"crusoe","description":"Crusoe started in 2018 as a stranded-energy play, running Bitcoin miners on flare gas at oil wellheads in the Bakken and Permian, then pivoted hard into AI compute as the training market took off. In early 2025 it divested the Bitcoin mining business to NYDIG and rebranded around a single thesis: an \"energy-first AI factory company\" that builds and operates its own campuses rather than reselling colocation. The result is a vertically integrated stack, from power procurement and site development through data center construction to a managed GPU cloud and, most recently, a serverless fine-tuning and inference layer called Crusoe Intelligence Foundry.\n\nThe company's flagship site is the Abilene, Texas campus, originally announced as the anchor build for the Oracle-led Stargate project supporting OpenAI training workloads, and now serving Microsoft AI capacity as well. Crusoe says its contracted AI infrastructure pipeline is approaching five gigawatts across sites including Abilene, a newly announced 1.0 GW campus in Childress with Lancium, and international expansion in Iceland (via atNorth), Norway (Polar) and Argentina. Announced power deals with Bergen Engines, ON.energy, Form Energy and a nuclear partnership with Aalo Atomics signal a strategy of locking in low-cost, purpose-built energy well ahead of GPU delivery.\n\nCompared with the rest of the neocloud pack, Crusoe is distinctive on two axes: it is a builder-operator, not primarily a lessor of hyperscale colocation, and its go-to-market spans both hyperscaler-scale anchor tenants (Microsoft, and via Stargate the OpenAI workload) and a long tail of AI-native startups (Cursor, Fireworks, Together AI, Modal, Baseten, Luma, HeyGen, Figure, Cognition). That mix places it in the same conversation as CoreWeave and Lambda for training capacity, while its energy-development posture more closely resembles Crusoe's own Bitcoin-era competitors and traditional data center developers than pure GPU-cloud peers.","status":"private","founded":2018,"hq":"Denver, Colorado, USA","hqLat":39.7392364,"hqLng":-104.984862,"hqGeocodedAt":"2026-08-23T21:31:13.454Z","hqAddress":null,"hqPrecision":null,"website":"https://crusoe.ai","fundingTotal":null,"type":"infrastructure","roles":["data_center_operator"],"reviewStatus":"reviewed","heatIndex":50,"lifecycleState":"active","supersededByCompanyId":null,"sources":[{"url":"https://crusoe.ai","title":"Crusoe corporate site"},{"url":"https://crusoe.ai/newsroom","title":"Crusoe Newsroom (2026 announcements)"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoes-contracted-ai-infrastructure-capacity-approaches-5-gigawatts-across-data-centers-and-cloud","title":"Crusoe contracted capacity approaches 5 GW","sourceName":"Crusoe","publishedAt":"2026-06-09"},{"url":"https://www.globenewswire.com/news-release/2026/09/17/3364326/0/en/crusoe-raises-3-9-billion-series-f-for-its-vertically-integrated-ai-infrastructure-platform.html","title":"Crusoe Raises $3.9 Billion Series F","sourceName":"GlobeNewswire / Crusoe"},{"url":"https://www.reuters.com/business/ai-infrastructure-provider-crusoe-valued-309-billion-latest-funding-round-2026-09-17/","title":"AI infrastructure provider Crusoe valued at $30.9 billion in latest funding round","sourceName":"Reuters"},{"url":"https://newsletter.semianalysis.com/p/clustermax-30-the-industry-standard","title":"ClusterMAX 3.0: The Industry Standard GPU Cloud Rating System Returns","sourceName":"SemiAnalysis","publishedAt":"2026-09-23"},{"url":"https://x.com/SemiAnalysis_/status/2102871810123383166","title":"SemiAnalysis announces ClusterMAX 3.0 on X","sourceName":"X (@SemiAnalysis_)","publishedAt":"2026-09-23"},{"url":"https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/","title":"Construction underway on six-building Claude data center (Project Llano open house)","sourceName":"KFDA NewsChannel 10","publishedAt":"2026-09-23"},{"url":"https://www.datacenterdynamics.com/en/news/crusoe-files-for-two-more-data-centers-at-goodnight-campus-in-armstrong-county-texas/","title":"Crusoe files for two more data centers at Goodnight Campus (Project Llano)","sourceName":"Data Center Dynamics","publishedAt":"2026-07-30"},{"url":"https://x.com/drmikemyers/status/2102925201029681212","title":"Project Llano Claude TX open-house coverage (secondary X)","sourceName":"X (@drmikemyers)","publishedAt":"2026-09-23"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-thinking-machines-lab-inference-partnership","title":"Crusoe and Thinking Machines Lab Partner to Power Open-Model Inference at Scale","sourceName":"Crusoe","publishedAt":"2026-09-23"},{"url":"https://www.globenewswire.com/news-release/2026/09/23/3367648/0/en/crusoe-and-thinking-machines-lab-partner-to-power-open-model-inference-at-scale.html","title":"Crusoe and Thinking Machines Lab Partner to Power Open-Model Inference at Scale","sourceName":"GlobeNewswire (Crusoe)","publishedAt":"2026-09-23"},{"url":"https://techcrunch.com/2026/09/25/crusoe-abandons-1-25b-plan-to-use-boom-turbines-at-ai-data-centers/","title":"Crusoe abandons $1.25B plan to use Boom turbines at AI data centers","sourceName":"TechCrunch (Kirsten Korosec)","publishedAt":"2026-09-25"},{"url":"https://x.com/bscholl/status/2103614826862010443","title":"Blake Scholl: Crusoe and Boom no longer launching Superpower turbines together","sourceName":"X (@bscholl)","publishedAt":"2026-09-25"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas","title":"Crusoe Developing Data Center Campus in Armstrong County, Texas","sourceName":"Crusoe","publishedAt":"2026-09-28"},{"url":"https://www.datacenterdynamics.com/en/news/google-named-as-customer-for-crusoes-data-center-campus-in-amarillo-texas/","title":"Google named as customer for Crusoe's data center campus in Amarillo, Texas","sourceName":"Data Center Dynamics","publishedAt":"2026-09-29"},{"url":"https://www.gevernova.com/news/press-releases/ge-vernova-crusoe-announce-major-29-unit-aeroderivative-gas-turbine-deliver-ai-data-centers","title":"GE Vernova and Crusoe announce major 29-unit aeroderivative gas turbine deal to deliver power to AI data centers","sourceName":"GE Vernova","publishedAt":"2025-07-22"},{"url":"https://crusoe.ai/newsroom/ge-vernova-and-crusoe-announce-major-29-unit-gas-turbine-deal","title":"GE Vernova and Crusoe announce major 29-unit aeroderivative gas turbine deal","sourceName":"Crusoe","publishedAt":"2025-07-22"},{"url":"https://x.com/GMitchellDaily/status/2107943456433906060","title":"GE Vernova and Crusoe 29-unit order recap","sourceName":"X/@GMitchellDaily","publishedAt":"2026-10-07"},{"url":"https://www.crusoe.ai/about/leadership","title":"Crusoe Leadership","sourceName":"Crusoe"}],"keyFacts":[{"label":"Positioning","value":"An energy-first AI factory company: power and site development through GPU cloud and Intelligence Foundry inference and fine-tuning."},{"label":"Capacity (company-claimed)","value":"Sep 2026: 6 GW+ contracted, with 1 GW delivered and operating, and a pipeline above 40 GW."},{"label":"Series F (company-stated, Sep 2026)","value":"$3.9B initial close at a $30.9B post-money valuation, co-led by Atreides Management, Mubadala Capital and Valor Equity Partners."},{"label":"Contracted value (company-claimed)","value":"$140B+ total contracted value across the platform. Unaudited."},{"label":"Abilene flagship","value":"A 900+ MW AI factory in Abilene, Texas, first built for OpenAI's Stargate training buildout and now also serving Microsoft."},{"label":"Google campus (company-claimed)","value":"Sep 2026: Developer of Google's Armstrong County campus near Amarillo (Project Llano), powered mainly by the adjacent Goodnight wind farms; first handoff early 2027."},{"label":"Expansion","value":"A 1 GW campus in Childress, Texas with Lancium, plus sites in Iceland (atNorth), Norway (Polar) and Argentina."},{"label":"Customers","value":"Microsoft, plus AI-native tenants including Cursor, Fireworks, Together AI, Modal, Baseten, Luma, HeyGen, Figure, Cognition and Roboflow."},{"label":"Thinking Machines deal (company-claimed)","value":"Sep 2026: $65M a year for Thinking Machines Lab inference on B200 systems, taking Managed Inference past $100M of contracted ARR."},{"label":"Hardware","value":"NVIDIA GB200 NVL72, B200, H200 and H100 plus AMD MI355X and MI300X; no aggregate GPU count is published."},{"label":"Energy deals (2026)","value":"750 MW of gas power with Bergen Engines, 5 GW of AI UPS with ON.energy, 12 GWh of iron-air storage with Form Energy, plus Aalo Atomics and Redwood Materials."},{"label":"Gas turbines","value":"29 GE Vernova LM2500XPRESS turbines, nearly 1 GW, ordered in 2024-2025. A 1.2 GW Boom Superpower turbine deal ended in September 2026."},{"label":"Bitcoin exit","value":"Sold its Bitcoin mining business to NYDIG in early 2025 to focus on AI infrastructure."},{"label":"European HQ","value":"Dublin, Ireland, opened February 2025."},{"label":"SemiAnalysis ClusterMAX 3.0 (Sep 2026)","value":"Dropped to Bronze."}],"aliases":["Crusoe Energy","Crusoe Energy Systems","Crusoe / Oracle / OpenAI (Stargate)"],"collisionRisk":"low","reviewNote":"SCOPE-REVIEW: Off-axis entity (data center/crypto/investment/telecom/energy) — not core physical AI","atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"tickerSymbol":null,"stockExchange":null,"secCik":null,"revenueUsd":null,"revenueBasis":null,"revenueAsOf":null,"employeeCount":700,"employeeCountBasis":"approximate; Crusoe has not published a headcount, prior press coverage placed it in the 500-800 range through 2024-2025","employeeCountAsOf":"2025-01-01T00:00:00.000Z","marketCapUsd":null,"marketCapAsOf":null,"marketCapSource":null,"createdAt":"2026-08-19T04:38:43.225Z","updatedAt":"2026-10-22T17:23:43.737Z","jsonLd":{"@context":"https://schema.org","@type":"Organization","@id":"https://registry.deploy.report/companies/crusoe","url":"https://registry.deploy.report/companies/crusoe","name":"Crusoe","alternateName":["Crusoe Energy","Crusoe Energy Systems","Crusoe / Oracle / OpenAI (Stargate)"],"description":"Crusoe started in 2018 as a stranded-energy play, running Bitcoin miners on flare gas at oil wellheads in the Bakken and Permian, then pivoted hard into AI compute as the training market took off. In early 2025 it divested the Bitcoin mining business to NYDIG and rebranded around a single thesis: an \"energy-first AI factory company\" that builds and operates its own campuses rather than reselling colocation. The result is a vertically integrated stack, from power procurement and site development through data center construction to a managed GPU cloud and, most recently, a serverless fine-tuning and inference layer called Crusoe Intelligence Foundry.\n\nThe company's flagship site is the Abilene, Texas campus, originally announced as the anchor build for the Oracle-led Stargate project supporting OpenAI training workloads, and now serving Microsoft AI capacity as well. Crusoe says its contracted AI infrastructure pipeline is approaching five gigawatts across sites including Abilene, a newly announced 1.0 GW campus in Childress with Lancium, and international expansion in Iceland (via atNorth), Norway (Polar) and Argentina. Announced power deals with Bergen Engines, ON.energy, Form Energy and a nuclear partnership with Aalo Atomics signal a strategy of locking in low-cost, purpose-built energy well ahead of GPU delivery.\n\nCompared with the rest of the neocloud pack, Crusoe is distinctive on two axes: it is a builder-operator, not primarily a lessor of hyperscale colocation, and its go-to-market spans both hyperscaler-scale anchor tenants (Microsoft, and via Stargate the OpenAI workload) and a long tail of AI-native startups (Cursor, Fireworks, Together AI, Modal, Baseten, Luma, HeyGen, Figure, Cognition). That mix places it in the same conversation as CoreWeave and Lambda for training capacity, while its energy-development posture more closely resembles Crusoe's own Bitcoin-era competitors and traditional data center developers than pure GPU-cloud peers.","identifier":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","foundingDate":"2018","address":"Denver, Colorado, USA","publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"verified","maturity_stage":null,"lifecycle_state":null,"architectural_position":{"cohort":null,"sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":20,"primary_source_types":["secondary-established-publication","secondary-industry-publication"]}}}