{"energized_gw_index":{"announced_gw":128.03900000000004,"energized_gw":5.5563,"announced_minus_energized_gw":122.483,"campuses":103},"count":103,"datacenters":[{"id":"f4db62f3-047f-4383-9e2b-f8b82f95b418","slug":"bytedance-pecem-ceara","name":"ByteDance Pecem Data Center Campus (TikTok)","aliases":[],"locationId":"282e1878-9cb0-4a88-adb9-1c0f494ff50b","lat":null,"lng":null,"landStatus":null,"lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"ByteDance (TikTok parent) is building what would be its largest data-center campus outside China at the Pecem port/industrial complex in Ceara, with a reported ~US$39bn program. An initial ~200 MW IT phase (about 20 data halls, ~300 MW power envelope) is designed to scale toward nearly 1 GW, underpinned by a US$2bn, 20-year wind-power PPA with Casa dos Ventos.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.bnamericas.com/en/news/casa-dos-ventos-signs-us2bn-tiktok-power-supply-deal","title":"Casa dos Ventos signs US$2bn TikTok data center power supply deal (BNamericas)"},{"url":"https://www.datacenterdynamics.com/en/news/casa-dos-ventos-granted-approval-to-construct-tiktok-backed-300mw-data-center-in-brazil-report/","title":"Casa dos Ventos granted approval to construct TikTok-backed 300MW data center (DCD)"},{"url":"https://www.bloomberg.com/news/articles/2026-07-01/tiktok-creator-bytedance-picks-brazil-for-largest-data-center-outside-china","title":"ByteDance Picks Brazil for Largest Data Center Outside China (Bloomberg)"},{"url":"https://w.media/bytedance-begins-construction-of-us-38-44-billion-data-center-in-brazil/","title":"ByteDance begins construction of US$38.44bn data center in Brazil (w.media)"},{"url":"https://newenergyevents.com/tiktok-omnia-and-casa-dos-ventos-to-invest-us9-8-billion-in-200-mw-data-center-hub-in-pecem-ceara/","title":"TikTok, Omnia and Casa dos Ventos to invest US$9.8bn in 200 MW data center hub in Pecem (New Energy Events)"}],"reviewNote":null,"createdAt":"2026-08-19T00:50:54.466Z","updatedAt":"2026-08-19T00:50:54.864Z","capacityClaims":[{"id":"7a7e96bc-575e-4680-942d-58df0df3a8c2","dataCenterId":"f4db62f3-047f-4383-9e2b-f8b82f95b418","series":"announced","valueGw":0.9,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://w.media/bytedance-begins-construction-of-us-38-44-billion-data-center-in-brazil/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Full-buildout target of ~900 MW toward near 1 GW.","createdAt":"2026-08-19T00:50:55.546Z"},{"id":"b99bd9a5-a95f-4dfc-991a-f58a39c21cfd","dataCenterId":"f4db62f3-047f-4383-9e2b-f8b82f95b418","series":"under_construction","valueGw":0.2,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://newenergyevents.com/tiktok-omnia-and-casa-dos-ventos-to-invest-us9-8-billion-in-200-mw-data-center-hub-in-pecem-ceara/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Initial ~200 MW IT phase (about 20 data halls).","createdAt":"2026-08-19T00:50:56.393Z"},{"id":"052c34da-9405-46a6-916d-9862d9df59a4","dataCenterId":"f4db62f3-047f-4383-9e2b-f8b82f95b418","series":"announced","valueGw":0.3,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/casa-dos-ventos-granted-approval-to-construct-tiktok-backed-300mw-data-center-in-brazil-report/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Casa dos Ventos approved to construct a 300 MW power envelope for phase 1.","createdAt":"2026-08-19T00:50:57.421Z"}],"location":{"name":"Pecem","slug":"pecem-ceara"},"capacity_picture":{"announced_gw":0.9,"energized_gw":null,"announced_minus_energized_gw":0.9}},{"id":"f16e490e-0625-4aba-89cc-c734381df6fb","slug":"scala-ai-city-eldorado-do-sul","name":"Scala AI City","aliases":[],"locationId":"362591aa-a301-41e7-aafd-31a0f401dd23","lat":null,"lng":null,"landStatus":"private","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"DigitalBridge-backed Scala Data Centers plans a gigawatt-scale AI data-center campus on a ~10 million m2 site near Porto Alegre, targeting 4.75 GW at full buildout. Brazil's Ministry of Mines and Energy authorized a 5 GW ramp-up connection to the national grid (SIN) in May 2025; an initial 54 MW phase is planned.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html","title":"Scala AI City: Brazil's MME Approves 5 GW Power Connection (PR Newswire)"},{"url":"https://www.datacenterdynamics.com/en/news/scala-ai-city-scala-pitches-50bn-brazil-data-center-campus-of-up-to-47gw/","title":"Scala pitches $50bn Brazil data center campus of up to 4.7GW (DCD)"},{"url":"https://www.intelligentcio.com/latam/2025/05/15/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul/","title":"Brazil's MME approves 5 GW power connection (Intelligent CIO LATAM)"}],"reviewNote":null,"createdAt":"2026-08-19T00:50:43.378Z","updatedAt":"2026-08-19T00:50:43.763Z","capacityClaims":[{"id":"2e296472-e685-4424-8909-c917e36d08ff","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","series":"announced","valueGw":4.75,"asOf":"2025-05-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Full buildout target across a 10 million m2 site.","createdAt":"2026-08-19T00:50:44.468Z"},{"id":"ab84e830-fd49-4d67-80c6-c8c12e177abb","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","series":"contracted","valueGw":5,"asOf":"2025-05-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/scala-ai-city-scala-pitches-50bn-brazil-data-center-campus-of-up-to-47gw/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"MME-authorized 5 GW ramp-up connection to the SIN grid.","createdAt":"2026-08-19T00:50:45.311Z"},{"id":"a3f9bd30-b672-49d8-aad3-dd89ea793645","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","series":"under_construction","valueGw":0.054,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Initial 54 MW Phase 1 IT capacity.","createdAt":"2026-08-19T00:50:46.163Z"}],"location":{"name":"Eldorado do Sul","slug":"eldorado-do-sul-rio-grande-do-sul"},"capacity_picture":{"announced_gw":4.75,"energized_gw":null,"announced_minus_energized_gw":4.75}},{"id":"39db4fd5-4ac9-48b0-bc19-fc031e5561a3","slug":"airtrunk-jhb1-johor-bahru","name":"AirTrunk JHB1 Johor Bahru Data Centre","aliases":[],"locationId":"ab7c8d4c-e1d0-4051-aa23-6bce4790f070","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"AirTrunk's first Southeast Asia facility, a 150MW hyperscale AI-ready campus on 10.3 hectares in Johor Bahru, commenced operations July 30, 2024 with over 50MW live across initial phases; features direct-to-chip liquid cooling, PUE of 1.15, over 1MW onsite solar and 30MW renewable secured via a virtual PPA.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://airtrunk.com/airtrunk-opens-ai-ready-data-centre-in-malaysia-accelerating-innovation-and-the-energy-transition/","title":"AirTrunk opens AI-ready data centre in Malaysia - AirTrunk"},{"url":"https://w.media/airtrunk-opens-150mw-hyperscale-data-center-in-johor-bahru/","title":"AirTrunk Opens 150MW Hyperscale Data Center in Johor Bahru - w.media"}],"reviewNote":null,"createdAt":"2026-08-19T00:50:34.173Z","updatedAt":"2026-08-19T00:50:34.556Z","capacityClaims":[{"id":"da635457-33fe-46df-a77c-1e320c9418d2","dataCenterId":"39db4fd5-4ac9-48b0-bc19-fc031e5561a3","series":"announced","valueGw":0.15,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://airtrunk.com/airtrunk-opens-ai-ready-data-centre-in-malaysia-accelerating-innovation-and-the-energy-transition/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Total planned capacity 150MW, scalable beyond; over 50MW live at launch","createdAt":"2026-08-19T00:50:35.252Z"},{"id":"c2b1576a-2910-485c-9ac9-62b5dd44fad8","dataCenterId":"39db4fd5-4ac9-48b0-bc19-fc031e5561a3","series":"energized","valueGw":0.05,"asOf":"2024-07-01T00:00:00.000Z","sourceUrl":"https://w.media/airtrunk-opens-150mw-hyperscale-data-center-in-johor-bahru/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Over 50MW live across initial phases at July 2024 opening","createdAt":"2026-08-19T00:50:36.101Z"}],"location":{"name":"Johor Bahru","slug":"johor-bahru-johor"},"capacity_picture":{"announced_gw":0.15,"energized_gw":0.05,"announced_minus_energized_gw":0.09999999999999999}},{"id":"b19de519-2b16-4f70-baee-26c45cc196a3","slug":"sk-aws-ulsan-ai-data-center","name":"SK Group + AWS Ulsan AI Data Center","aliases":[],"locationId":"52e227cb-5e34-4de3-b82d-0207cca6a045","lat":null,"lng":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"SK Group and AWS broke ground in 2025 on a 36,000 sqm site in Ulsan's Mipo National Industrial Complex for what is billed as Korea's largest AI data center: 60,000 GPUs, 41MW by November 2027 and full 103MW by February 2029, sited next to SK Gas' LNG combined-cycle plant with future scaling toward 1GW.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.koreaherald.com/article/10510141","title":"SK, AWS to build Korea's largest AI data center in Ulsan - The Korea Herald"},{"url":"https://www.kedglobal.com/tech,-media-telecom/newsView/ked202506160002","title":"SK, AWS to build South Korea's largest, multibillion-dollar AI data center - KED Global"},{"url":"https://eng.sk.com/news/sk-group-and-aws-team-up-to-build-cloud-computing-infrastructure-to-support-ai-innovation","title":"SK Group and AWS Team Up to Build Cloud Computing Infrastructure - SK"}],"reviewNote":null,"createdAt":"2026-08-19T00:50:24.201Z","updatedAt":"2026-08-19T00:50:24.581Z","capacityClaims":[{"id":"68abefb1-56f5-4aa8-81a4-aa45e2746c0f","dataCenterId":"b19de519-2b16-4f70-baee-26c45cc196a3","series":"announced","valueGw":0.103,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.koreaherald.com/article/10510141","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Full buildout 103MW by February 2029; future scaling to 1GW","createdAt":"2026-08-19T00:50:25.267Z"},{"id":"948bd6ee-5225-4815-ad78-a75e65c83456","dataCenterId":"b19de519-2b16-4f70-baee-26c45cc196a3","series":"under_construction","valueGw":0.041,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.kedglobal.com/tech,-media-telecom/newsView/ked202506160002","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"First phase 41MW by November 2027","createdAt":"2026-08-19T00:50:26.100Z"}],"location":{"name":"Ulsan","slug":"ulsan-ulsan"},"capacity_picture":{"announced_gw":0.103,"energized_gw":null,"announced_minus_energized_gw":0.103}},{"id":"54a987fd-de69-42a8-8460-604b263334e5","slug":"softbank-hokkaido-tomakomai-ai-data-center","name":"SoftBank Hokkaido Tomakomai AI Data Center","aliases":[],"locationId":"8b594284-e3c8-42e5-91e3-d43cb3ef345e","lat":null,"lng":null,"landStatus":null,"lifecycleState":"under_construction","powerSourceMix":"other","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":173,"totalBuildingSqft":null,"streetAddress":null,"notes":"SoftBank and subsidiary IDC Frontier broke ground on a 700,000 sqm AI data center campus in Tomakomai on April 15, 2025; a 50MW first phase targets fiscal 2026 with ultimate capacity expected to exceed 300MW, powered entirely by renewable energy sourced within Hokkaido.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.softbank.jp/en/sbnews/entry/20250501_01","title":"Laying the Foundation for the AI Era: Construction Begins on 'Hokkaido Tomakomai AI Data Center' - SoftBank News"},{"url":"https://w.media/softbank-breaks-ground-for-ai-data-center-in-hokkaido/","title":"SoftBank breaks ground for AI data center in Hokkaido - w.media"}],"reviewNote":null,"createdAt":"2026-08-19T00:50:14.303Z","updatedAt":"2026-08-19T01:32:33.224Z","capacityClaims":[{"id":"f66260be-7976-4004-97be-c7e9eabf4b46","dataCenterId":"54a987fd-de69-42a8-8460-604b263334e5","series":"announced","valueGw":0.3,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.softbank.jp/en/sbnews/entry/20250501_01","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Ultimate capacity 'expected to exceed 300 megawatts' per SoftBank","createdAt":"2026-08-19T00:50:15.369Z"},{"id":"11589353-b20b-4823-8d8d-46e302998f54","dataCenterId":"54a987fd-de69-42a8-8460-604b263334e5","series":"under_construction","valueGw":0.05,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://w.media/softbank-breaks-ground-for-ai-data-center-in-hokkaido/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"First phase (50MW), completion targeted 2026","createdAt":"2026-08-19T00:50:16.229Z"}],"location":{"name":"Tomakomai","slug":"tomakomai-hokkaido"},"capacity_picture":{"announced_gw":0.3,"energized_gw":null,"announced_minus_energized_gw":0.3}},{"id":"b0ab3fbf-df7d-4bcd-bc2e-a5532cf92542","slug":"google-visakhapatnam-ai-hub","name":"Google Visakhapatnam AI Hub (Adani-Google Data Centre Campus)","aliases":[],"locationId":"1664814b-e6aa-4733-96af-1d7cfb6b8adb","lat":null,"lng":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Google broke ground on 28 April 2026 in Visakhapatnam (Tarluvada) on a gigawatt-scale AI data centre campus developed with AdaniConneX and Nxtra by Airtel, backed by up to USD 15 billion of Google investment in Andhra Pradesh over 2026-2030. Andhra Pradesh allotted 480 acres for the project.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.adani.com/newsroom/media-releases/adani-and-google-partner-to-build-indias-largest-data-centre-campus-in-visakhapatnam","title":"Adani and Google Partner to Build India's Largest Data Centre Campus in Visakhapatnam"},{"url":"https://www.googlecloudpresscorner.com/2026-04-28-Google-Breaks-Ground-on-India-AI-Hub,-Launching-a-National-Industrial-Ecosystem-Alongside-Indias-Digital-Infrastructure-Milestone","title":"Google Breaks Ground on India AI Hub in Visakhapatnam"},{"url":"https://www.datacenterdynamics.com/en/news/google-confirms-15bn-data-center-project-in-andhra-pradesh-india/","title":"Google confirms $15bn data center project in Andhra Pradesh, India - DCD"}],"reviewNote":null,"createdAt":"2026-08-19T00:50:04.455Z","updatedAt":"2026-08-19T00:50:04.839Z","capacityClaims":[{"id":"b230571f-94e5-46ba-ab7d-6e00b20e9a22","dataCenterId":"b0ab3fbf-df7d-4bcd-bc2e-a5532cf92542","series":"announced","valueGw":1,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/google-confirms-15bn-data-center-project-in-andhra-pradesh-india/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Described officially as 'gigawatt-scale'; 1 GW figure per reporting","createdAt":"2026-08-19T00:50:05.544Z"}],"location":{"name":"Visakhapatnam","slug":"visakhapatnam-andhra-pradesh"},"capacity_picture":{"announced_gw":1,"energized_gw":null,"announced_minus_energized_gw":1}},{"id":"25bf5c01-cce5-40a8-b6e6-2480d1f09dbd","slug":"reliance-jamnagar-ai-data-centre","name":"Reliance Jamnagar AI-Enabled Data Centre","aliases":[],"locationId":"1330fe7c-45e4-4cb7-9407-76b4e52d2a5c","lat":null,"lng":null,"landStatus":"private","lifecycleState":"announced","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":"Cooled with desalinated seawater from the Gulf of Kutch; Meta covers full cost of energy and water for the leased block.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Reliance Industries will design, build and operate an AI-enabled data centre in its Jamnagar complex, with a 168 MW built-to-suit block leased by Meta (delivered within two years, option to scale). Reported broader ambition is a green-powered 3 GW campus with Nvidia Blackwell compute.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.ril.com/sites/default/files/2026-06/10062026_MR_Reliance_and_Meta_to_Develop_AI-Enabled_Data_Centre_in_Jamnagar_Gujarat.pdf","title":"RIL Media Release: Reliance and Meta to Develop AI-Enabled Data Centre in Jamnagar, Gujarat"},{"url":"https://datacenters.atmeta.com/2026/06/bringing-ai-enabled-infrastructure-to-india/","title":"Meta Data Centers: Bringing AI-Enabled Infrastructure to India"},{"url":"https://www.lightreading.com/data-centers/india-s-reliance-is-building-massive-3gw-data-center-report","title":"India's Reliance is building massive 3GW data center - report"}],"reviewNote":null,"createdAt":"2026-08-19T00:49:54.428Z","updatedAt":"2026-08-19T01:33:23.402Z","capacityClaims":[{"id":"6091427a-c65c-47b0-a35c-922bfed1a63b","dataCenterId":"25bf5c01-cce5-40a8-b6e6-2480d1f09dbd","series":"announced","valueGw":0.168,"asOf":"2026-06-10T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/2026/06/bringing-ai-enabled-infrastructure-to-india/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Built-to-suit block leased by Meta; delivered within two years, option to scale","createdAt":"2026-08-19T00:49:55.690Z"},{"id":"d44bc679-0ccc-4726-b2a6-18acb75eeee0","dataCenterId":"25bf5c01-cce5-40a8-b6e6-2480d1f09dbd","series":"announced","valueGw":3,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.lightreading.com/data-centers/india-s-reliance-is-building-massive-3gw-data-center-report","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Reported full-campus ambition; not officially confirmed by RIL","createdAt":"2026-08-19T00:49:56.558Z"},{"id":"dd4ec363-69bb-4248-85d3-9642c0a505fc","dataCenterId":"25bf5c01-cce5-40a8-b6e6-2480d1f09dbd","series":"contracted","valueGw":0.168,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/06/meta-partners-with-reliance-on-ai-enabled-data-center-in-india/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"168 MW built-to-suit block leased by Meta with options to scale; delivered within two years. Announced, not yet energized.","createdAt":"2026-08-19T01:33:24.087Z"}],"location":{"name":"Jamnagar","slug":"jamnagar-gujarat"},"capacity_picture":{"announced_gw":0.168,"energized_gw":null,"announced_minus_energized_gw":0.168}},{"id":"6e1e64cb-aa2a-424b-8dfe-59d1535ae1e9","slug":"meta-talavera-de-la-reina","name":"Meta Talavera de la Reina Data Center Campus (Torrehierro)","aliases":[],"locationId":"a84eb625-f5e9-4973-bb27-3a4b7ebf3bfe","lat":null,"lng":null,"landStatus":null,"lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Meta's hyperscale campus in the Torrehierro industrial park near Talavera de la Reina spans roughly 125-191 hectares with about 300,000 sqm of buildable area across six buildings, with a planned installed power draw around 248 MW. It is served by a new 220 kV substation at Calera y Chozas (Red Electrica/Redeia) and marketed as running on renewable energy, with full operation targeted by 2030.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://inspain.news/opening-water-guzzling-datacenter-in-empty-and-dry-spain/","title":"Opening water-guzzling datacenter in empty and dry Spain"},{"url":"https://cross-border-magazine.com/meta-data-center-talavera/","title":"Meta Data Center in Talavera de la Reina will be a 1,000 million dollars investment"},{"url":"https://cloudnews.tech/meta-drives-europes-digital-future-from-talavera-heres-what-its-data-center-in-torrehierro-will-look-like/","title":"Meta Drives Europe's Digital Future from Talavera: What Its Torrehierro Data Center Will Look Like"}],"reviewNote":null,"createdAt":"2026-08-19T00:49:46.142Z","updatedAt":"2026-08-19T00:49:46.524Z","capacityClaims":[{"id":"d19a0b8d-dc21-42ad-9732-2106aa4b60f9","dataCenterId":"6e1e64cb-aa2a-424b-8dfe-59d1535ae1e9","series":"announced","valueGw":0.248,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://inspain.news/opening-water-guzzling-datacenter-in-empty-and-dry-spain/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Planned/predicted installed power of ~248 MW","createdAt":"2026-08-19T00:49:47.205Z"}],"location":{"name":"Talavera de la Reina","slug":"talavera-de-la-reina-toledo-castilla-la-mancha"},"capacity_picture":{"announced_gw":0.248,"energized_gw":null,"announced_minus_energized_gw":0.248}},{"id":"dee2544a-dedc-4d29-9109-1e969a496373","slug":"nebius-mantsala","name":"Nebius Mäntsälä Data Center","aliases":[],"locationId":"b5f05b0b-6878-45de-9b98-610721565fa7","lat":null,"lng":null,"landStatus":null,"lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":"Free cooling; heat-recovery system recovers ~20,000 MWh/yr, heating equivalent of ~2,500 Finnish homes","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nebius's operational Mäntsälä facility is being tripled from about 25 MW to 75 MW to host up to 60,000 GPUs (NVIDIA H100/H200 and Blackwell). It runs at a PUE as low as 1.1 with a heat-recovery system feeding local district heating.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","title":"Nebius to triple capacity at Finland data center to 75 MW"},{"url":"https://www.datacenter-forum.com/datacenter-forum/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","title":"Nebius to triple capacity at Finland data center to 75 MW"}],"reviewNote":null,"createdAt":"2026-08-19T00:49:38.116Z","updatedAt":"2026-08-19T01:32:36.418Z","capacityClaims":[{"id":"cdb4b8b9-90fb-4bdf-8cdb-ddef4be89d56","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","series":"energized","valueGw":0.025,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Existing operational capacity prior to expansion (~25 MW implied)","createdAt":"2026-08-19T00:49:39.239Z"},{"id":"6d565f5b-2dba-4089-98c0-926a09f89e22","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","series":"announced","valueGw":0.075,"asOf":"2024-10-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Tripling target to 75 MW","createdAt":"2026-08-19T00:49:40.088Z"}],"location":{"name":"Mäntsälä","slug":"mantsala-uusimaa"},"capacity_picture":{"announced_gw":0.075,"energized_gw":0.025,"announced_minus_energized_gw":0.049999999999999996}},{"id":"24031bfb-3918-454e-8ffd-c879ac2e2d63","slug":"nebius-lappeenranta-ai-factory","name":"Nebius Lappeenranta AI Factory","aliases":[],"locationId":"2958b984-6c4e-44a4-bee0-05a29579e1e2","lat":null,"lng":null,"landStatus":null,"lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nebius announced a new 310 MW AI factory in Lappeenranta, Finland, positioned to be one of Europe's largest dedicated AI facilities, serving NVIDIA Blackwell and Vera Rubin platforms. It will use closed-loop liquid cooling with heat recovery into the local district heating network, drawing on Finland's low-carbon grid.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland","title":"Nebius to construct 310 MW AI factory in Finland"},{"url":"https://capacityglobal.com/news/nebius-ai-factory-finland-data-centre-europe/","title":"Nebius invests $10bn in 310MW AI Factory in Finland"}],"reviewNote":null,"createdAt":"2026-08-19T00:49:30.136Z","updatedAt":"2026-08-19T00:49:30.535Z","capacityClaims":[{"id":"7913b81a-a10c-4164-9349-83f5f60baaeb","dataCenterId":"24031bfb-3918-454e-8ffd-c879ac2e2d63","series":"announced","valueGw":0.31,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://capacityglobal.com/news/nebius-ai-factory-finland-data-centre-europe/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Up to 310 MW; first capacity to customers in 2027","createdAt":"2026-08-19T00:49:31.230Z"}],"location":{"name":"Lappeenranta","slug":"lappeenranta-south-karelia"},"capacity_picture":{"announced_gw":0.31,"energized_gw":null,"announced_minus_energized_gw":0.31}},{"id":"d3cda073-801d-42aa-a78d-1c88b0795b13","slug":"nscale-loughton-essex","name":"Nscale Loughton AI Data Centre (Langston Road, Essex)","aliases":[],"locationId":"bf6bb27a-64f9-41d3-8019-2320ba650321","lat":null,"lng":null,"landStatus":null,"lifecycleState":"permitted","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nscale AI/HPC facility on Langston Road, Loughton, sized for up to 45,000 NVIDIA GB200 GPUs with Microsoft reported as anchor tenant. A 90 MW grid connection has been delayed past the planned 2026/2027 opening, prompting Nscale to explore Bloom Energy solid oxide fuel cells as a bridging power source.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.nscale.com/press-releases/ai-hyperscaler-nscale-to-invest-gbp-2-billion-in-the-uk-data-centre-industry","title":"AI hyperscaler Nscale to invest GBP 2 billion in the UK data centre industry"},{"url":"https://datacentrereview.com/2026/07/nscales-2bn-essex-data-centre-hit-by-grid-delays/","title":"Nscale's GBP 2bn Essex data centre hit by grid delays"}],"reviewNote":null,"createdAt":"2026-08-19T00:49:19.751Z","updatedAt":"2026-08-19T00:49:20.140Z","capacityClaims":[{"id":"0060ba25-ae5c-4bc6-9a27-798335716952","dataCenterId":"d3cda073-801d-42aa-a78d-1c88b0795b13","series":"announced","valueGw":0.05,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.nscale.com/press-releases/ai-hyperscaler-nscale-to-invest-gbp-2-billion-in-the-uk-data-centre-industry","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Initial 50 MW AI/HPC capacity at the Loughton site","createdAt":"2026-08-19T00:49:20.841Z"},{"id":"d818c177-5c57-4673-ac62-3165b851e8c4","dataCenterId":"d3cda073-801d-42aa-a78d-1c88b0795b13","series":"announced","valueGw":0.09,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://datacentrereview.com/2026/07/nscales-2bn-essex-data-centre-hit-by-grid-delays/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Scalable to 90 MW; grid connection delayed past planned opening","createdAt":"2026-08-19T00:49:21.738Z"}],"location":{"name":"Loughton","slug":"loughton-essex"},"capacity_picture":{"announced_gw":0.09,"energized_gw":null,"announced_minus_energized_gw":0.09}},{"id":"78b5d484-08c3-41ac-8149-852878b4d6da","slug":"moro-hub-green-data-center-dubai","name":"Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park)","aliases":[],"locationId":"1cb8a4bf-f95b-458a-9434-a7474fc64f49","lat":null,"lng":null,"landStatus":null,"lifecycleState":"energized","powerSourceMix":"solar_storage","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Moro Hub, a subsidiary of Digital DEWA (Dubai Electricity and Water Authority), operates a 100MW+ data center at the Mohammed bin Rashid Al Maktoum Solar Park, inaugurated February 2023 and recognized by Guinness World Records as the world's largest solar-powered data center. Powered 100% by solar and Uptime Tier III certified.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://w.media/moro-hub-launches-worlds-largest-solar-powered-data-center-in-uae/","title":"Moro Hub launches world's largest solar-powered data center in UAE (w.media)"},{"url":"https://baxtel.com/data-center/moro-hub-dewa-solar-park","title":"Moro Hub DEWA Solar Park Data Center (Baxtel)"}],"reviewNote":null,"createdAt":"2026-08-19T00:49:11.820Z","updatedAt":"2026-08-19T00:49:12.215Z","capacityClaims":[{"id":"2985c04d-6610-4270-b450-5aedd152827f","dataCenterId":"78b5d484-08c3-41ac-8149-852878b4d6da","series":"energized","valueGw":0.1,"asOf":"2023-02-01T00:00:00.000Z","sourceUrl":"https://w.media/moro-hub-launches-worlds-largest-solar-powered-data-center-in-uae/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Exceeds 100MW; 16,030 sqm; operational since Feb 2023","createdAt":"2026-08-19T00:49:12.937Z"}],"location":{"name":"Dubai","slug":"dubai-dubai"},"capacity_picture":{"announced_gw":null,"energized_gw":0.1,"announced_minus_energized_gw":null}},{"id":"aca9b61a-c103-4846-824b-97b2eebbb858","slug":"khazna-qaj1-ajman-ai-data-center","name":"Khazna QAJ1 Ajman AI-Optimized Data Center","aliases":[],"locationId":"650807a2-5d50-478b-9cba-22f7837e3b74","lat":null,"lng":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Khazna Data Centers (a G42 company) is building the UAE's first AI-optimized, liquid-cooled data center in Ajman: 100MW across 20 data halls of 5MW each on ~100,000 sqm, announced October 2024 with Microsoft as anchor tenant. It received Uptime Tier III design certification in February 2026; phase 1 completion is expected December 2026.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.g42.ai/resources/news/khazna-announces-uaes-first-ai-optimized-data-center-and-largest-its-portfolio","title":"Khazna Announces the UAE's First AI-Optimized Data Center (G42)"},{"url":"https://www.blackridgeresearch.com/project-profiles/ajman-data-center-project-khazna-location-cost-contractors-current-status-latest-updates","title":"Khazna QAJ1 Ajman Data Center: Latest Updates (BlackRidge Research)"}],"reviewNote":null,"createdAt":"2026-08-19T00:49:02.009Z","updatedAt":"2026-08-19T00:49:02.398Z","capacityClaims":[{"id":"7bd99528-db3d-4b06-be6e-6d246fd18528","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","series":"announced","valueGw":0.1,"asOf":"2024-10-01T00:00:00.000Z","sourceUrl":"https://www.g42.ai/resources/news/khazna-announces-uaes-first-ai-optimized-data-center-and-largest-its-portfolio","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"100MW across 20 data halls of 5MW each","createdAt":"2026-08-19T00:49:03.080Z"},{"id":"ea247de7-c395-448c-9394-f181fd6b5471","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","series":"under_construction","valueGw":0.1,"asOf":"2024-10-01T00:00:00.000Z","sourceUrl":"https://www.g42.ai/resources/news/khazna-announces-uaes-first-ai-optimized-data-center-and-largest-its-portfolio","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"100 MW IT capacity across 20 data halls (5 MW each) on ~100,000 sqm; UAE's first AI-optimized liquid-cooled data center; Microsoft anchor tenant. Uptime Tier III design certification awarded Feb 2026; phase due Dec 2026.","createdAt":"2026-08-19T01:33:17.223Z"}],"location":{"name":"Ajman","slug":"ajman-ajman"},"capacity_picture":{"announced_gw":0.1,"energized_gw":null,"announced_minus_energized_gw":0.1}},{"id":"a5d17766-54b5-4ad0-a87c-7c852eff4f7b","slug":"datavolt-neom-oxagon-ai-factory","name":"DataVolt NEOM Oxagon Net-Zero AI Factory","aliases":[],"locationId":"e5854639-d644-44e0-b302-dde4f9a0b099","lat":null,"lng":null,"landStatus":null,"lifecycleState":"announced","powerSourceMix":"solar_storage","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"DataVolt and NEOM signed a February 2025 agreement to build a 1.5GW AI data-center campus ('AI factory') at Oxagon on the Red Sea, powered entirely by renewable energy and designed for net-zero operation. An initial USD 5 billion funds the first phase, targeted operational by 2028.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.neom.com/en-us/newsroom/datavolt-signs-agreement-with-neom","title":"DataVolt and NEOM to develop region's first net-zero AI factory (NEOM newsroom)"},{"url":"https://www.middleeastainews.com/p/neom-datavolt-usd-5-billion-data-centre","title":"NEOM & DataVolt to build $5 billion net-zero AI factory campus"},{"url":"https://datacentremagazine.com/data-centres/neom-and-datavolt-to-build-us-5bn-net-zero-ai-factory","title":"NEOM and DataVolt to Build US$5bn Net Zero AI Factory (Data Centre Magazine)"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:53.564Z","updatedAt":"2026-08-19T00:48:53.947Z","capacityClaims":[{"id":"1c689243-5824-4c3b-b3ab-79f21213fbc5","dataCenterId":"a5d17766-54b5-4ad0-a87c-7c852eff4f7b","series":"announced","valueGw":1.5,"asOf":"2025-02-01T00:00:00.000Z","sourceUrl":"https://www.neom.com/en-us/newsroom/datavolt-signs-agreement-with-neom","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"1.5GW ultimate campus capacity; first phase funded by an initial $5B","createdAt":"2026-08-19T00:48:54.646Z"},{"id":"d45eaf95-0418-43df-bda6-a105a3be54c3","dataCenterId":"a5d17766-54b5-4ad0-a87c-7c852eff4f7b","series":"announced","valueGw":0.3,"asOf":"2028-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/datavolt-plans-15gw-data-center-campus-in-neoms-oxagon/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"First 300 MW phase targeted for completion by 2028.","createdAt":"2026-08-19T01:33:19.657Z"}],"location":{"name":"Oxagon","slug":"oxagon-tabuk-neom"},"capacity_picture":{"announced_gw":0.3,"energized_gw":null,"announced_minus_energized_gw":0.3}},{"id":"ab0100f2-d003-4189-9985-4f10784191fc","slug":"lambda-kansas-city-missouri","name":"Lambda Kansas City AI Factory","aliases":[],"locationId":"5f98e2a5-8749-4652-bf37-6cc897ad9306","lat":null,"lng":null,"landStatus":"former_industrial","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"SPP","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Lambda is converting an existing 2009-built facility in Kansas City, Missouri into an AI Factory, launching in early 2026 at 24 MW with potential to scale beyond 100 MW. The initial deployment is described as more than 10,000 Nvidia Blackwell Ultra GPUs.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","title":"Lambda: 100 MW AI Factory in Kansas City"},{"url":"https://www.datacenterdynamics.com/en/news/ai-cloud-firm-lambda-targets-data-center-deployment-in-kansas-city-missouri/","title":"DCD: Lambda targets Kansas City data center"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:46.007Z","updatedAt":"2026-08-19T00:48:46.402Z","capacityClaims":[{"id":"e1d9bd78-e68d-4a0d-bc25-bba77a7fe414","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","series":"announced","valueGw":0.024,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Launches early 2026 at 24 MW","createdAt":"2026-08-19T00:48:47.251Z"},{"id":"27571046-15b8-4c2f-84ce-3580628bcf8d","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","series":"announced","valueGw":0.1,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Potential to scale beyond 100 MW","createdAt":"2026-08-19T00:48:48.136Z"},{"id":"5a5d56cb-c9dc-48e6-bde8-8004bc344b91","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","series":"under_construction","valueGw":0.024,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"Launch at 24 MW in a repurposed 2009-built facility; Lambda sole tenant/operator; >10,000 NVIDIA Blackwell Ultra GPUs, dedicated to a single customer under multi-year agreement.","createdAt":"2026-08-19T01:33:13.220Z"}],"location":{"name":"Kansas City","slug":"kansas-city-missouri"},"capacity_picture":{"announced_gw":0.024,"energized_gw":null,"announced_minus_energized_gw":0.024}},{"id":"8816a42d-177f-434d-9475-db84f39e535c","slug":"nscale-barstow-texas","name":"Nscale Barstow AI Data Center (Microsoft)","aliases":[],"locationId":"48f7f695-2b0f-4053-bc9f-0f147c1a158f","lat":null,"lng":null,"landStatus":null,"lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nscale, an Nvidia-backed AI infrastructure firm, is leasing a West Texas data center from Bitcoin miner Ionic Digital in Barstow to deliver 240 MW of Nvidia AI capacity to Microsoft, with phased delivery starting Q3 2026 and plans to scale to about 1.2 GW. Microsoft holds an option on a further 700 MW phase from late 2027, within a Nscale-Microsoft compute deal valued up to about $14 billion.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://tech.eu/2026/03/17/nscale-snaps-up-major-us-data-centre-site-inks-ai-compute-deal-with-microsoft/","title":"Tech.eu: Nscale US site and Microsoft compute deal"},{"url":"https://www.datacenterdynamics.com/en/news/nscale-to-supply-microsoft-with-additional-100000-nvidia-gpus-in-us-and-europe/","title":"DCD: Nscale to supply Microsoft with Nvidia GPUs"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:37.676Z","updatedAt":"2026-08-19T00:48:38.052Z","capacityClaims":[{"id":"783c207f-6260-439e-806d-cebca82be7fc","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","series":"contracted","valueGw":0.24,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://tech.eu/2026/03/17/nscale-snaps-up-major-us-data-centre-site-inks-ai-compute-deal-with-microsoft/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"240 MW phased delivery to Microsoft starting Q3 2026","createdAt":"2026-08-19T00:48:38.739Z"},{"id":"d397bedc-36d7-445d-8c0f-d823a8bf3c85","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","series":"announced","valueGw":1.2,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://tech.eu/2026/03/17/nscale-snaps-up-major-us-data-centre-site-inks-ai-compute-deal-with-microsoft/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Plan to scale site footprint to ~1.2 GW; Microsoft option on +700 MW from late 2027","createdAt":"2026-08-19T00:48:39.648Z"},{"id":"2f7a8edd-e64f-4048-aa70-33f605358511","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","series":"announced","valueGw":0.7,"asOf":"2025-10-01T00:00:00.000Z","sourceUrl":"https://www.nscale.com/press-releases/nscale-microsoft-2025","sourceType":"company_filing","evidenceTier":"reported","supersedesId":null,"note":"Microsoft option on a second phase of 700 MW starting late 2027; Nscale targets scaling footprint to 1.2 GW over time.","createdAt":"2026-08-19T01:33:09.733Z"}],"location":{"name":"Barstow","slug":"barstow-texas"},"capacity_picture":{"announced_gw":0.7,"energized_gw":null,"announced_minus_energized_gw":0.7}},{"id":"2b763953-2d67-48e5-a533-3ffdc5148bc8","slug":"microsoft-laporte-indiana","name":"Microsoft La Porte Data Center Campus","aliases":[],"locationId":"6bcc21e9-798d-4fb2-89e8-18f124e257c1","lat":null,"lng":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":null,"servingUtility":null,"acreage":489,"totalBuildingSqft":null,"streetAddress":null,"notes":"Microsoft is building a data center campus in La Porte, Indiana (Radius Industrial Park) to support cloud and AI, initially announced as a roughly $1 billion, 245,000 sq ft facility on 489 acres. La Porte later approved an annexation of about 1,000 acres to expand the campus, with construction phased through 2032.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-expands-plans-for-la-porte-indiana-data-center-campus/","title":"DCD: Microsoft expands La Porte, Indiana campus"},{"url":"https://cityoflaporte.com/news/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana","title":"City of La Porte: $1B Microsoft data center announced"},{"url":"https://iedc.in.gov/events/news/details/2024/06/04/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana","title":"Indiana IEDC: Microsoft $1B La Porte announcement"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:31.897Z","updatedAt":"2026-08-19T01:34:53.411Z","capacityClaims":[{"id":"92370021-70b3-4ff9-b2c4-e97d80540389","dataCenterId":"2b763953-2d67-48e5-a533-3ffdc5148bc8","series":"announced","valueGw":0.538,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://cleanview.co/data-centers/indiana/755/la-porte-data-center","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Tracker-estimated 538 MW. Official announcement stated $1B / 245,000 sq ft on 489 acres with no official MW figure; NIPSCO is the serving utility. Later filings expanded plans to a multi-building campus.","createdAt":"2026-08-19T01:33:05.316Z"}],"location":{"name":"La Porte","slug":"la-porte-indiana"},"capacity_picture":{"announced_gw":0.538,"energized_gw":null,"announced_minus_energized_gw":0.538}},{"id":"52a9517b-db07-4eae-af7a-3d06f3595c14","slug":"cipher-stingray-andrews-texas","name":"Cipher Stingray Data Center (AWS)","aliases":[],"locationId":"280757e8-e1ac-4800-ac44-62dc402767da","lat":null,"lng":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Cipher Mining's Stingray site on about 250 acres in Andrews County, West Texas is a roughly 100 MW gross AI data center fully leased to Amazon Web Services under a 15-year agreement. The project is financed with roughly $810 million of senior secured notes and targeted to energize around Q2 2026.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/cipher-mining-acquires-more-than-500-acres-across-two-sites-in-texas-for-crypto-and-hpc-use/","title":"DCD: Cipher acquires Texas sites for HPC use"},{"url":"https://blockspace.media/insight/cipher-digital-aws-stingray-data-center/","title":"Blockspace: AWS is tenant at Cipher Stingray"},{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998925000003/cifr-20250225xex991.htm","title":"Cipher Mining Form 8-K (FY2025)"},{"url":"https://www.datacentermap.com/usa/texas/andrews/cipher-stingray/","title":"Data Center Map: Cipher Stingray, Andrews TX"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:25.232Z","updatedAt":"2026-08-19T00:48:25.622Z","capacityClaims":[{"id":"df4ddce9-77c2-4315-99f0-3cfda650a7ce","dataCenterId":"52a9517b-db07-4eae-af7a-3d06f3595c14","series":"contracted","valueGw":0.1,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://blockspace.media/insight/cipher-digital-aws-stingray-data-center/","sourceType":"company_filing","evidenceTier":"reported","supersedesId":null,"note":"~100 MW gross fully pre-leased to AWS for 15 years; not yet energized","createdAt":"2026-08-19T00:48:26.310Z"},{"id":"6c2f77e4-854b-4e13-a36c-791242657d6a","dataCenterId":"52a9517b-db07-4eae-af7a-3d06f3595c14","series":"under_construction","valueGw":0.07,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.theglobeandmail.com/investing/markets/stocks/CIFR/pressreleases/2375175/cipher-mining-announces-major-stingray-data-center-financing/","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"70 MW HPC data center per Cipher press release; described as ~100 MW gross by trackers. Fully pre-leased to Amazon Data Services (AWS), triple-net, 15-year term, due live 2026.","createdAt":"2026-08-19T01:33:00.436Z"}],"location":{"name":"Andrews","slug":"andrews-texas"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","slug":"google-pryor-midamerica-oklahoma","name":"Google Pryor (MidAmerica) Data Center Campus","aliases":[],"locationId":"c2453a71-9f7b-4f8f-b7c0-9c59a0731711","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"SPP","waterSourceNotes":null,"servingUtility":null,"acreage":800,"totalBuildingSqft":null,"streetAddress":null,"notes":"Google's Pryor campus in the MidAmerica Industrial Park has operated since 2011 and has drawn about $4.4 billion in cumulative investment, ranking as one of Google's largest data centers. In August 2025 Google announced an additional $9 billion, two-year Oklahoma investment in cloud and AI infrastructure covering a Pryor expansion plus a new campus in Stillwater.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-cloud-and-ai-infrastructure-in-oklahoma/","title":"DCD: Google to invest $9bn in Oklahoma cloud and AI"},{"url":"https://www.kosu.org/local-news/2025-08-14/google-announces-a-new-9-billion-cloud-and-ai-investment-in-oklahoma","title":"KOSU: Google $9B Oklahoma investment"},{"url":"https://www.okcommerce.gov/google-planning-another-expansion-for-pryor-data-center/","title":"Oklahoma Commerce: Google Pryor expansion"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:20.185Z","updatedAt":"2026-08-19T01:34:52.632Z","capacityClaims":[{"id":"aeeb5f8b-c67c-4503-bea8-91d1a952b594","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","series":"energized","valueGw":0.088,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://cleanview.co/data-centers/oklahoma","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Google Pryor Building 2 per Cleanview tracker; campus operating since 2011","createdAt":"2026-08-19T01:32:18.602Z"}],"location":{"name":"Pryor","slug":"pryor-oklahoma"},"capacity_picture":{"announced_gw":null,"energized_gw":0.088,"announced_minus_energized_gw":null}},{"id":"6db978fa-8c95-4c64-96a1-0a4271e38943","slug":"coreweave-core-scientific-muskogee-oklahoma","name":"Core Scientific / CoreWeave Muskogee HPC Campus","aliases":[],"locationId":"8a69ab06-60f0-4b10-9ad9-74b6543df3ba","lat":null,"lng":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"SPP","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Core Scientific, CoreWeave and Port Muskogee broke ground in November 2024 on an initial 100 MW HPC data center for Nvidia GPU hosting under a CoreWeave lease. In 2025 Core Scientific outlined scaling the Muskogee campus to roughly 1.5 GW gross (about 1.0 GW leasable). CoreWeave's total contracted HPC hosting with Core Scientific across six sites is about 590 MW with a stated contract value near $8.7 billion.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/coreweave-and-core-scientific-break-ground-on-100mw-data-center-in-muskogee-oklahoma/","title":"DCD: CoreWeave and Core Scientific break ground in Muskogee"},{"url":"https://www.okcommerce.gov/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/","title":"Oklahoma Commerce: Muskogee 100 MW HPC groundbreaking"},{"url":"https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/","title":"Blockspace: Core Scientific Oklahoma expansion"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:11.445Z","updatedAt":"2026-08-19T00:48:11.827Z","capacityClaims":[{"id":"17a28dbf-e745-4f26-a973-d5b3a18b290d","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","series":"under_construction","valueGw":0.1,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.okcommerce.gov/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Initial 100 MW HPC data center at groundbreaking","createdAt":"2026-08-19T00:48:12.562Z"},{"id":"6fde0130-41e7-4fe5-9702-bfd6bab16425","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","series":"announced","valueGw":1.5,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Plan to scale campus to ~1.5 GW gross (~1.0 GW leasable)","createdAt":"2026-08-19T00:48:13.411Z"},{"id":"af39be87-048d-4d48-8d97-53f77dfd20a3","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","series":"under_construction","valueGw":0.07,"asOf":"2024-11-18T00:00:00.000Z","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"~70 MW critical IT load for NVIDIA GPUs; 100 MW total (30 MW ancillary). Groundbreaking Nov 2024, operational 2026.","createdAt":"2026-08-19T01:32:55.622Z"}],"location":{"name":"Muskogee","slug":"muskogee-oklahoma"},"capacity_picture":{"announced_gw":1.5,"energized_gw":null,"announced_minus_energized_gw":1.5}},{"id":"1a2c8132-9ca7-447f-9f69-95bee2d39a4a","slug":"google-dorchester-berkeley-south-carolina","name":"Google Dorchester & Berkeley County Data Center Campuses","aliases":[],"locationId":"70258921-26a1-4a23-bfbb-aa524eb7dd65","lat":null,"lng":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":231,"totalBuildingSqft":null,"streetAddress":null,"notes":"Google is expanding its South Carolina footprint with cloud and AI data center campuses in Dorchester County (a 230-acre site in Ridgeville and a site in the Winding Woods Commerce Park in St. George) plus Berkeley County. An initial $3.3 billion commitment (September 2024) was followed by an additional two-year $9 billion investment announced in October 2025 for 2026 to 2027. Campuses broke ground in September 2024.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-south-carolina-data-centers/","title":"DCD: Google to invest $9bn in South Carolina"},{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","title":"SC Governor: Google grows SC footprint (Dorchester)"},{"url":"https://www.dorchestercountysc.gov/business/data-center-fact-sheet","title":"Dorchester County SC data center fact sheet"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:05.916Z","updatedAt":"2026-08-19T01:34:51.854Z","capacityClaims":[{"id":"6c05ff7c-7f2f-417b-8312-336c8a88c17d","dataCenterId":"1a2c8132-9ca7-447f-9f69-95bee2d39a4a","series":"under_construction","valueGw":0.08,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://morethanjustparks.com/data-center-tracker/google-ridgeville-data-center-pine-hill-business-campus-sc--913d8d17-2772-4d3a-8cb0-90d190f2c6b2","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Ridgeville (Pine Hill Business Campus) 80MW per tracker","createdAt":"2026-08-19T01:32:26.249Z"}],"location":{"name":"Ridgeville","slug":"ridgeville-south-carolina"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"60054c7b-1a7e-492e-9871-dfbafcf75161","slug":"meta-los-lunas-new-mexico","name":"Meta Los Lunas Data Center Campus","aliases":[],"locationId":"567f7738-c39c-474b-a9a8-8a26a7a1aac7","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"New AI-dedicated buildings designed to use substantially less water than earlier buildings","servingUtility":null,"acreage":750,"totalBuildingSqft":null,"streetAddress":null,"notes":"Meta's roughly 750-acre Los Lunas campus houses eight completed data center buildings (about 3.8 million sq ft). A 2025 expansion of two additional buildings, an approximately $800 million investment, is described as the first in Meta's portfolio dedicated to AI and machine learning hardware. Meta has procured more than 885 MW of renewable energy in New Mexico to offset the campus.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/meta-planning-expansion-of-los-lunas-data-center-campus-in-new-mexico/","title":"DCD: Meta plans Los Lunas expansion"},{"url":"https://www.news-bulletin.com/news/los-lunas-meta-data-center-introduces-expansion-dedicated-to-artificial-intelligence/331733","title":"News-Bulletin: Los Lunas Meta AI expansion"}],"reviewNote":null,"createdAt":"2026-08-19T00:47:59.788Z","updatedAt":"2026-08-19T01:34:51.078Z","capacityClaims":[{"id":"b13fd129-7f09-4c0b-b9c5-061720c14e4e","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","series":"energized","valueGw":0.04,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://servercountry.org/data/projects/meta-los-lunas-data-center-campus-nm/","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Per-building load ~40MW per tracker; eight buildings operating (per-building figure only, campus total not disclosed by Meta)","createdAt":"2026-08-19T01:32:48.109Z"}],"location":{"name":"Los Lunas","slug":"los-lunas-new-mexico"},"capacity_picture":{"announced_gw":null,"energized_gw":0.04,"announced_minus_energized_gw":null}},{"id":"9876c0be-f7b0-4093-a440-5969b60ca565","slug":"aws-madison-county-mississippi","name":"AWS Madison County Data Center Campuses","aliases":[],"locationId":"f951950a-dd1f-4476-8ae5-0b127b03c91e","lat":null,"lng":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":"Transitioning to recycled/treated wastewater cooling by 2027; $215M state loan funded wastewater treatment upgrades","servingUtility":null,"acreage":1700,"totalBuildingSqft":null,"streetAddress":null,"notes":"AWS committed in January 2024 to at least $10 billion (later scaled up in company statements toward $25 billion) to build hyperscale data center campuses in Madison County, Mississippi, across the Madison County Mega Site near Canton and a second Ridgeland site. Plans describe roughly 16 buildings and at least 1,000 jobs, with completion targeted around 2027.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://mississippi.org/news/amazon-web-services-to-invest-record-shattering-10-billion/","title":"Mississippi Development Authority: AWS $10B investment"},{"url":"https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/","title":"DCD: AWS confirmed behind $10bn Mississippi development"},{"url":"https://www.datacenterdynamics.com/en/news/aws-scales-up-investment-commitment-for-mississippi-data-centers-to-25bn/","title":"DCD: AWS scales Mississippi commitment to $25bn"}],"reviewNote":null,"createdAt":"2026-08-19T00:47:54.355Z","updatedAt":"2026-08-19T01:34:50.296Z","capacityClaims":[{"id":"8c0eaa1a-465c-4b9b-adaa-f4a9d14df698","dataCenterId":"9876c0be-f7b0-4093-a440-5969b60ca565","series":"under_construction","valueGw":0.25,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.interconnection.fyi/data-center/project/amazon-madison-mega-site-4fb34373","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"250+ MW per interconnection tracker; Entergy Mississippi built a 300MW substation to serve the Madison County campuses","createdAt":"2026-08-19T01:32:39.778Z"}],"location":{"name":"Canton","slug":"canton-mississippi"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"1135eddf-79b2-4cde-aa07-753c2624341f","slug":"xai-colossus-2-southaven-mississippi","name":"xAI Colossus 2 Data Center","aliases":[],"locationId":"f4cdf31d-c4d5-44eb-8a8e-f49031f29564","lat":null,"lng":null,"landStatus":null,"lifecycleState":"partially_energized","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"xAI's second Colossus supercomputer campus in Southaven, Mississippi, part of an expansion of the Memphis-area Colossus complex toward roughly 2 GW. As of 2026 it was powered largely by on-site natural gas turbines, with 46 turbines (about 495 MW) reported operating without air permits and 41 additional turbines permitted in March 2026.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/xai-deploys-19-natural-gas-turbines-at-colossus-2-data-center-in-southaven-mississippi-report/","title":"DCD: xAI deploys gas turbines at Colossus 2, Southaven"},{"url":"https://en.wikipedia.org/wiki/Colossus_(data_center)","title":"Wikipedia: Colossus (data center)"},{"url":"https://www.gem.wiki/Colossus_2_power_station","title":"Global Energy Monitor: Colossus 2 power station"},{"url":"https://www.selc.org/news/xai-built-an-illegal-power-plant-to-power-its-data-center/","title":"SELC: xAI gas turbines and air permits"}],"reviewNote":null,"createdAt":"2026-08-19T00:47:40.420Z","updatedAt":"2026-08-19T00:47:40.812Z","capacityClaims":[{"id":"eaa01ac6-1ce8-41dd-854e-cde01ec120c3","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","series":"announced","valueGw":1.2,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://en.wikipedia.org/wiki/Colossus_(data_center)","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Colossus 2 targeted at roughly 1.2 GW; combined Memphis-area complex targeted near 2 GW","createdAt":"2026-08-19T00:47:41.557Z"}],"location":{"name":"Southaven","slug":"southaven-mississippi"},"capacity_picture":{"announced_gw":1.2,"energized_gw":null,"announced_minus_energized_gw":1.2}},{"id":"7cb8993b-ed76-464a-8094-82a4395840e3","slug":"aws-susquehanna-cumulus-salem-township-pennsylvania","name":"AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus","aliases":[],"locationId":"347a2810-b769-48e0-a36f-6763e049aef7","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"nuclear_ppa","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"AWS acquired the ~1,200-acre former Cumulus data center campus co-located with Talen Energy's 2.5 GW Susquehanna nuclear station for $650M and plans to develop up to 960 MW of data center load. In 2025 Talen and AWS signed a 17-year agreement for up to 1.92 GW of nuclear power ramping to full capacity by roughly 2032.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterfrontier.com/hyperscale/article/33038288/aws-eyes-960-mw-for-newly-acquired-nuclear-power-data-center-in-pennsylvania","title":"Data Center Frontier: AWS eyes 960 MW at PA nuclear campus"},{"url":"https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-centert/750440/","title":"Utility Dive: Talen to sell Amazon 1.92 GW from Susquehanna"},{"url":"https://www.datacenterdynamics.com/en/news/aws-acquires-talens-nuclear-data-center-campus-in-pennsylvania/","title":"DCD: AWS acquires Talen's nuclear data center campus"},{"url":"https://www.sec.gov/Archives/edgar/data/1622536/000162253626000017/tln-20251231.htm","title":"Talen Energy Form 10-K (FY2025)"}],"reviewNote":null,"createdAt":"2026-08-19T00:47:31.978Z","updatedAt":"2026-08-19T00:47:32.373Z","capacityClaims":[{"id":"d966dcd2-71de-442c-a37c-49e0657c5175","dataCenterId":"7cb8993b-ed76-464a-8094-82a4395840e3","series":"announced","valueGw":0.96,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterfrontier.com/hyperscale/article/33038288/aws-eyes-960-mw-for-newly-acquired-nuclear-power-data-center-in-pennsylvania","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"AWS to develop up to 960 MW of data center load in phased 120 MW increments","createdAt":"2026-08-19T00:47:33.097Z"}],"location":{"name":"Salem Township","slug":"salem-township-pennsylvania"},"capacity_picture":{"announced_gw":0.96,"energized_gw":null,"announced_minus_energized_gw":0.96}},{"id":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","slug":"tract-tric-storey-county-nevada","name":"Tract Master-Planned Data Center Park (TRIC)","aliases":["Tract Storey County","Peru Shelf / South Valley"],"locationId":"d33b7fc1-4135-44b1-b1e9-186cf5efd9e9","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"Tract controls over 1,100 acre-feet of water rights at TRIC","servingUtility":null,"acreage":2200,"totalBuildingSqft":null,"streetAddress":null,"notes":"Tract has assembled 2,200+ acres (part of a broader ~8,590-acre position) at the Tahoe-Reno Industrial Center in Storey County, positioned as master-planned data center land for hyperscalers, with an NV Energy relationship framed around delivering 2 GW+ over time. In April 2026 Tract filed state energy-regulator and Nevada DEP air-quality applications for temporary on-site gas generation (144 MW South Valley + 218 MW Peru Ridge) to bridge 2-3 years until permanent NV Energy service. No vertical data center construction confirmed; end operators/offtakers not disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://finance.yahoo.com/news/tract-completes-acquisition-2-200-140300590.html","date":"2023-10-02","title":"Tract Completes Acquisition of 2,200 Acres in Storey County, Nevada and Partners with NV Energy to Deliver Two Gigawatts of Power Capacity","publisher":"GlobeNewswire / Tract"},{"url":"https://thenevadaindependent.com/article/why-a-northern-nevada-data-center-wants-to-build-its-own-temporary-natural-gas-power-plant","date":"2026-05-03","title":"Why a Northern Nevada data center wants to build its own temporary natural gas power plant","publisher":"The Nevada Independent"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:38.750Z","updatedAt":"2026-08-19T00:29:47.724Z","capacityClaims":[{"id":"216491b1-faaa-4a28-89a2-3beca194175f","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","series":"contracted","valueGw":2,"asOf":"2023-10-02T00:00:00.000Z","sourceUrl":"https://finance.yahoo.com/news/tract-completes-acquisition-2-200-140300590.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"2 GW+ NV Energy delivery framed as multi-year; not energized.","createdAt":"2026-08-17T20:25:39.424Z"},{"id":"f1b5de01-bf82-4444-a958-d5f657e3589f","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","series":"under_construction","valueGw":0.4,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://www.kolotv.com/2026/05/20/gov-lombardo-construction-companies-break-ground-2-million-sq-ft-data-center-storey-co/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Fleet Data Centers (Tract Capital subsidiary): South Valley + Peru Ridge combined 400 MW critical compute (plus 30 MW utility compute per campus), 769-acre footprint; groundbreaking May 2026.","createdAt":"2026-08-19T00:29:48.399Z"}],"location":{"name":"Storey County","slug":"storey-county-nevada"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"25b8834d-2433-4ff8-a6dd-87c57d598562","slug":"oleary-stratos-hansel-valley-box-elder","name":"Stratos Project (O'Leary Digital) AI Data Center & Energy Campus","aliases":["Stratos","O'Leary Digital Hansel Valley"],"locationId":"7a4f1b47-88f5-4ffe-87cc-d0b4088ffe9c","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"Off-grid campus using closed-loop chilling plus dry (air-based) cooling with no continuous water draw; water only for one-time system fill and minor maintenance. Water purchased from private landowners' existing agricultural water rights, explicitly not from the Great Salt Lake (Utah Gov Office FAQ). A water-right change application was filed Mar 25, 2026 and withdrawn May 6, 2026 with intent to refile.","servingUtility":null,"acreage":40000,"totalBuildingSqft":null,"streetAddress":null,"notes":"Proposed ~40,000-acre self-powered AI campus in Hansel/Locomotive Valley (unincorporated Box Elder County) backed by Kevin O'Leary's O'Leary Digital and Utah's Military Installation Development Authority (MIDA); Box Elder commissioners approved the project area 2026-05-04. Phase 1 targets ~3 GW with a 9 GW full buildout, all from on-site natural gas fed by the Ruby Pipeline via a Tallgrass deal. Early stage: no air permit, financing close, or construction start confirmed, and water/environmental review remains contested.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/","date":"2026-05-04","title":"Hundreds cry out as Box Elder commissioners wave in massive data center","publisher":"Utah News Dispatch"},{"url":"https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/","date":"2026-05-04","title":"Hyperscale data center project in Utah: Here's what we know ahead of the Box Elder County vote","publisher":"Salt Lake Tribune"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:32.933Z","updatedAt":"2026-08-19T00:16:13.194Z","capacityClaims":[{"id":"1b013380-f525-486c-87b0-c1d2aefeafa3","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":3,"asOf":"2026-05-04T00:00:00.000Z","sourceUrl":"https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/","sourceType":"county_docket","evidenceTier":"claimed","supersedesId":null,"note":"Phase 1 commitment ~3 GW; 9 GW full Utah buildout claimed.","createdAt":"2026-08-17T20:25:33.630Z"},{"id":"817d8de2-3e71-47c6-b291-dfeab7fd5579","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":9,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.midaut.org/stratos","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Approximate full-buildout on-site generation per MIDA Stratos Project Area page. Journalism (SLTrib) cites a 7.5-9 GW full-buildout range; more than double Utah's ~4 GW average statewide demand.","createdAt":"2026-08-19T00:16:13.878Z"},{"id":"c418f8e0-d841-46f6-b796-ebf13fb3b981","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":0.5,"asOf":"2026-05-07T00:00:00.000Z","sourceUrl":"https://www.utahmoneywatch.com/the-real-money-behind-stratos-oleary-ventures-pegs-phase-1-at-more-than-4-billion-with-20-billion-of-expenditures-in-its-early-phases/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Initial Phase 1 sized at ~500 MW per O'Leary Ventures CEO Paul Palandjian, scaling toward 3 GW in early phases.","createdAt":"2026-08-19T00:16:14.716Z"},{"id":"3d11c7db-9304-4c53-8d39-7bdd04f582a1","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":1,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Interim regulatory ceiling: Gov. Spencer Cox requested the current/first phase be capped at ~1 GW pending review; not a build commitment.","createdAt":"2026-08-19T00:16:15.401Z"}],"location":{"name":"Hansel Valley","slug":"hansel-valley-utah"},"capacity_picture":{"announced_gw":9,"energized_gw":null,"announced_minus_energized_gw":9}},{"id":"8848cb50-2254-4805-99ad-f2236513df2c","slug":"crusoe-tallgrass-project-jade-cheyenne","name":"Project Jade (Crusoe / Tallgrass) AI Data Center Campus","aliases":["Project Jade","Crusoe Cheyenne","Switchgrass Industrial Park data center"],"locationId":"80d28a1d-b9ab-48ad-a239-98871e8e68f9","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"permitted","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"On-site deep groundwater wells drilled below the aquifers that supply Laramie County; closed-loop cooling to minimize consumption. Reported initial fill roughly equivalent to 20 households and ongoing annual use less than three households (Cowboy State Daily).","servingUtility":null,"acreage":600,"totalBuildingSqft":null,"streetAddress":null,"notes":"Crusoe's ~600-acre, five-building AI data center campus in the Switchgrass Industrial Park south of Cheyenne, approved by Laramie County commissioners 2026-01-05, with an initial 1.8 GW target scaling to 10 GW. Power is behind-the-meter from Tallgrass's co-located BFC Power / Cheyenne Power Hub (2.7 GW gas-fired generation) plus Bloom Energy fuel cells; Tallgrass provides CO2 capture. First buildings anticipated mid-2027; exact on-site coordinates not published.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","date":"2026-01-07","title":"Wyoming Approves Data Center Campus That Includes 2.7 GW of New Natural Gas-Fired Generation","publisher":"POWER Magazine"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-and-tallgrass-announce-ai-data-center-in-wyoming","date":"2025-07-24","title":"Crusoe and Tallgrass announce AI data center in Wyoming","publisher":"Crusoe"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:27.382Z","updatedAt":"2026-08-19T00:16:01.982Z","capacityClaims":[{"id":"f66e61f7-5ba0-471b-b4d1-5c8261ee1a3d","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","series":"announced","valueGw":1.8,"asOf":"2025-07-24T00:00:00.000Z","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-tallgrass-announce-ai-data-center-in-wyoming","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Initial phase 1.8 GW; designed to scale to 10 GW.","createdAt":"2026-08-17T20:25:28.068Z"},{"id":"afee24f8-1176-4c5d-824d-4a052094c35e","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","series":"announced","valueGw":10,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Marketed ultimate scale-up ceiling; would be the largest single AI campus in the US if realized.","createdAt":"2026-08-19T00:16:02.736Z"}],"location":{"name":"Cheyenne","slug":"cheyenne-wyoming"},"capacity_picture":{"announced_gw":10,"energized_gw":null,"announced_minus_energized_gw":10}},{"id":"9bf4a473-a657-4b97-8a64-fc31b399d260","slug":"microsoft-cheyenne-wyoming","name":"Microsoft Cheyenne Data Center Campus","aliases":["Microsoft Bison Business Park","Microsoft Cheyenne expansion"],"locationId":"80d28a1d-b9ab-48ad-a239-98871e8e68f9","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"Direct evaporative cooling uses water less than 10% of the year; Microsoft commits to replenish an estimated 566M gallons of water. Served by Black Hills Energy under Large Power Contract Service (LPCS) tariff.","servingUtility":null,"acreage":3200,"totalBuildingSqft":null,"streetAddress":null,"notes":"Microsoft has operated data centers in Cheyenne since 2012 and on 2026-04-14 announced intent to buy ~3,200 acres south of the city (200-acre Bison Business Park parcel plus adjacent 3,000 acres) to roughly triple its footprint over a multiyear buildout. Microsoft did not disclose an MW/GW figure for the expansion; power is via Black Hills Energy's Large Power Contract Service tariff.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://news.microsoft.com/source/2026/04/14/microsoft-announces-intent-to-expand-datacenter-operations-in-cheyenne-accelerating-innovation-and-economic-growth/","date":"2026-04-14","title":"Microsoft announces intent to expand datacenter operations in Cheyenne","publisher":"Microsoft"},{"url":"https://county17.com/2026/04/14/microsoft-plans-massive-3200-acre-expansion-of-cheyenne-data-centers/","date":"2026-04-14","title":"Microsoft plans massive 3,200-acre expansion of Cheyenne data centers","publisher":"County 17"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:23.913Z","updatedAt":"2026-08-19T00:14:17.698Z","capacityClaims":[],"location":{"name":"Cheyenne","slug":"cheyenne-wyoming"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"a76e96bd-5e07-444b-ba92-4995dcb78add","slug":"meta-eagle-mountain-utah","name":"Meta Eagle Mountain Data Center Campus","aliases":["Facebook Eagle Mountain","Project Steeplechase"],"locationId":"dd558c03-98e5-4932-b6c1-e579a8a860b1","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"Meta funds water restoration equal to 200% of the facility's consumption; in-house designs stated ~80% more water-efficient than industry average.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Operational Meta campus (online since 2021) under multi-phase expansion toward a ~4.5M sq ft footprint; ~200 MW currently with a new substation adding up to 1,000 MW of delivery capacity and headroom cited up to 1.8 GW. Powered via Rocky Mountain Power's renewable Schedule 34 tariff plus the Faraday Solar PPA. Meta has not published a firm total contracted MW figure for the full buildout.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.deseret.com/utah/2022/9/30/23380151/facebook-meta-announces-expansion-eagle-mountain-data-center-tax-breaks/","date":"2022-09-30","title":"Facebook parent Meta announces mega expansion to Eagle Mountain data center project","publisher":"Deseret News"},{"url":"https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/","date":"2025-11-21","title":"Utah's largest solar plant becomes operational, set to power Eagle Mountain data center","publisher":"Daily Herald"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:17.497Z","updatedAt":"2026-08-19T01:34:16.652Z","capacityClaims":[{"id":"58550a3c-72ec-48dc-b5a4-ad01527a1a7b","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","series":"energized","valueGw":0.2,"asOf":"2025-02-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Eagle-Mountain-Data-Center.pdf","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Reported ~200 MW operational capacity.","createdAt":"2026-08-17T20:25:18.190Z"},{"id":"689a58fe-76b9-4f36-b0b2-7653486e7458","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","series":"announced","valueGw":1.8,"asOf":"2025-11-21T00:00:00.000Z","sourceUrl":"https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Cited scaling ceiling up to 1.8 GW; not a contracted figure.","createdAt":"2026-08-17T20:25:19.075Z"}],"location":{"name":"Eagle Mountain","slug":"eagle-mountain-utah"},"capacity_picture":{"announced_gw":1.8,"energized_gw":0.2,"announced_minus_energized_gw":1.6}},{"id":"963decea-f424-4814-a8de-94389e75476a","slug":"google-the-dalles-wasco-county","name":"Google The Dalles Data Center Campus","aliases":["Google Design LLC The Dalles","The Dalles data center campus"],"locationId":"c66bd0d7-b5fb-4455-b8e1-77013d15b76d","lat":null,"lng":null,"landStatus":"former_industrial","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"2024 use ~434.4M gal/yr (~1.19M gpd), up from 104M gal/yr in 2012; underground water right up to 3.88M gpd acquired with smelter; city commitment up to 2M gpd by Jan 2028, potential 8M gpd with expansion. Retail water via City of The Dalles; subject of a 2022-2023 public-records dispute (The Oregonian).","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Google's ~$1.8B campus on a former aluminum smelter site has multiple operational data centers under Enterprise Zone agreements (2005/2013/2015) plus newer buildings under a 2021 Strategic Investment Program agreement with The Dalles and Wasco County; the city approved a fifth data center. Per-building MW load is not disclosed, but scale (2024 water use ~434M gallons; a >100 MW dedicated wind PPA) indicates the campus well exceeds 100 MW.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"http://www.thedalles.gov/business/google_data_centers/ezandsipagreements.php","date":"2021-11-09","title":"Enterprise Zone & Strategic Investment Program Agreements with Google","publisher":"City of The Dalles"},{"url":"https://www.costar.com/article/1934080842/google-advances-plan-to-expand-sprawling-data-center-campus-near-portland-oregon","date":"2024-01-01","title":"Google advances plan to expand sprawling data center campus near Portland, Oregon","publisher":"CoStar"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:12.469Z","updatedAt":"2026-08-19T00:14:47.168Z","capacityClaims":[],"location":{"name":"The Dalles","slug":"the-dalles-oregon"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"14b61c59-fa5c-4cf4-8fe6-6bade90cae32","slug":"amazon-hermiston-umatilla-county","name":"Amazon (AWS) Hermiston / Umatilla Data Center Campus","aliases":["AWS Hermiston","AWS Umatilla"],"locationId":"6caed8f6-fb8a-4b9b-a3c4-5dc47c0de8b7","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"Hermiston annexed 810 acres into its Urban Growth Boundary (South Hermiston Industrial Park) in Sept 2025 for future data centers. Region attractive for proximity to Columbia River water supply. Existing AWS load served via PacifiCorp.","servingUtility":null,"acreage":810,"totalBuildingSqft":null,"streetAddress":null,"notes":"AWS has operational capacity in the Umatilla/Hermiston area (a tracker lists an operational site at 100-250 MW on PacifiCorp) plus active expansion: Hermiston annexed ~800 acres for hyperscale use and Amazon filed Greater Hermiston / Long-Term Rural Enterprise Zone abatements for two new campuses near Feedville. A reported ~500 MW Umatilla campus figure is not confirmed by a public utility filing.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","date":"2025-09-10","title":"Hermiston clears the way for data center industry","publisher":"OPB"},{"url":"https://www.datacenterdynamics.com/en/news/amazon-looking-to-develop-more-data-centers-in-oregons-hermiston/","date":"2024-01-01","title":"Amazon looking to develop more data centers in Oregon's Hermiston","publisher":"Data Center Dynamics"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:06.176Z","updatedAt":"2026-08-19T00:14:25.495Z","capacityClaims":[{"id":"49a1df35-fe46-47be-9ff8-d795034478e1","dataCenterId":"14b61c59-fa5c-4cf4-8fe6-6bade90cae32","series":"energized","valueGw":0.1,"asOf":"2018-01-01T00:00:00.000Z","sourceUrl":"https://www.interconnection.fyi/data-center/project/amazon-d6e196fe","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Tracker lists an operational Hermiston/Umatilla site at 100-250 MW; lower bound used.","createdAt":"2026-08-17T20:25:06.850Z"},{"id":"8c7e050f-f5ef-4703-bb9a-f0dbab751802","dataCenterId":"14b61c59-fa5c-4cf4-8fe6-6bade90cae32","series":"announced","valueGw":0.5,"asOf":"2024-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/amazon-looking-to-develop-more-data-centers-in-oregons-hermiston/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Reported ~500 MW Umatilla campus; not confirmed by utility filing.","createdAt":"2026-08-17T20:25:07.748Z"},{"id":"dda03c64-09ae-4cbe-a006-4e66ff05ec14","dataCenterId":"14b61c59-fa5c-4cf4-8fe6-6bade90cae32","series":"energized","valueGw":0.131,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://baxtel.com/data-center/amazon-hermiston-or","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Tracker-reported existing AWS Hermiston operational capacity ~130.9 MW on PacifiCorp; part of larger AWS Umatilla/Morrow county footprint with additional expansion planned.","createdAt":"2026-08-19T00:14:26.214Z"}],"location":{"name":"Hermiston","slug":"hermiston-oregon"},"capacity_picture":{"announced_gw":0.5,"energized_gw":0.1,"announced_minus_energized_gw":0.4}},{"id":"11de3cbb-092d-403c-86fb-37f506ab6361","slug":"amazon-boardman-morrow-county","name":"Amazon (AWS) Boardman Data Center Campus","aliases":["AWS Boardman","Amazon Boardman Cloud"],"locationId":"c708fa92-be3e-46ab-8480-28d973a1fa3a","lat":45.84,"lng":-119.702,"landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"AWS operates multiple data centers in Morrow County near the Port of Morrow with a much larger planned buildout (reported up to ~1,000 MW across ~20 buildings). Morrow County approved a ~$1B tax-abatement package (2023). Exact operational MW per building and the firm schedule for remaining approved facilities are not public; the 1,000 MW figure is a full-campus planning projection, not energized load.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.opb.org/article/2023/05/19/amazon-data-center-oregon-morrow-county/","date":"2023-05-19","title":"Morrow County OKs $1 billion deal in tax breaks with Amazon","publisher":"OPB"},{"url":"https://www.kgw.com/article/news/local/eastern-oregon/amazon-1-billion-tax-breaks-eastern-oregon-new-data-centers/283-8a8e3b9f-7846-49b2-9731-9b5c32a6537b","date":"2023-05-19","title":"Amazon to receive $1 billion in tax breaks in eastern Oregon for new data centers","publisher":"KGW"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:00.293Z","updatedAt":"2026-08-17T20:26:11.219Z","capacityClaims":[{"id":"56de9ec9-df43-4402-b976-19837a3dbab1","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","series":"announced","valueGw":1,"asOf":"2026-03-30T00:00:00.000Z","sourceUrl":"https://www.geekwire.com/2026/report-amazon-buys-1300-acres-near-columbia-river-that-could-become-a-giant-data-center/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"~1 GW full campus. Original claimant: Morrow County land-use filing (Johnson Economics) for Amazon; access source GeekWire/The Oregonian.","createdAt":"2026-08-17T20:25:01.051Z"}],"location":{"name":"Boardman","slug":"boardman-oregon"},"capacity_picture":{"announced_gw":1,"energized_gw":null,"announced_minus_energized_gw":1}},{"id":"7181d3aa-298b-4b24-8284-dac3c43239b6","slug":"vermaland-la-osa-pinal","name":"Vermaland La Osa Data Center Park (Pinal County)","aliases":["La Osa","Vermaland Pinal Data Center Park"],"locationId":"a9025089-5428-401d-a63f-7c524ac6a452","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"rumored","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"Site located along the Green Canal south of Eloy, Pinal County.","servingUtility":null,"acreage":3374,"totalBuildingSqft":null,"streetAddress":null,"notes":"Proposed ~3,374-acre park along the Green Canal south of Eloy (~1,910 acres for data centers); up to 3 GW, ~$33B, ~10-year buildout. Power would start from an on-site ~480-acre gas plant plus battery storage and adjacent solar (solar land application pending with AZ State Land Dept). Pinal County P&Z reviewed the Comprehensive Plan amendment in a July 2026 work session but took no action; officials sought more large-data-center guidance as of Aug 2026. Highly early-stage and unentitled.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://azbex.com/planning-development/states-largest-data-center-project-part-of-vermaland-pinal-plan/","date":"2025-09-01","title":"State's Largest Data Center Project Part of Vermaland Pinal Plan","publisher":"AZBEX"},{"url":"https://www.kjzz.org/politics/2026-08-13/pinal-county-officials-seek-more-guidance-on-large-scale-data-centers-ahead-of-la-osa-decision","date":"2026-08-13","title":"Pinal County officials seek more guidance on large-scale data centers ahead of La Osa decision","publisher":"KJZZ"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:55.984Z","updatedAt":"2026-08-19T00:29:25.799Z","capacityClaims":[{"id":"90f86321-ec10-4815-9333-b577bcaddf03","dataCenterId":"7181d3aa-298b-4b24-8284-dac3c43239b6","series":"announced","valueGw":3,"asOf":"2025-09-01T00:00:00.000Z","sourceUrl":"https://azbex.com/planning-development/states-largest-data-center-project-part-of-vermaland-pinal-plan/","sourceType":"county_docket","evidenceTier":"claimed","supersedesId":null,"note":"Up to 3 GW at full buildout per developer's Comprehensive Plan amendment materials; no interconnection or tenant confirmed.","createdAt":"2026-08-17T20:24:56.675Z"},{"id":"c17fbb17-304c-4374-9004-794d58caaa6a","dataCenterId":"7181d3aa-298b-4b24-8284-dac3c43239b6","series":"announced","valueGw":1,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://www.kjzz.org/fronteras-desk/2026-05-28/largest-proposed-data-center-in-arizona-to-be-scaled-back-80-after-opposition","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Scaled back ~80% after Pinal County resident opposition: revised to 11 data-center buildings and one gas-fired plant, limited to 1 GW of energy demand.","createdAt":"2026-08-19T00:29:26.487Z"}],"location":{"name":"Eloy","slug":"eloy-arizona"},"capacity_picture":{"announced_gw":1,"energized_gw":null,"announced_minus_energized_gw":1}},{"id":"65cc65ec-d466-4830-a24f-34926a4a9436","slug":"qts-phoenix-3-glendale","name":"QTS Phoenix 3 Campus (Glendale)","aliases":["QTS PHX3","QTS Phoenix 3"],"locationId":"760348ca-28c3-4d35-98c5-213ce2f966f4","lat":null,"lng":null,"landStatus":"private","lifecycleState":"permitted","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":null,"servingUtility":null,"acreage":375,"totalBuildingSqft":null,"streetAddress":null,"notes":"Planned ~375-acre campus north of Camelback Road along Cotton Lane; site acquired July 2022 for $255.3M with initial plans filed with the City of Glendale in early 2023. QTS (Blackstone-owned) states 750 MW of critical capacity across ~16 buildings (~3M sq ft) plus a ~29-acre substation. Exact rezoning/air-permit approval status not confirmed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/qts-files-for-750mw-campus-in-phoenix-arizona/","date":"2023-01-01","title":"QTS files for 750MW campus in Phoenix, Arizona","publisher":"Data Center Dynamics"},{"url":"https://www.commercialsearch.com/news/qts-eyes-3rd-phoenix-data-center-campus/","date":"2023-01-01","title":"Blackstone's QTS Eyes Phoenix Data Center No. 3","publisher":"Commercial Property Executive"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:50.169Z","updatedAt":"2026-08-19T00:29:44.299Z","capacityClaims":[{"id":"3785853f-b85c-40b1-a326-380323204529","dataCenterId":"65cc65ec-d466-4830-a24f-34926a4a9436","series":"announced","valueGw":0.75,"asOf":"2023-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/qts-files-for-750mw-campus-in-phoenix-arizona/","sourceType":"county_docket","evidenceTier":"reported","supersedesId":null,"note":"750 MW critical capacity per QTS and Glendale filing; tied to a substation plan.","createdAt":"2026-08-17T20:24:50.837Z"}],"location":{"name":"Glendale","slug":"glendale-arizona"},"capacity_picture":{"announced_gw":0.75,"energized_gw":null,"announced_minus_energized_gw":0.75}},{"id":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","slug":"edgecore-mesa-north-campus","name":"EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)","aliases":["EdgeCore Mesa North Campus","EdgeCore Eastmark"],"locationId":"672b6e97-cace-46c4-a79b-ddd5c5c988d1","lat":null,"lng":null,"landStatus":"private","lifecycleState":"permitted","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":null,"servingUtility":null,"acreage":84,"totalBuildingSqft":null,"streetAddress":null,"notes":"Campus at Elliot Road and Everton Terrace in the Eastmark/Elliot Road Technology Corridor; expansion adds ~44 acres to a 40-acre facility, taking capacity from >200 MW to >450 MW. Mesa Planning & Zoning approved a scaled-back plan (two ~618K sq ft buildings) in early 2025 with generator-testing and mural conditions. Firm energization schedule not disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.aztechcouncil.org/edgecore-data-center-mesa-planning-zoning/","date":"2025-03-12","title":"EdgeCore's massive data center campus in Mesa clears checkpoint","publisher":"Arizona Technology Council"},{"url":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/","date":"2025-05-21","title":"EdgeCore expands Mesa data center campus in Arizona","publisher":"Data Center Dynamics"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:45.390Z","updatedAt":"2026-08-19T00:15:30.746Z","capacityClaims":[{"id":"de3668a2-aa59-497c-9895-c0af60f895e0","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","series":"announced","valueGw":0.45,"asOf":"2025-05-21T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/","sourceType":"county_docket","evidenceTier":"reported","supersedesId":null,"note":"Expansion raises campus from >200 MW to >450 MW; tied to Mesa P&Z site-plan approval.","createdAt":"2026-08-17T20:24:46.165Z"},{"id":"12ac49e0-46e5-4c56-8bab-4b4f1ed20d63","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","series":"energized","valueGw":0.206,"asOf":"2025-05-20T00:00:00.000Z","sourceUrl":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"Existing Mesa (Elliot Road Technology Corridor) critical load per EdgeCore; first building PH01 operational","createdAt":"2026-08-19T00:15:31.509Z"}],"location":{"name":"Mesa","slug":"mesa-arizona"},"capacity_picture":{"announced_gw":0.45,"energized_gw":0.206,"announced_minus_energized_gw":0.24400000000000002}},{"id":"121efb2d-c261-49da-af33-27e6a989a1b1","slug":"google-mesa-redhawk","name":"Google Mesa Data Center (Redhawk)","aliases":["Redhawk","Google Redhawk Mesa"],"locationId":"672b6e97-cace-46c4-a79b-ddd5c5c988d1","lat":null,"lng":null,"landStatus":"private","lifecycleState":"energized","powerSourceMix":"solar_storage","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"Air-cooled to minimize water consumption given regional water scarcity (Google)","servingUtility":null,"acreage":185,"totalBuildingSqft":null,"streetAddress":null,"notes":"~$600M air-cooled campus; Phase 1 data hall reported operational since July 2025. Google signed an SRP energy agreement for 430+ MW of new carbon-free (wind/solar/storage) capacity from NextEra to serve Arizona operations. The 430 MW is contracted clean-energy supply, not a stated IT/critical-load figure; the campus's own MW capacity is not separately disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://esgnews.com/google-signs-agreement-with-salt-river-project-srp-to-support-more-than-430-carbon-free-megawatts/","date":"2024-03-01","title":"Google signs agreement with SRP to support more than 430 carbon-free megawatts","publisher":"ESG News"},{"url":"https://www.latitudemedia.com/news/in-lieu-of-water-cooling-google-locks-down-renewables-for-mesa-data-center/","date":"2024-03-01","title":"In lieu of water cooling, Google locks down renewables for Mesa data center","publisher":"Latitude Media"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:40.751Z","updatedAt":"2026-08-19T00:15:18.304Z","capacityClaims":[{"id":"d754a12b-7001-4910-be08-00a19660fead","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","series":"announced","valueGw":0.4,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://dcpulse.com/project/google-red-hawk-mesa-arizona-ai-data-center","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Tracker estimate of campus AI capacity (~400MW); not company-confirmed","createdAt":"2026-08-19T00:15:18.994Z"}],"location":{"name":"Mesa","slug":"mesa-arizona"},"capacity_picture":{"announced_gw":0.4,"energized_gw":null,"announced_minus_energized_gw":0.4}},{"id":"a1629c36-66b6-4b2a-b032-15c4882e56f5","slug":"microsoft-goodyear-phx70","name":"Microsoft Goodyear Data Center Campus (PHX70)","aliases":["PHX70","PHX-10","Microsoft Goodyear Airpark"],"locationId":"a0f820aa-b620-4286-a9d5-f57021cf8536","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"Microsoft committed ~$36M toward a ~$90M expansion of Goodyear wastewater treatment; targets ~42M gallons/yr water savings (tracker-reported). Sources conflict on total campus acreage (147-acre documented land parcel vs ~300-acre marketed campus).","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Roughly $1.5B five-building hyperscale campus on ~300 acres; reported ~263 MW total capacity with early phases (PHX-10, PHX-11) operational. Exact contracted MW and buildout schedule for remaining buildings are not disclosed; the campus figure comes from an aggregator, not a primary utility filing.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://mlq.ai/permit-filings/usa/arizona/goodyear/p0013042/","date":"2025-01-01","title":"Microsoft Azure P0013042 air permit filing (Goodyear)","publisher":"MLQ Infrastructure"},{"url":"https://www.goodyearaz.gov/Home/Components/News/News/9847/1549","date":"2023-04-01","title":"Microsoft Builds World-Class Datacenter Campus in Goodyear","publisher":"City of Goodyear"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:36.059Z","updatedAt":"2026-08-19T00:14:15.095Z","capacityClaims":[{"id":"2021af20-70a1-402e-a5a2-b9973d80f963","dataCenterId":"a1629c36-66b6-4b2a-b032-15c4882e56f5","series":"announced","valueGw":0.263,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenters.com/microsoft-azure-goodyear-usa-phx70","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Tracker figure for full PHX70 build-out; other trackers cite ~143 MW. PHX-10 and PHX-11 phases reported operational since 2024. Address 3785 Citrus Rd, Goodyear AZ.","createdAt":"2026-08-19T00:14:15.801Z"}],"location":{"name":"Goodyear","slug":"goodyear-arizona"},"capacity_picture":{"announced_gw":0.263,"energized_gw":null,"announced_minus_energized_gw":0.263}},{"id":"0c2fac3e-e47d-416b-802d-98731445f823","slug":"msb-global-matrix-sulphur-springs","name":"Matrix Data Center Campus (The Matrix Center)","aliases":["The Matrix Center","Matrix Data Center Campus","MSB Global Sulphur Springs"],"locationId":"dacef6f6-2cdb-49a1-8972-9627b59143de","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":390,"totalBuildingSqft":null,"streetAddress":null,"notes":"Early site work is real and independently reported (utility infrastructure Feb 2025, groundbreaking 2025-06-13, land clearing Sept 2025), but the headline scope is developer-claimed and unverified. MSB Global Services promotes a 16,000+ acre site and a 3 GW campus of 30 x 100 MW buildings ($18B, 'optimized for NVIDIA GB300'); local reporting (KSST) openly questions execution, no hyperscale tenant is named, and MSB's own direct commitment is cited as only ~$140M for roads/infrastructure. No TCEQ air permit for the claimed Bloom/gas/geothermal microgrids and no verified data-center tax-abatement docket were found (a Ch.313 'Hopkins Energy LLC' is a SEPARATE solar project).","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.ketk.com/news/local-news/30-ai-data-centers-to-be-built-at-sulphur-springs-campus/","date":"2026-01-20","title":"30 AI data centers to be built at Sulphur Springs campus","publisher":"KETK"},{"url":"https://www.constructionequipmentguide.com/work-under-way-on-ai-data-center-in-sulphur-springs/69340","date":"2025-10-15","title":"Work Under Way On AI Data Center in Sulphur Springs","publisher":"Construction Equipment Guide"},{"url":"https://www.ksstradio.com/2025/10/can-msb-global-actually-pull-off-huge-data-center-project/","date":"2025-10-01","title":"Can MSB Global Actually Pull Off Huge Data Center Project?","publisher":"KSST Radio"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:30.046Z","updatedAt":"2026-08-19T00:15:25.256Z","capacityClaims":[{"id":"39870537-0f95-4a4b-8572-75366497355d","dataCenterId":"0c2fac3e-e47d-416b-802d-98731445f823","series":"announced","valueGw":3,"asOf":"2025-06-13T00:00:00.000Z","sourceUrl":"https://www.ketk.com/news/local-news/30-ai-data-centers-to-be-built-at-sulphur-springs-campus/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Developer-claimed full buildout: 30 x 100 MW = 3,000 MW by ~2028-2029; no independent confirmation, no named tenant.","createdAt":"2026-08-17T20:24:30.820Z"},{"id":"2b1b7012-3313-4963-9b2f-e3af9a9b85be","dataCenterId":"0c2fac3e-e47d-416b-802d-98731445f823","series":"announced","valueGw":0.8,"asOf":"2026-03-01T00:00:00.000Z","sourceUrl":"https://www.constructionequipmentguide.com/work-under-way-on-ai-data-center-in-sulphur-springs/69340","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Phase 1 = 8 x 100 MW (~800 MW), developer-claimed.","createdAt":"2026-08-17T20:24:31.663Z"},{"id":"6c6c48ff-53c5-48a9-a5fe-a9401b7f6fa9","dataCenterId":"0c2fac3e-e47d-416b-802d-98731445f823","series":"under_construction","valueGw":0.1,"asOf":"2026-03-01T00:00:00.000Z","sourceUrl":"https://msbglobalservices.com/matrix-data-center-campus-breaks-ground-in-sulphur-springs-tx-a-new-era-for-net-zero-ai-infrastructure/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"First 100 MW building on Bloom Energy fuel-cell microgrid; developer-claimed delivery March 2026","createdAt":"2026-08-19T00:15:25.946Z"}],"location":{"name":"Sulphur Springs","slug":"sulphur-springs-texas"},"capacity_picture":{"announced_gw":0.8,"energized_gw":null,"announced_minus_energized_gw":0.8}},{"id":"8232a60d-0da2-4f84-866f-abd7e82bfb0f","slug":"beale-project-blue-pima","name":"Project Blue (Beale Infrastructure Pima County data center)","aliases":["Project Blue","Humphrey's Peak Properties","Beale Infrastructure Tucson data center"],"locationId":"f4d320f4-f02e-4d9f-b2d1-78682783133f","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"Tucson City Council rejected annexation/city-water (2025-08-06); project proceeded on ~290 acres of unincorporated Pima County land immediately north of the Pima County Fairgrounds.","servingUtility":null,"acreage":290,"totalBuildingSqft":null,"streetAddress":null,"notes":"After Tucson City Council unanimously rejected annexation/city-water (2025-08-06), Beale Infrastructure proceeded on ~290 acres of formerly county-owned desert in unincorporated Pima County near the Fairgrounds; land sale closed 2025-12-24 after Beale waived the annexation condition and switched to closed-loop air cooling. Arizona Corporation Commission approved a TEP power agreement 4-1 on 2025-12-05; construction began ~April 2026, target online 2027. AWS was the reported original operator but withdrew; no offtaker is currently confirmed. A January 2026 lawsuit challenges the approval.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://tucson.com/news/local/government-politics/article_f6f28e33-7a22-4609-be37-f86d9eda00f7.html","date":"2025-08-26","title":"TEP seeks OK to serve Project Blue at site rejected by Tucson council","publisher":"Arizona Daily Star"},{"url":"https://www.kjzz.org/the-show/2025-12-09/rejected-by-tucson-and-abandoned-by-amazon-project-blue-data-center-moves-forward","date":"2025-12-09","title":"Rejected by Tucson and abandoned by Amazon, Project Blue data center moves forward","publisher":"KJZZ"},{"url":"https://www.tucsonsentinel.com/local/report/122425_project_blue_close/","date":"2025-12-24","title":"Project Blue developers close on purchase of Pima County land","publisher":"Tucson Sentinel"},{"url":"https://www.kold.com/2026/01/16/new-lawsuit-threatens-project-blue-pima-county/","date":"2026-01-16","title":"New lawsuit threatens Project Blue in Pima County","publisher":"KOLD News 13"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:23.278Z","updatedAt":"2026-08-19T00:29:21.265Z","capacityClaims":[{"id":"bb4764af-0afc-47bf-87c0-1a89190549bd","dataCenterId":"8232a60d-0da2-4f84-866f-abd7e82bfb0f","series":"contracted","valueGw":0.286,"asOf":"2025-12-05T00:00:00.000Z","sourceUrl":"https://tucson.com/news/local/government-politics/article_f6f28e33-7a22-4609-be37-f86d9eda00f7.html","sourceType":"utility_filing","evidenceTier":"verified","supersedesId":null,"note":"TEP filing to ACC provides up to 286 MW from existing resources; ACC approved 2025-12-05.","createdAt":"2026-08-17T20:24:24.027Z"},{"id":"b73594ac-5126-4063-b89c-60ee4c561c6d","dataCenterId":"8232a60d-0da2-4f84-866f-abd7e82bfb0f","series":"announced","valueGw":0.6,"asOf":"2025-08-27T00:00:00.000Z","sourceUrl":"https://azluminaria.org/2025/08/27/project-blue-data-center-pima-county-beale-infrastructure-tep/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Full buildout reported at 400-600 MW; upper bound shown.","createdAt":"2026-08-17T20:24:24.896Z"}],"location":{"name":"Tucson","slug":"tucson-arizona"},"capacity_picture":{"announced_gw":0.6,"energized_gw":null,"announced_minus_energized_gw":0.6}},{"id":"f6b83182-0a0d-448e-9e52-8aed60c10086","slug":"alterra-marshall-michigan","name":"Alterra Marshall Technology & Energy Center","aliases":["Marshall Technology Center","Marshall Technology Park"],"locationId":"ca5f5333-63f8-4e35-8a2e-8b75cd4acb82","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"stalled","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":null,"waterSourceNotes":"Closed-loop liquid cooling proposed to minimize water use; developer said it would not draw from Stuart Lake (reported, Dec 2025). No gpd figure sourced.","servingUtility":null,"acreage":270,"totalBuildingSqft":null,"streetAddress":null,"notes":"Contested Alterra Development proposal for a data center plus on-site gas plant on ~270 acres (112 buildable) in Brooks Industrial Park, a SEPARATE parcel from the Ford BlueOval/MAJOR megasite. Land bought from the Marshall LDFA for $1.12M on 2025-10-30, but a city data-center moratorium delays approval to ~Aug 2027 and EGLE wetland review is ongoing. No air permit for the ~1,000 MW gas turbine has been filed; final capacity, offtaker, and supplying utility are unconfirmed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://wwmt.com/news/local/story/data-center-gas-generation-plant-proposed-in-marshall-alterra-development-calhoun-county-energy-electricity-water","date":"2025-12-15","title":"Data center, gas generation plant proposed in Marshall","publisher":"WWMT"},{"url":"https://wwmt.com/news/local/marshall-data-center-moratorium-delays-development-one-year-alterra-brooks-industrial-park-acres-wetland-lake-energy-environment-calhoun-county-west-michigan","date":"2026-01-15","title":"Marshall data center moratorium delays development by at least one year","publisher":"WWMT"},{"url":"https://wtvbam.com/2025/12/18/new-technology-park-planned-for-marshall/","date":"2025-12-18","title":"New Technology Park planned for Marshall","publisher":"WTVB"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:18.603Z","updatedAt":"2026-08-19T00:14:42.227Z","capacityClaims":[{"id":"6be304ad-2b32-4698-95c4-6210320b7e45","dataCenterId":"f6b83182-0a0d-448e-9e52-8aed60c10086","series":"announced","valueGw":1.4,"asOf":"2025-12-18T00:00:00.000Z","sourceUrl":"https://wwmt.com/news/local/story/data-center-gas-generation-plant-proposed-in-marshall-alterra-development-calhoun-county-energy-electricity-water","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Up to 1,400 MW at full buildout per developer statements in local press; not permitted.","createdAt":"2026-08-17T20:24:19.285Z"}],"location":{"name":"Marshall","slug":"marshall-michigan"},"capacity_picture":{"announced_gw":1.4,"energized_gw":null,"announced_minus_energized_gw":1.4}},{"id":"a6b4ec9e-0a60-4e81-92a2-cbd514edd057","slug":"energy-abundance-data-city-laredo-webb-texas","name":"Data City (Energy Abundance)","aliases":["Data City Texas","Energy Abundance Development Corporation"],"locationId":"911888c9-12b6-4d81-a9c6-7ee8facfd3c4","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":50000,"totalBuildingSqft":null,"streetAddress":null,"notes":"Energy Abundance Development Corporation announced 'Data City,' a planned 5 GW behind-the-meter data-center hub on ~50,000 acres near Laredo (Webb County), powered by wind, solar, batteries and dual-fuel gas turbines transitioning to green hydrogen. As of mid-2026 the evidence is developer press only; no TCEQ permit, ERCOT queue entry, or named tenant was found, and Phase-1 (~300 MW, 2026) had not been independently confirmed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html","date":"2025-04-07","title":"Energy Abundance Announces Data City, Texas","publisher":"PR Newswire"},{"url":"https://www.datacenterdynamics.com/en/news/5gw-data-center-with-behind-the-meter-hydrogen-power-planned-for-laredo-texas/","date":"2025-04-07","title":"Up to 5GW data center with behind-the-meter hydrogen power planned for Laredo, Texas","publisher":"DCD"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:14.217Z","updatedAt":"2026-08-19T00:29:42.089Z","capacityClaims":[{"id":"a86df0c3-42c9-4a03-8fd3-8d060d490ce6","dataCenterId":"a6b4ec9e-0a60-4e81-92a2-cbd514edd057","series":"announced","valueGw":5,"asOf":"2025-04-07T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"5 GW ultimate; 300 MW Phase 1 claimed for 2026","createdAt":"2026-08-17T20:24:15.042Z"}],"location":{"name":"Laredo","slug":"laredo-texas"},"capacity_picture":{"announced_gw":5,"energized_gw":null,"announced_minus_energized_gw":5}},{"id":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","slug":"vantage-tx1-san-antonio-bexar-texas","name":"Vantage TX1 San Antonio Campus","aliases":["Vantage TX1","Vantage San Antonio","TX12"],"locationId":"8c451bb9-eebd-4176-8769-5faee040cbc5","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Vantage's San Antonio (Bexar County) campuses hold TCEQ minor air permits and are seeking to expand from 22 to 80+ generators; VoltaGrid is building ~423 MW of on-site natural-gas generation across two Vantage sites (near SH-151/Wiseman and on Omicron Drive). This is distinct from Vantage's Frontier campus in Shackelford County. Total IT capacity is reported in ranges (TX1 ~100-250 MW) and not firmly disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/vantage-files-to-build-second-san-antonio-data-center-in-texas/","date":"2026-07-01","title":"Vantage files to build second San Antonio data center in Texas","publisher":"DCD"},{"url":"https://www.ksat.com/news/local/2026/07/10/air-quality-concerns-rise-as-data-center-company-seeks-approval-to-run-diesel-generators/","date":"2026-07-10","title":"Air quality concerns rise as data center company seeks approval to run diesel generators","publisher":"KSAT"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:09.801Z","updatedAt":"2026-08-17T20:26:03.364Z","capacityClaims":[{"id":"746a9f40-5494-4c16-8b3d-04451f0d0b84","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","series":"under_construction","valueGw":0.096,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.datacenters.com/vantage-tx12-san-antonio","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Building TX12 (Omicron Dr campus): up to 96 MW critical IT, two-story, 432,800 sq ft.","createdAt":"2026-08-19T00:14:58.831Z"},{"id":"010a2a79-15dc-479a-9683-05c605372873","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","series":"under_construction","valueGw":0.032,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.datacenters.com/vantage-tx11-san-antonio","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Building TX11: 32 MW critical IT, 242,665 sq ft, go-live early 2026.","createdAt":"2026-08-19T00:14:59.684Z"}],"location":{"name":"San Antonio","slug":"san-antonio-texas"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","slug":"landbridge-powerbridge-alpha-digital-reeves-texas","name":"Alpha Digital Campus (LandBridge / PowerBridge)","aliases":["Alpha Digital Campus","LandBridge PowerBridge Reeves"],"locationId":"8ba6b6b6-6340-4ffe-8649-dacd7c607c26","lat":null,"lng":null,"landStatus":"private","lifecycleState":"announced","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":3400,"totalBuildingSqft":null,"streetAddress":null,"notes":"LandBridge (NYSE: LB) signed an April 2026 lease-development agreement with PowerBridge for up to ~3,400 acres in Reeves County near the Waha gas hub for a giga-scale data center campus with up to 2 GW of co-located power generation. End data-center tenant and financing are not disclosed; initial power targeted 2027.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.businesswire.com/news/home/20260402043900/en/LandBridge-Announces-Agreement-with-PowerBridge-for-the-Development-of-a-2-GW-Powered-Data-Center-Campus","date":"2026-04-02","title":"LandBridge Announces Agreement with PowerBridge for the Development of a 2 GW Powered Data Center Campus","publisher":"BusinessWire"},{"url":"https://www.datacenterdynamics.com/en/news/landbridge-powerbridge-partner-for-2gw-data-center-campus-in-west-texas/","date":"2026-04-02","title":"LandBridge & PowerBridge partner for 2GW data center campus in West Texas","publisher":"DCD"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:04.786Z","updatedAt":"2026-08-19T00:29:18.131Z","capacityClaims":[{"id":"41f51eba-8d27-4649-b2b3-6c23b23a4824","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","series":"announced","valueGw":2,"asOf":"2026-04-02T00:00:00.000Z","sourceUrl":"https://www.businesswire.com/news/home/20260402043900/en/LandBridge-Announces-Agreement-with-PowerBridge-for-the-Development-of-a-2-GW-Powered-Data-Center-Campus","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"Up to 2 GW co-located power; disclosed by public-company (LandBridge) IR/SEC","createdAt":"2026-08-17T20:24:05.470Z"}],"location":{"name":"Pecos","slug":"pecos-texas"},"capacity_picture":{"announced_gw":2,"energized_gw":null,"announced_minus_energized_gw":2}},{"id":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","slug":"cyrusone-dfw10-whitney-thad-hill-bosque-texas","name":"CyrusOne DFW10 Whitney / Thad Hill Powered Land","aliases":["Thad Hill Energy Center powered land","CyrusOne DFW10-Whitney","DFW17"],"locationId":"d21d777b-6958-4055-a9a9-3c75a3933835","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"CyrusOne is building a hyperscale campus (DFW10/DFW17 buildings) on 'powered land' adjacent to Calpine's ~250 MW Thad Hill Energy Center in Bosque County near Whitney; a 190 MW Phase-1 power agreement expanded toward a ~400 MW commitment. Backed by GIP/BlackRock and KKR; end tenant not disclosed. Phase 1 targeted Q4 2026.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.power-eng.com/gas/calpine-lands-190-mw-agreement-for-new-hyperscale-data-center-in-texas/","date":"2025-07-30","title":"Calpine lands 190-MW agreement for new hyperscale data center in Texas","publisher":"Power Engineering"},{"url":"https://www.datacenterdynamics.com/en/news/cyrusone-files-to-expand-data-center-campus-outside-waco-texas/","date":"2025-12-09","title":"CyrusOne files to expand data center campus outside Waco, Texas","publisher":"DCD"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:59.192Z","updatedAt":"2026-08-17T20:26:01.787Z","capacityClaims":[{"id":"ed5d3b6b-9003-4131-96a0-30a7bd9e5ed2","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","series":"contracted","valueGw":0.19,"asOf":"2025-07-30T00:00:00.000Z","sourceUrl":"https://www.power-eng.com/gas/calpine-lands-190-mw-agreement-for-new-hyperscale-data-center-in-texas/","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"Phase-1 power agreement 190 MW","createdAt":"2026-08-17T20:23:59.952Z"},{"id":"47a3398a-663e-4340-ae75-f27df4182925","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","series":"announced","valueGw":0.4,"asOf":"2025-12-09T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/cyrusone-files-to-expand-data-center-campus-outside-waco-texas/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"~400 MW total power agreement reported","createdAt":"2026-08-17T20:24:00.791Z"},{"id":"308de30d-969c-4b47-a591-f0f02ee9eb67","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","series":"contracted","valueGw":0.4,"asOf":"2025-11-03T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas-302602881.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Total 400 MW Calpine powered-land agreement: 190 MW Phase 1 (Jul 2025) plus 210 MW added in Phase 2 (Nov 2025), from the adjacent Thad Hill Energy Center.","createdAt":"2026-08-19T00:29:34.229Z"},{"id":"3fc159df-85c7-4d3b-a7f0-266b1d1a7d5a","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","series":"announced","valueGw":0.19,"asOf":"2025-07-30T00:00:00.000Z","sourceUrl":"https://www.calpine.com/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Phase 1: 190 MW power supply, >190,000 sq ft, DFW10 building.","createdAt":"2026-08-19T00:29:35.063Z"},{"id":"71317657-d530-4d37-90ce-230e90400906","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","series":"under_construction","valueGw":0.144,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://hoodline.com/2025/12/tiny-whitney-braces-as-cyrusone-drops-400-megawatt-data-center-bombshell/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Initial IT load ~144 MW across >700,000 sq ft build-out; campus could ultimately reach ~400 MW. Operational expected Q4 2026.","createdAt":"2026-08-19T00:29:35.751Z"}],"location":{"name":"Whitney","slug":"whitney-texas"},"capacity_picture":{"announced_gw":0.4,"energized_gw":null,"announced_minus_energized_gw":0.4}},{"id":"43a07716-a21a-44dc-96de-1421aa5d186b","slug":"compass-red-oak-dfw3-ellis-texas","name":"Compass Datacenters Red Oak Campus (DFW III)","aliases":["Compass DFW III","Red Oak Datacenter","DFW III-I"],"locationId":"f17d7a76-5c4c-47f8-9212-02fb349fac61","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":300,"totalBuildingSqft":null,"streetAddress":null,"notes":"Compass Datacenters' Red Oak campus in Ellis County holds TCEQ operating permits (Red Oak Datacenter / DFW III) and is planned for ~360 MW across ~10 buildings on 300 acres; five buildings came online 2024-2025 fully leased to a single tenant, with three more added via a 2026 refinancing. The single tenant is not publicly named.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.connectcre.com/stories/compass-datacenters-lands-refi-on-5-red-oak-facilities-to-add-three-more/","date":"2026-01-01","title":"Compass Datacenters Lands Refi on 5 Red Oak Facilities to Add Three More","publisher":"Connect CRE"},{"url":"https://cleanview.co/data-centers/texas/787/dfw---red-oak","date":"2026-01-01","title":"DFW - Red Oak (facility profile)","publisher":"Cleanview"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:55.277Z","updatedAt":"2026-08-19T00:15:37.323Z","capacityClaims":[{"id":"fd0cd86f-3aff-4dcf-9403-635690426aec","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","series":"energized","valueGw":0.36,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://cleanview.co/data-centers/texas/787/dfw---red-oak","sourceType":"permit","evidenceTier":"reported","supersedesId":null,"note":"360 MW planned full campus; portion already online","createdAt":"2026-08-17T20:23:55.968Z"},{"id":"291171ba-3c0c-41be-8149-fd0c7ab5f707","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","series":"announced","valueGw":0.36,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://cleanview.co/data-centers/texas/787/dfw---red-oak","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Full buildout: 10 buildings, 360 MW, across ~300 acres (tracker)","createdAt":"2026-08-19T00:15:38.012Z"},{"id":"223b68cc-f137-47e2-95b1-fefe9e6d6202","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","series":"energized","valueGw":0.18,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://baxtel.com/data-center/compass-red-oak-campus","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Five buildings online 2024-2025, single-tenant leased; ~180 MW existing per trackers","createdAt":"2026-08-19T00:15:38.852Z"}],"location":{"name":"Red Oak","slug":"red-oak-texas"},"capacity_picture":{"announced_gw":0.36,"energized_gw":0.36,"announced_minus_energized_gw":0}},{"id":"242adcda-ceef-4893-a70a-153273e218ab","slug":"google-alamo-mission-midlothian-ellis-texas","name":"Google Midlothian Campus (Alamo Mission)","aliases":["Alamo Mission LLC","Sharka","Google Red Oak/Midlothian"],"locationId":"c741667c-fad5-4047-b86c-d728be7b5e07","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":540,"totalBuildingSqft":null,"streetAddress":null,"notes":"Google's Ellis County hyperscale/AI campus (developed via Alamo Mission LLC, project 'Sharka'; ~266 MW at 3441 Railport Parkway, Midlothian) holds a TCEQ Federal Operating Permit and is expanding as part of Google's stated $40B Texas cloud/AI investment through 2027. Several buildings are operational; total ultimate capacity is not disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/","date":"2026-03-01","title":"Google files for fifth data center at Midlothian campus in Texas","publisher":"DCD"},{"url":"https://www.datacenter.fyi/facility/google-tx-f8cfce73","date":"2026-01-01","title":"Google — Red Oak, TX (facility profile)","publisher":"datacenter.fyi"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:50.597Z","updatedAt":"2026-08-19T00:15:33.360Z","capacityClaims":[{"id":"94fe3ae1-75a1-4364-b030-3a2a27cb086b","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","series":"energized","valueGw":0.2663,"asOf":"2026-03-01T00:00:00.000Z","sourceUrl":"https://www.datacenter.fyi/facility/google-tx-f8cfce73","sourceType":"permit","evidenceTier":"verified","supersedesId":null,"note":"266.3 MW cited; buildout continuing","createdAt":"2026-08-17T20:23:51.321Z"}],"location":{"name":"Midlothian","slug":"midlothian-texas"},"capacity_picture":{"announced_gw":null,"energized_gw":0.2663,"announced_minus_energized_gw":null}},{"id":"a7e192d1-9871-47ea-941d-491df0e1a677","slug":"beacon-dove-creek-tom-green-texas","name":"Dove Creek Data Center (Beacon)","aliases":["Westline TX Holdings","Beacon Dove Creek"],"locationId":"8319a86d-16b7-4adb-8395-1fbbdb3fac81","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":"Off-grid; powered by on-site natural-gas reciprocating engines (RICE). ~1,240 acres of buildable land (est. 70% of total site). Facility sited 0.25 mi south of US 67 on FM 2335, west Tom Green County. Community concerns raised over water and power; water source not specified in permit reporting.","servingUtility":null,"acreage":1240,"totalBuildingSqft":null,"streetAddress":null,"notes":"Westline TX Holdings (linked to Beacon Data Centers) filed a TCEQ air-permit application (HAP93, 184380, PSDTX1710, GHGPSDTX275) in Aug 2026 for a multi-gigawatt data center on FM 2335 south of US 67 in Tom Green County, powered by on-site natural-gas reciprocating engines. Exact planned MW/GW is not publicly stated; Tom Green County commissioners rejected a moratorium and a public hearing was requested.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://sanangelolive.com/news/san-angelo/2026-08-10/dove-creek-data-center-has-applied-tceq-permit-heres-what-know","date":"2026-08-10","title":"Dove Creek Data Center Has Applied for a TCEQ Permit: Here's What to Know","publisher":"San Angelo LIVE"},{"url":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/","date":"2026-08-10","title":"Data Center Permits Detail Proposed Air Quality Footprint","publisher":"Concho Observer"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:46.414Z","updatedAt":"2026-08-19T00:14:22.576Z","capacityClaims":[{"id":"76fa64f0-33a9-4349-9928-4f153932f425","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","series":"announced","valueGw":2.409,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://sanangelolive.com/news/san-angelo/2026-08-10/dove-creek-data-center-has-applied-tceq-permit-heres-what-know","sourceType":"permit_filing","evidenceTier":"reported","supersedesId":null,"note":"Up to 2,409 MW of on-site gas generation per TCEQ air permit application, supplied exclusively to a co-located data center (off-grid, behind-the-meter). Permitting stage as of Aug 2026.","createdAt":"2026-08-19T00:14:23.281Z"}],"location":{"name":"San Angelo","slug":"san-angelo-texas"},"capacity_picture":{"announced_gw":2.409,"energized_gw":null,"announced_minus_energized_gw":2.409}},{"id":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","slug":"sandow-lakes-lee-county-texas","name":"Sandow Lakes Power / Data Center Campus","aliases":["Sandow Lakes Energy","SLEC"],"locationId":"d3cffef4-74af-4a4f-ba06-b762adcc0b24","lat":null,"lng":null,"landStatus":"former_industrial","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"TCEQ issued a 1.2 GW gas power-plant air permit (Oct 2025) at Sandow Lakes Ranch near Blue in Lee County, ~50 miles east of Austin, on the former Alcoa smelter site, to power on-site data-center development; Gemma Power Systems (Argan) received notice to proceed on EPC. Named data-center tenants are not disclosed; a resident air-permit challenge was denied.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.energytech.com/home/article/55280902/rural-texas-county-welcoming-12-gw-gas-fired-project-to-seek-data-center-development","date":"2026-02-10","title":"Rural Texas County Welcoming 1.2-GW Gas-Fired Project to Seek Data Center Development","publisher":"Energy Tech"},{"url":"https://www.texastribune.org/2026/02/02/texas-permian-basin-power-plant-project-data-centers/","date":"2026-02-02","title":"Huge Texas data centers will get their own gas power plants","publisher":"Texas Tribune"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:41.219Z","updatedAt":"2026-08-17T20:25:58.718Z","capacityClaims":[{"id":"d0c44336-325f-4baa-a56a-66fdfb2d3c92","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","series":"announced","valueGw":1.2,"asOf":"2025-10-01T00:00:00.000Z","sourceUrl":"https://www.energytech.com/home/article/55280902/rural-texas-county-welcoming-12-gw-gas-fired-project-to-seek-data-center-development","sourceType":"permit","evidenceTier":"reported","supersedesId":null,"note":"1.2 GW gas plant to serve on-site data-center development; data-center MW not separately stated","createdAt":"2026-08-17T20:23:41.932Z"}],"location":{"name":"Blue","slug":"blue-texas"},"capacity_picture":{"announced_gw":1.2,"energized_gw":null,"announced_minus_energized_gw":1.2}},{"id":"665b9f79-cb24-42f4-ade4-af461047459d","slug":"chevron-project-kilby-reeves-texas","name":"Project Kilby (Chevron / Microsoft)","aliases":["Chevron Permian data center","Kilby"],"locationId":"8ba6b6b6-6340-4ffe-8649-dacd7c607c26","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":2000,"totalBuildingSqft":null,"streetAddress":null,"notes":"Chevron plans a co-located natural-gas power plant to supply a ~2.7 GW Microsoft AI data center on 2,000+ acres in Reeves County (~20 miles south of Pecos) under a 20-year agreement, with GE Vernova and Solar Turbines equipment. Chevron had not reached a final investment decision as of mid-2026; power targeted late 2028.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.chevron.com/newsroom/2026/q2/chevron-signs-20-year-power-agreement-with-microsoft-for-west-texas-data-center","date":"2026-06-22","title":"Chevron Signs 20-Year Power Agreement with Microsoft for West Texas Data Center","publisher":"Chevron"},{"url":"https://www.cnbc.com/2026/06/22/chevron-cvx-microsoft-msft-natural-gas-data-center.html","date":"2026-06-22","title":"Chevron to fuel massive Microsoft data center in Texas using natural gas","publisher":"CNBC"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:35.332Z","updatedAt":"2026-08-19T00:29:11.180Z","capacityClaims":[{"id":"c11fabeb-ade7-4322-9def-414236e52003","dataCenterId":"665b9f79-cb24-42f4-ade4-af461047459d","series":"announced","valueGw":2.7,"asOf":"2026-06-22T00:00:00.000Z","sourceUrl":"https://www.cnbc.com/2026/06/22/chevron-cvx-microsoft-msft-natural-gas-data-center.html","sourceType":"earnings_call","evidenceTier":"reported","supersedesId":null,"note":"2.7 GW data center; some coverage cites 2.5-5 GW","createdAt":"2026-08-17T20:23:36.011Z"},{"id":"2c38d4f3-bcb0-44cb-ba2c-7063cd35a87c","dataCenterId":"665b9f79-cb24-42f4-ade4-af461047459d","series":"announced","valueGw":2.67,"asOf":"2026-06-22T00:00:00.000Z","sourceUrl":"https://www.chevron.com/newsroom/2026/q2/chevron-signs-20-year-power-agreement-with-microsoft-for-west-texas-data-center","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"~2.67 GW of on-site natural-gas generation to be built over time to supply a Microsoft AI campus under a 20-year PPA; power initially islanded (not grid-connected); data center to begin receiving power 2028. FID expected end-2026.","createdAt":"2026-08-19T00:29:11.946Z"}],"location":{"name":"Pecos","slug":"pecos-texas"},"capacity_picture":{"announced_gw":2.7,"energized_gw":null,"announced_minus_energized_gw":2.7}},{"id":"33c65299-63d4-4b41-8137-93839680e5f3","slug":"pacifico-gw-ranch-pecos-texas","name":"GW Ranch (Pacifico Energy)","aliases":["Pacifico GW LLC","GW Ranch Project"],"locationId":"ae3cd15c-df05-435c-8296-4bcacf2b37b6","lat":null,"lng":null,"landStatus":"private","lifecycleState":"permitted","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":8000,"totalBuildingSqft":null,"streetAddress":null,"notes":"Pacifico Energy holds a TCEQ air permit authorizing up to 7.65 GW of on-site gas generation (plus solar and batteries) on an 8,000+ acre ranch ~17 miles north of Fort Stockton, described as the largest US power-generation air permit. Data-center offtakers/tenants and financing are not publicly disclosed; first power targeted Q1 2027, ~5+ GW buildout by 2031.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.businesswire.com/news/home/20260126236053/en/Pacifico-Energy-Secures-7.65-GW-Power-Generation-Permit-for-GW-Ranch-Project","date":"2026-01-26","title":"Pacifico Energy Secures 7.65 GW Power Generation Permit for GW Ranch Project","publisher":"BusinessWire"},{"url":"https://www.texasobserver.org/developer-gw-ranch-pecos-county-largest-power-project-us/","date":"2026-01-29","title":"Country's Largest Air Pollution Permit Issued to Power Plant for Data Centers in West Texas","publisher":"Texas Observer"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&SearchID=15228583&dID=9305207&searchType=External","date":"2026-01-26","title":"Preliminary Determination Summary — Pacifico GW LLC","publisher":"TCEQ"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:30.323Z","updatedAt":"2026-08-19T00:29:29.407Z","capacityClaims":[{"id":"b3d65b62-52ce-4fb6-865a-92471e3df253","dataCenterId":"33c65299-63d4-4b41-8137-93839680e5f3","series":"announced","valueGw":5,"asOf":"2026-01-26T00:00:00.000Z","sourceUrl":"https://www.pacificoenergy.com/gw-ranch","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Data-center buildout stated as 5+ GW by 2031","createdAt":"2026-08-17T20:23:31.007Z"},{"id":"c0dd2c19-9b1e-4bec-a131-4e1bf98a4a80","dataCenterId":"33c65299-63d4-4b41-8137-93839680e5f3","series":"announced","valueGw":7.65,"asOf":"2026-01-30T00:00:00.000Z","sourceUrl":"https://www.businesswire.com/news/home/20260126236053/en/Pacifico-Energy-Secures-7.65-GW-Power-Generation-Permit-for-GW-Ranch-Project","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"TCEQ air permit authorizes up to 7.65 GW of on-site gas-fired generation; described as the largest power-generation air permit ever issued in the US. Off-grid private campus.","createdAt":"2026-08-19T00:29:30.091Z"},{"id":"592ae2f0-1bc4-4426-9eed-d291a865340a","dataCenterId":"33c65299-63d4-4b41-8137-93839680e5f3","series":"announced","valueGw":1,"asOf":"2027-06-01T00:00:00.000Z","sourceUrl":"https://www.constructionowners.com/news/pacifico-energy-wins-permit-for-7-65-gw-gw-ranch-power-campus-in-texas","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Phase 1 to deliver 1 GW; first power expected first half of 2027.","createdAt":"2026-08-19T00:29:30.922Z"}],"location":{"name":"Fort Stockton","slug":"fort-stockton-texas"},"capacity_picture":{"announced_gw":1,"energized_gw":null,"announced_minus_energized_gw":1}},{"id":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","slug":"powerhouse-95-spotsylvania-virginia","name":"PowerHouse 95 (Spotsylvania) Campus","aliases":["PowerHouse 95","Spotsylvania data center campus","PowerHouse Spotsylvania 800MW"],"locationId":"2e64de15-4201-4f83-9f63-5a3cc4511982","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":145,"totalBuildingSqft":null,"streetAddress":null,"notes":"PowerHouse Data Centers (a division of American Real Estate Partners) campus along the I-95 corridor in Spotsylvania County, up to 800 MW delivered via three 300 MW substations, with up to eight three-story buildings totaling ~3.5M sq ft. First 300 MW substation targeted for October 2025. Backed by a county Special Use Permit docket; grid served by Dominion Energy/PJM. Offtaker/tenant is not publicly disclosed and later-phase MW timing is not fixed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.spotsylvania.va.us/800/SUP-Cases","date":"2024-01-01","title":"Special Use Permit (SUP) Cases","publisher":"Spotsylvania County, VA"},{"url":"https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/","date":"2024-01-01","title":"PowerHouse breaks ground on 800MW data center campus in Spotsylvania County","publisher":"DataCenterDynamics"},{"url":"https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia","date":"2023-01-01","title":"PowerHouse Data Centers closes on site of 800 MW campus in Spotsylvania","publisher":"PowerHouse Data Centers"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:23.992Z","updatedAt":"2026-08-19T00:15:57.480Z","capacityClaims":[{"id":"5fd36a42-c05b-44d7-a929-f524c8b5a7a3","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","series":"announced","valueGw":0.8,"asOf":"2024-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Up to 800 MW across three 300 MW substations, 8 buildings","createdAt":"2026-08-17T20:23:24.685Z"},{"id":"ce9a8c2a-e74b-4afc-9538-85a0ff13e78d","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","series":"under_construction","valueGw":0.3,"asOf":"2025-10-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"First 300 MW substation targeted live Oct 2025","createdAt":"2026-08-17T20:23:25.545Z"},{"id":"22e65a16-51f0-49e6-ad9f-3c6eab0e16be","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","series":"under_construction","valueGw":0.15,"asOf":"2024-01-23T00:00:00.000Z","sourceUrl":"https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"First substation under development, ~150 MW targeted by October 2025","createdAt":"2026-08-19T00:15:58.153Z"}],"location":{"name":"Spotsylvania County","slug":"spotsylvania-county-virginia"},"capacity_picture":{"announced_gw":0.8,"energized_gw":null,"announced_minus_energized_gw":0.8}},{"id":"a91b1386-c93a-4a94-b298-767521f80726","slug":"lancium-fort-stockton-clean-campus-texas","name":"Lancium Fort Stockton Clean Campus","aliases":["Fort Stockton Clean Campus","Lancium Pecos County"],"locationId":"ae3cd15c-df05-435c-8296-4bcacf2b37b6","lat":30.904473,"lng":-102.9177867,"landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":110,"totalBuildingSqft":null,"streetAddress":null,"notes":"Lancium's first Clean Campus in Pecos County, distinct from its Abilene campus. Designed for up to 325 MW of flexible/controllable load co-located with West Texas renewable oversupply; an initial ~25 MW stage energized and substations built out for expansion. ERCOT designated the site a Controllable Load Resource (Nov 2022) using Lancium Smart Response, a grid/ancillary-services signal. Current energized MW versus the 325 MW target and the AI-tenant mix are not fully disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","date":"2021-09-14","title":"Lancium Breaks Ground On First Clean Campus In Fort Stockton, Texas","publisher":"Lancium / PR Newswire"},{"url":"https://www.gem.wiki/Fort_Stockton_Clean_Campus","date":"2024-01-01","title":"Fort Stockton Clean Campus","publisher":"Global Energy Monitor"},{"url":"https://www.datacentermap.com/usa/texas/fort-stockton/fort-stockton-clean-campus/","date":"2024-01-01","title":"Fort Stockton Clean Campus Data Center (325 MW)","publisher":"Data Center Map"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:18.896Z","updatedAt":"2026-08-19T00:16:09.068Z","capacityClaims":[{"id":"736a8142-3992-4e1b-b15c-e1d8d11ff56e","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","series":"announced","valueGw":0.325,"asOf":"2021-09-15T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"325 MW full capacity. Original claimant Lancium own groundbreaking release 2021-09-15.","createdAt":"2026-08-17T20:23:19.598Z"},{"id":"7ea4c2b8-e6bb-49af-89d4-642abcbe58ba","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","series":"energized","valueGw":0.025,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.gem.wiki/Fort_Stockton_Clean_Campus","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"GEM describes a 25 MW operating Bitcoin mining / data processing center on grid-powered substation; full 325 MW expansion not confirmed as built.","createdAt":"2026-08-19T00:16:09.755Z"}],"location":{"name":"Fort Stockton","slug":"fort-stockton-texas"},"capacity_picture":{"announced_gw":0.325,"energized_gw":0.025,"announced_minus_energized_gw":0.3}},{"id":"385f1c8a-eb14-4741-8526-9cab49bac9cb","slug":"switch-citadel-storey-county-nevada","name":"Switch Citadel Campus (Tahoe Reno)","aliases":["Switch Tahoe Reno","The Citadel Campus","Tahoe Reno 1","Rob Roy's Switch"],"locationId":"2e54554b-1d7e-4e3d-b277-8097a82836c2","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":null,"servingUtility":null,"acreage":2000,"totalBuildingSqft":null,"streetAddress":null,"notes":"Switch's flagship colocation campus in the Tahoe Reno Industrial Center, Storey County. Tahoe Reno 1 (~130 MW) is operational; the campus is marketed at up to 650 MW at full build-out. Switch litigated a multi-year Nevada PUC proceeding to exit NV Energy's monopoly and buy renewable power directly. Switch went private (DigitalBridge/IFM, 2022) so it no longer files with the SEC; the 650 MW total is a company figure and current contracted/energized MW beyond the first building is not publicly itemized. Nevada is not in an RTO (WECC), so no ISO designation applies.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.switch.com/switch-tahoe-reno-data-center-now-open/","date":"2019-01-01","title":"Switch TAHOE RENO Now Open: Largest Data Center Campus in the World","publisher":"Switch"},{"url":"https://www.sec.gov/Archives/edgar/data/0001710583/000171058318000060/switchinvestorpresentati.htm","date":"2018-01-01","title":"Switch, Inc. Form 8-K investor presentation (FY2018)","publisher":"SEC EDGAR"},{"url":"https://www.datacenterknowledge.com/switches-routers/switch-launches-its-first-enormous-reno-data-center","date":"2017-01-01","title":"Switch Launches Its First Enormous Reno Data Center","publisher":"Data Center Knowledge"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:11.431Z","updatedAt":"2026-08-19T00:14:13.513Z","capacityClaims":[{"id":"6eed45d5-0c24-4e53-8407-a41b8df28d18","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","series":"announced","valueGw":0.65,"asOf":"2019-01-01T00:00:00.000Z","sourceUrl":"https://www.switch.com/switch-tahoe-reno-data-center-now-open/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Company-stated full build-out for the Citadel Campus","createdAt":"2026-08-17T20:23:12.111Z"},{"id":"9b402585-61f4-4449-be39-1534f4504c2b","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","series":"energized","valueGw":0.13,"asOf":"2019-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterknowledge.com/switches-routers/switch-launches-its-first-enormous-reno-data-center","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Tahoe Reno 1 building, ~130 MW / 1.3M sq ft","createdAt":"2026-08-17T20:23:12.945Z"}],"location":{"name":"McCarran (Tahoe Reno Industrial Center)","slug":"mccarran-tahoe-reno-industrial-center-nevada"},"capacity_picture":{"announced_gw":0.65,"energized_gw":0.13,"announced_minus_energized_gw":0.52}},{"id":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","slug":"vantage-lighthouse-port-washington-wisconsin","name":"Vantage Port Washington (Lighthouse) Campus","aliases":["Lighthouse campus","Stargate Wisconsin","Port Washington data center campus"],"locationId":"5621887a-bd46-46e9-a06a-80d67a0950c0","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":"Closed-loop liquid cooling system that uses minimal water; Vantage committing a minimum of $175M to regional water/wastewater upgrades (new water tower, upgraded mains, sewer). Stated goal water-positive via restoration projects.","servingUtility":null,"acreage":672,"totalBuildingSqft":null,"streetAddress":null,"notes":"Vantage's 'Lighthouse' campus on 672 acres (of 1,644 controlled) in Port Washington, Ozaukee County, announced as a Stargate site for OpenAI and Oracle. Plans describe four buildings totaling ~902 MW; Vantage is separately seeking a ~1.3 GW grid connection (up to 3.9 GW long term) via We Energies. Strong state/utility signals: Wisconsin DNR air permit for 45 diesel generators (25-MIN-094, issued June 12 2026), wetland/stormwater approvals, and a June 2026 PSC 'very large customer' collateral tariff filing. Final energized MW and timeline beyond the announced build are not fixed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://dnr.wisconsin.gov/topic/EIA/Portwashington.html","date":"2026-06-12","title":"Port Washington Data Center Proposal (environmental review, air permit 25-MIN-094)","publisher":"Wisconsin DNR"},{"url":"https://www.datacenterdynamics.com/en/news/vantage-seeking-13gw-grid-connection-for-data-center-in-port-washington-wisconsin/","date":"2025-10-01","title":"Vantage seeking 1.3GW grid connection for data center in Port Washington","publisher":"DataCenterDynamics"},{"url":"https://www.wispolitics.com/2026/utility-data-center-developers-want-tech-giant-exempted-from-billion-dollar-collateral-requirements/","date":"2026-06-01","title":"Utility, data center developers want tech giant exempted from collateral requirements","publisher":"WisPolitics"},{"url":"https://www.businesswire.com/news/home/20251022873578/en/","date":"2025-10-22","title":"OpenAI, Oracle and Vantage Announce Stargate Site in Wisconsin","publisher":"Business Wire"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:02.195Z","updatedAt":"2026-08-19T00:29:06.771Z","capacityClaims":[{"id":"e454abd4-3c27-4b61-ac68-f92093b7c395","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","series":"announced","valueGw":0.902,"asOf":"2025-10-22T00:00:00.000Z","sourceUrl":"https://www.businesswire.com/news/home/20251022873578/en/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Four buildings, ~902 MW across 2.5M sq ft, target 2028","createdAt":"2026-08-17T20:23:02.875Z"},{"id":"1b8def8e-4528-447c-bc44-0e115ab858f9","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","series":"contracted","valueGw":1.3,"asOf":"2025-10-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/vantage-seeking-13gw-grid-connection-for-data-center-in-port-washington-wisconsin/","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"~1.3 GW grid connection sought near-term via We Energies; up to 3.9 GW long term","createdAt":"2026-08-17T20:23:03.709Z"}],"location":{"name":"Port Washington","slug":"port-washington-wisconsin"},"capacity_picture":{"announced_gw":0.902,"energized_gw":null,"announced_minus_energized_gw":0.902}},{"id":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","slug":"core-scientific-coreweave-denton-texas","name":"Core Scientific / CoreWeave Denton HPC Campus","aliases":["Core Scientific Denton","CoreWeave Denton TX"],"locationId":"34b93cd9-89b8-461f-b2d7-913c3ce36337","lat":null,"lng":null,"landStatus":"brownfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Former Core Scientific bitcoin site being converted/expanded to host CoreWeave GPU HPC under a 12-year lease (two five-year renewal options). Feb 2025 amendment added ~70 MW, bringing full critical IT load at Denton to roughly 260 MW; part of CoreWeave's ~590 MW total across six Core Scientific sites in the FY2024 10-K. Powered by Denton Municipal Electric within ERCOT. Energized MW to date not separately disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000162828025008302/core-20241231.htm","date":"2025-02-26","title":"Core Scientific, Inc. Form 10-K FY2024","publisher":"SEC EDGAR"},{"url":"https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site","date":"2025-02-26","title":"Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site","publisher":"Core Scientific"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:56.339Z","updatedAt":"2026-08-17T20:26:23.715Z","capacityClaims":[{"id":"8809a917-717f-45be-8e9f-0ea0b1ec9a5a","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","series":"contracted","valueGw":0.26,"asOf":"2025-02-26T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/1839341/000162828025008302/core-20241231.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"~260 MW full critical IT load at Denton; latest amendment added 70 MW","createdAt":"2026-08-17T20:22:57.037Z"}],"location":{"name":"Denton","slug":"denton-texas"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","slug":"nebius-independence-missouri","name":"Nebius Independence AI Factory Campus","aliases":["Nebius Kansas City campus","Eastgate Commerce Center data center","Nebius Jackson County MO"],"locationId":"12a0c7a6-fed0-48c9-b052-8d945a6a1867","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"SPP","waterSourceNotes":"Municipal water via city Courtney Bend Water Treatment plant; closed-loop cooling; one-time fill ~1M gal per 200MW building; recurring ~400,000-640,000 gal/year (city FAQ).","servingUtility":null,"acreage":400,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nebius greenfield campus of up to ten buildings on ~400 acres in the Eastgate Commerce Center, planned to reach 1.2 GW. Independence City Council approved a Chapter 100 incentive plan and Taxable Industrial Development Revenue Bonds in March 2026; Nebius broke ground May 12, 2026. Grid served by municipal Independence Power & Light within SPP. Initial energized MW and phasing beyond the first tranche are not disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001513845/000110465926052948/nbis-20251231x20f.htm","date":"2026-03-31","title":"Nebius Group N.V. Form 20-F FY2025","publisher":"SEC EDGAR"},{"url":"https://www.datacenterdynamics.com/en/news/nebius-breaks-ground-on-400-acre-data-center-campus-in-independence-missouri/","date":"2026-05-12","title":"Nebius breaks ground on 400-acre data center campus in Independence, Missouri","publisher":"DataCenterDynamics"},{"url":"https://www.independencemo.gov/data-center-faqs","date":"2026-03-04","title":"Nebius Data Center FAQs","publisher":"City of Independence, MO"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:51.351Z","updatedAt":"2026-08-19T00:14:27.762Z","capacityClaims":[{"id":"72a6dfa2-ac30-4ff1-97ad-8ca713dc6cd5","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","series":"announced","valueGw":1.2,"asOf":"2026-03-04T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/nebius-breaks-ground-on-400-acre-data-center-campus-in-independence-missouri/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Up to 1.2 GW at full buildout; earlier reporting cited ~800 MW. City Council Chapter 100 + IDRB approval is a municipal-docket signal","createdAt":"2026-08-17T20:22:52.081Z"},{"id":"5765cd55-45f1-469e-adf0-a980a9f34499","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","series":"under_construction","valueGw":0.25,"asOf":"2027-06-01T00:00:00.000Z","sourceUrl":"https://www.govtech.com/artificial-intelligence/independence-mo-to-reopen-old-power-plant-for-ai-data-center","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"First-phase on-site power ~250 MW targeted ~Oct 2027, ramping to ~1.1 GW by 2029 (Blue Valley plant redevelopment).","createdAt":"2026-08-19T00:14:28.539Z"}],"location":{"name":"Independence","slug":"independence-missouri"},"capacity_picture":{"announced_gw":1.2,"energized_gw":null,"announced_minus_energized_gw":1.2}},{"id":"3ba39da0-2226-4e26-b5c6-9299214fd403","slug":"nebius-vineland-new-jersey","name":"Nebius Vineland AI Data Center","aliases":["Nebius New Jersey","Vineland NJ AI factory"],"locationId":"408bea1d-4b69-4c45-aa0a-6eca84e35b06","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nebius build-to-suit GPU campus in Cumberland County with up to 300 MW planned; first phase energized late 2025 and dedicated to Microsoft under a multi-year GPU capacity agreement. Powered largely behind-the-meter (Bloom Energy fuel cells plus on-site gas engines) to bypass the PJM interconnection queue. The FY2025 20-F confirms the Vineland site and Microsoft offtake but does not state per-site MW; exact energized MW not disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001513845/000110465926052948/nbis-20251231x20f.htm","date":"2026-03-31","title":"Nebius Group N.V. Form 20-F FY2025","publisher":"SEC EDGAR"},{"url":"https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey","date":"2025-09-01","title":"Nebius accelerates US expansion, adding up to 300 MW capacity at new data center in New Jersey","publisher":"Nebius"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:45.534Z","updatedAt":"2026-08-17T20:26:22.200Z","capacityClaims":[{"id":"34958e6c-742e-4821-9d2e-352c81e63ee0","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","series":"announced","valueGw":0.3,"asOf":"2025-09-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Up to 300 MW planned per company; 20-F confirms site + Microsoft offtake but not per-site MW","createdAt":"2026-08-17T20:22:46.219Z"}],"location":{"name":"Vineland","slug":"vineland-new-jersey"},"capacity_picture":{"announced_gw":0.3,"energized_gw":null,"announced_minus_energized_gw":0.3}},{"id":"a18cf961-c566-488b-8296-b839877c163f","slug":"cipher-black-pearl-wink-texas","name":"Black Pearl","aliases":["Black Pearl Facility","Cipher Black Pearl"],"locationId":"b34d55e4-9b54-4b54-8f5c-05d2bf39dab2","lat":31.751,"lng":-103.156,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Cipher Digital's wholly-owned 300 gross MW facility on ~75 acres in Winkler County near Wink, retrofitting from bitcoin mining (live since June 2025) to turnkey HPC under a 15-year AWS lease signed October 2025. 300 MW ERCOT interconnection is approved; phased delivery to Amazon expected to commence 2026 with initial rent commencement targeted October 1 2026. Delivered/energized HPC MW not stated; Cipher pursued a ~$2bn senior-secured notes offering to fund the build.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","date":"2026-02-27","title":"Cipher Digital Inc. Form 10-K FY2025","publisher":"SEC EDGAR"},{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998925000110/nov3_earningspressreleasex.htm","date":"2025-11-03","title":"Cipher Mining Business Update / AWS 15-year lease 8-K","publisher":"SEC EDGAR"},{"url":"https://www.datacenterdynamics.com/en/news/cipher-mining-plans-2bn-senior-secured-notes-offering-for-amazon-leased-black-pearl-data-center-site-in-texas/","date":"2026-03-01","title":"Cipher Mining plans $2bn senior secured notes for Amazon-leased Black Pearl","publisher":"DataCenterDynamics"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:40.248Z","updatedAt":"2026-08-17T20:26:21.378Z","capacityClaims":[{"id":"e0403e86-0274-4a18-96aa-e8c7a33c46e7","dataCenterId":"a18cf961-c566-488b-8296-b839877c163f","series":"contracted","valueGw":0.3,"asOf":"2025-12-31T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"Approximately 300 gross MW turnkey capacity under 15-year AWS lease","createdAt":"2026-08-17T20:22:41.079Z"}],"location":{"name":"Wink","slug":"wink-texas"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"b9d40f4b-f4e6-4690-893f-7951c9c32832","slug":"cipher-barber-lake-colorado-city-texas","name":"Barber Lake","aliases":["Barber Lake Facility","Cipher Barber Lake"],"locationId":"46d69a59-639b-415e-8e2a-ca62a8a82f36","lat":32.406,"lng":-100.864,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":250,"totalBuildingSqft":null,"streetAddress":null,"notes":"Cipher Digital's (formerly Cipher Mining) 300 gross MW HPC campus on 250 acres near Colorado City in Mitchell County, leased in full to Fluidstack (backstopped by Google). The 10-K frames capacity as 300 gross MW (244 MW Phase I + 56 MW Phase II); company disclosure separately cites critical IT load rising to 207 MW. Phase I delivery targeted Sept 30 2026, Phase II Jan 31 2027; the site has a fully energized substation and unrestricted 300 MW ERCOT interconnection. Exact energized MW as of the filing not stated.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","date":"2026-02-27","title":"Cipher Digital Inc. Form 10-K FY2025","publisher":"SEC EDGAR"},{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998925000110/ciphermining_businessupd.htm","date":"2025-11-20","title":"Amended and Restated Recognition Agreement (Cipher / Fluidstack / Google) 8-K","publisher":"SEC EDGAR"},{"url":"https://www.globenewswire.com/news-release/2025/09/25/3156107/0/en/Cipher-Mining-Signs-168-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html","date":"2025-09-25","title":"Cipher Mining Signs 168 MW, 10-Year AI Hosting Agreement with Fluidstack","publisher":"GlobeNewswire"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:32.955Z","updatedAt":"2026-08-19T01:34:25.191Z","capacityClaims":[{"id":"8997996f-86af-4298-8f7b-7417cfd879c6","dataCenterId":"b9d40f4b-f4e6-4690-893f-7951c9c32832","series":"contracted","valueGw":0.3,"asOf":"2025-12-31T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"300 gross MW to Fluidstack; 244 MW Phase I + 56 MW Phase II","createdAt":"2026-08-17T20:22:33.644Z"},{"id":"0922fd9d-50f1-468b-90a1-0154c1c586df","dataCenterId":"b9d40f4b-f4e6-4690-893f-7951c9c32832","series":"contracted","valueGw":0.207,"asOf":"2025-11-20T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/1819989/000181998925000110/ciphermining_businessupd.htm","sourceType":"earnings_call","evidenceTier":"reported","supersedesId":null,"note":"Critical IT load raised from 168 MW to 207 MW per company disclosure","createdAt":"2026-08-17T20:22:34.492Z"}],"location":{"name":"Colorado City","slug":"colorado-city-texas"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","slug":"terawulf-cayuga-lansing-new-york","name":"Cayuga Data Campus","aliases":["Cayuga","Lansing NY site","former Cayuga coal plant"],"locationId":"8a5f6efa-5c28-46e1-8510-c77cc35c3bc2","lat":42.5479,"lng":-76.5988,"landStatus":"former_industrial","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"NYISO","waterSourceNotes":"Existing industrial-scale water intake system at former coal plant; TeraWulf states it will NOT rely on Cayuga Lake to cool the data center","servingUtility":null,"acreage":183,"totalBuildingSqft":null,"streetAddress":null,"notes":"TeraWulf's second New York site, on the former Cayuga coal-plant property in Lansing, NY, under an 80-year lease granting exclusive rights to develop up to 400 MW (company cites ~320 critical IT MW upon permitting). Roughly 138 MW of power is expected ready-for-service in 2026. Site is early-stage: full tenant lineup, financing, and build schedule beyond the first tranche are not yet disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000092/wulf-20260331.htm","date":"2026-05-01","title":"TeraWulf Inc. Form 10-Q (period ended March 31, 2026)","publisher":"SEC EDGAR"},{"url":"https://www.globenewswire.com/news-release/2026/02/26/3246105/0/en/TeraWulf-Reports-Fourth-Quarter-and-Full-Year-2025-Results.html","date":"2026-02-26","title":"TeraWulf Reports Fourth Quarter and Full Year 2025 Results","publisher":"GlobeNewswire"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:27.323Z","updatedAt":"2026-08-19T00:28:56.391Z","capacityClaims":[{"id":"0b618837-3739-4c8f-817a-63b19d858574","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","series":"announced","valueGw":0.4,"asOf":"2026-03-31T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000092/wulf-20260331.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"80-year lease; exclusive rights to develop up to 400 MW (~320 critical IT MW cited)","createdAt":"2026-08-17T20:22:28.092Z"},{"id":"4c6d8c65-9878-4057-9d4a-2fa0dc741d4e","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","series":"under_construction","valueGw":0.138,"asOf":"2026-02-26T00:00:00.000Z","sourceUrl":"https://www.globenewswire.com/news-release/2026/02/26/3246105/0/en/TeraWulf-Reports-Fourth-Quarter-and-Full-Year-2025-Results.html","sourceType":"earnings_call","evidenceTier":"reported","supersedesId":null,"note":"~138 MW expected ready-for-service in 2026","createdAt":"2026-08-17T20:22:28.931Z"}],"location":{"name":"Lansing","slug":"lansing-new-york"},"capacity_picture":{"announced_gw":0.4,"energized_gw":null,"announced_minus_energized_gw":0.4}},{"id":"8447c201-da69-482d-b6f8-338ab1252f0b","slug":"terawulf-lake-mariner-barker-new-york","name":"Lake Mariner Data Campus","aliases":["Lake Mariner","Somerset NY campus","former Somerset coal plant"],"locationId":"37aa670c-26dd-4434-b2cd-ca786e1b2b15","lat":43.3287,"lng":-78.635,"landStatus":"former_industrial","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"NYISO","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"TeraWulf's flagship campus on the former Somerset coal-plant site in Barker, NY. Per the Q1 FY2026 10-Q (as of March 31, 2026) the site operated 145 MW of legacy bitcoin mining plus 60 MW of critical IT HPC, with La Lupa and Akela SPVs together representing 438 MW of contracted critical IT HPC. Company guides to ~500 MW gross near-term and potential ~750 MW subject to NYISO approvals. Anchor tenants are Fluidstack (~360 MW incl. the 160 MW CB-5 building, backstopped by Google) and Core42. Timing of remaining HPC energization extends through 2026.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000092/wulf-20260331.htm","date":"2026-05-01","title":"TeraWulf Inc. Form 10-Q (period ended March 31, 2026)","publisher":"SEC EDGAR"},{"url":"https://investors.terawulf.com/news-events/press-releases/detail/112/terawulf-signs-200-mw-10-year-ai-hosting-agreements-with","date":"2025-08-14","title":"TeraWulf Signs 200+ MW, 10-Year AI Hosting Agreements with Fluidstack","publisher":"TeraWulf (IR)"},{"url":"https://investors.terawulf.com/news-events/press-releases/detail/114/terawulf-announces-fluidstack-expansion-with-160-mw-cb-5","date":"2025-08-27","title":"TeraWulf Announces Fluidstack Expansion with 160 MW CB-5 Lease at Lake Mariner","publisher":"TeraWulf (IR)"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:17.823Z","updatedAt":"2026-08-17T20:26:19.036Z","capacityClaims":[{"id":"b574adb9-0b38-4f65-b7ab-d9ee2cfc4f91","dataCenterId":"8447c201-da69-482d-b6f8-338ab1252f0b","series":"contracted","valueGw":0.438,"asOf":"2026-03-31T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000092/wulf-20260331.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"La Lupa + Akela = 438 MW contracted critical IT HPC","createdAt":"2026-08-17T20:22:18.520Z"},{"id":"e076fe89-c3e6-4082-846a-030f2cdd02c3","dataCenterId":"8447c201-da69-482d-b6f8-338ab1252f0b","series":"energized","valueGw":0.06,"asOf":"2026-03-31T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000092/wulf-20260331.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"60 MW critical IT HPC operating (plus 145 MW legacy bitcoin mining)","createdAt":"2026-08-17T20:22:19.365Z"},{"id":"735e875c-50bd-4319-bc83-a1c4c81d5aac","dataCenterId":"8447c201-da69-482d-b6f8-338ab1252f0b","series":"announced","valueGw":0.75,"asOf":"2026-03-31T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000092/wulf-20260331.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"~500 MW gross near-term, potential expansion to ~750 MW subject to NYISO","createdAt":"2026-08-17T20:22:20.210Z"},{"id":"5aeb0178-3f17-44db-8c30-88548d4207be","dataCenterId":"8447c201-da69-482d-b6f8-338ab1252f0b","series":"energized","valueGw":0.081,"asOf":"2026-06-30T00:00:00.000Z","sourceUrl":"https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"81 MW of revenue-generating critical IT HPC capacity operational as of Q2 period end (June 30, 2026)","createdAt":"2026-08-19T00:28:51.786Z"},{"id":"e7b390e4-bbea-4985-bd59-ad2c7dc01013","dataCenterId":"8447c201-da69-482d-b6f8-338ab1252f0b","series":"energized","valueGw":0.102,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"Rose to 102 MW online in early July 2026 upon completion of building CB-3, which triggered $600M of Google credit support for the Fluidstack lease","createdAt":"2026-08-19T00:28:52.653Z"},{"id":"8f67b310-45a6-44b4-99fd-dcc2c23316de","dataCenterId":"8447c201-da69-482d-b6f8-338ab1252f0b","series":"under_construction","valueGw":0.336,"asOf":"2026-06-30T00:00:00.000Z","sourceUrl":"https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"336 MW under construction across CB-4 (phased delivery H2 2026) and CB-5 (phased delivery from early 2027)","createdAt":"2026-08-19T00:28:53.486Z"}],"location":{"name":"Barker","slug":"barker-new-york"},"capacity_picture":{"announced_gw":0.75,"energized_gw":0.102,"announced_minus_energized_gw":0.648}},{"id":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","slug":"applied-digital-harwood-north-dakota","name":"Polaris Forge 2 (Harwood)","aliases":["Polaris Forge 2","Harwood ND campus","Fargo-area AI factory"],"locationId":"0303bddb-9366-4f58-9353-8b3a73500961","lat":46.9944,"lng":-96.8003,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":"Applied Digital proprietary closed-loop / waterless cooling design.","servingUtility":null,"acreage":900,"totalBuildingSqft":null,"streetAddress":null,"notes":"~$3B, 280 MW AI campus near Harwood (north of Fargo) on ~900 acres, broke ground Sept 2025, full initial capacity targeted early 2027. 200 MW of critical IT is contracted to an unnamed U.S. investment-grade hyperscaler, which holds a right of first refusal on an additional 800 MW (1 GW total build-out). Power via Minnkota Power Cooperative (MISO); Applied Digital is funding ~$75M in substation/line upgrades that Minnkota will own. Tenant identity and financing draws partly undisclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000048/apld-20260531.htm","date":"2026-07-29","title":"Applied Digital Corp. Form 10-K (FY ended May 31, 2026)","publisher":"SEC EDGAR"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/132/applied-digital-announces-5-billion-ai-factory-lease-with","date":"2025-09-01","title":"Applied Digital Announces $5 Billion AI Factory Lease at Polaris Forge 2","publisher":"Applied Digital (IR)"},{"url":"https://northdakotamonitor.com/2026/03/23/data-center-developer-looks-west-backs-power-upgrades-near-fargo/","date":"2026-03-23","title":"Data center developer looks west, backs power upgrades near Fargo","publisher":"North Dakota Monitor"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:09.184Z","updatedAt":"2026-08-19T01:34:21.188Z","capacityClaims":[{"id":"dedd1777-55b9-4b39-868c-f9cce36c1ec5","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","series":"announced","valueGw":0.28,"asOf":"2025-08-18T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"280 MW initial design, scalable to 1 GW","createdAt":"2026-08-17T20:22:09.867Z"},{"id":"2092de0a-dc01-4673-b78b-91c98ced8eab","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","series":"contracted","valueGw":0.2,"asOf":"2025-09-01T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/132/applied-digital-announces-5-billion-ai-factory-lease-with","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"200 MW critical IT contracted; hyperscaler holds ROFR on +800 MW","createdAt":"2026-08-17T20:22:10.711Z"},{"id":"0fa410ef-68d9-4494-94f1-6426efb0c776","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","series":"under_construction","valueGw":0.28,"asOf":"2026-05-31T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000048/apld-20260531.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"Under construction; part of APLD's ~1.5 GW operating/under-construction disclosure","createdAt":"2026-08-17T20:22:11.560Z"}],"location":{"name":"Harwood","slug":"harwood-north-dakota"},"capacity_picture":{"announced_gw":0.28,"energized_gw":null,"announced_minus_energized_gw":0.28}},{"id":"baa8d3fd-aa92-4697-8df3-166687b95c75","slug":"applied-digital-ellendale-north-dakota","name":"Polaris Forge 1 (Ellendale)","aliases":["Polaris Forge 1","Ellendale ND campus","APLD Ellendale"],"locationId":"592df261-d26d-46e2-8d90-68fd198ea4c8","lat":46.0011,"lng":-98.5262,"landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":"Applied Digital proprietary closed-loop / waterless cooling design.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Applied Digital's flagship AI campus leased to CoreWeave, engineered to scale to ~1 GW. Per the FY2026 10-K, 400 MW of critical IT load is contracted under long-term leases; the first ~100 MW building energized Oct 2025 and a second building was delivered July 2026, bringing live capacity to ~175 MW. Grid interconnection via Otter Tail Power in the MISO footprint. Exact per-building energization schedule beyond 175 MW is not disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000048/apld-20260531.htm","date":"2026-07-29","title":"Applied Digital Corp. Form 10-K (FY ended May 31, 2026)","publisher":"SEC EDGAR"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with","date":"2025-08-30","title":"Applied Digital Finalizes Additional 150MW Lease with CoreWeave in North Dakota","publisher":"Applied Digital (IR)"},{"url":"https://www.globenewswire.com/news-release/2026/07/01/3320913/0/en/Applied-Digital-Delivers-Second-Building-at-Polaris-Forge-1.html","date":"2026-07-01","title":"Applied Digital Delivers Second Building at Polaris Forge 1","publisher":"GlobeNewswire"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:00.833Z","updatedAt":"2026-08-19T01:34:12.353Z","capacityClaims":[{"id":"e1976ae7-4f4e-4e61-8712-f53a71c19faa","dataCenterId":"baa8d3fd-aa92-4697-8df3-166687b95c75","series":"contracted","valueGw":0.4,"asOf":"2026-05-31T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000048/apld-20260531.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"400 MW critical IT contracted to CoreWeave across three 15-year leases (part of 1,410 MW / $36.2B FY2026 backlog)","createdAt":"2026-08-17T20:22:01.523Z"},{"id":"3f2dc81d-df34-4b5b-966d-04194d443d94","dataCenterId":"baa8d3fd-aa92-4697-8df3-166687b95c75","series":"energized","valueGw":0.175,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://www.globenewswire.com/news-release/2026/07/01/3320913/0/en/Applied-Digital-Delivers-Second-Building-at-Polaris-Forge-1.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"175 MW live after second building delivery","createdAt":"2026-08-17T20:22:02.402Z"},{"id":"b5d01acc-b30d-4429-b745-97b2ee0f894c","dataCenterId":"baa8d3fd-aa92-4697-8df3-166687b95c75","series":"announced","valueGw":1,"asOf":"2025-08-30T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Campus engineered to scale up to 1 GW","createdAt":"2026-08-17T20:22:03.245Z"},{"id":"fb0b8372-2bb6-4759-9610-fe48a8c4b88f","dataCenterId":"baa8d3fd-aa92-4697-8df3-166687b95c75","series":"energized","valueGw":0.1,"asOf":"2025-11-24T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/137/applied-digital-completes-phase-ii-ready-for-service-at","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"First 100 MW building fully energized and operating at full 100 MW critical IT load (Phase II ready-for-service).","createdAt":"2026-08-19T01:34:13.033Z"}],"location":{"name":"Ellendale","slug":"ellendale-north-dakota"},"capacity_picture":{"announced_gw":1,"energized_gw":0.1,"announced_minus_energized_gw":0.9}},{"id":"1b2f6d79-9113-487a-aa09-6819682ce056","slug":"pioneer-project-cardinal-yorkville-illinois","name":"Project Cardinal Data Center Campus — Yorkville","aliases":["Project Cardinal Yorkville"],"locationId":"0e398db8-90fd-41ba-b63e-5ab8eac24004","lat":41.64,"lng":-88.47,"landStatus":"greenfield","lifecycleState":"permitted","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":1037,"totalBuildingSqft":null,"streetAddress":null,"notes":"Pioneer Development, LLC campus on ~1,037 acres (20 parcels) off Eldamain Rd along a ComEd line, Kendall County; ~14 two-story buildings, ~17M sq ft, two on-site substations. Yorkville PUD approved Nov 10, 2025 and final agreements by City Council Mar 11, 2026 (city case PZC 2025-08, $51M development agreement). Reporting cites ~1.8 GW; the named tenant, IT-vs-total split, and PJM queue position are unknown; coordinates approximate.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne","date":"2025-11-10","title":"Project Cardinal Data Center Campus (case PZC 2025-08)","publisher":"City of Yorkville, IL"},{"url":"https://www.shawlocal.com/kendall-county-now/2026/03/12/","date":"2026-03-12","title":"Yorkville data center approval comes after nearly 6-hour meeting","publisher":"Shaw Local"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:55.648Z","updatedAt":"2026-08-19T00:28:48.588Z","capacityClaims":[{"id":"7a7c3710-9056-467b-a5bf-0de93a25c94a","dataCenterId":"1b2f6d79-9113-487a-aa09-6819682ce056","series":"announced","valueGw":1.8,"asOf":"2026-03-11T00:00:00.000Z","sourceUrl":"https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"~1.8 GW per Yorkville reporting; IT vs total unclear","createdAt":"2026-08-17T20:21:56.327Z"}],"location":{"name":"Yorkville","slug":"yorkville-illinois"},"capacity_picture":{"announced_gw":1.8,"energized_gw":null,"announced_minus_energized_gw":1.8}},{"id":"e8b1e61f-5ea1-46f1-8667-a4bde94f2409","slug":"amazon-gwu-ashburn-loudoun-virginia","name":"Amazon 'Bridgefield' GWU Ashburn Campus","aliases":["Bridgefield Tech Center","Amazon GWU VSTC"],"locationId":"fe814bbb-94dd-4941-b2db-8750fafbfab7","lat":39.02,"lng":-77.46,"landStatus":"brownfield","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":111,"totalBuildingSqft":null,"streetAddress":null,"notes":"Amazon Data Services plan to redevelop the former George Washington University Virginia Science & Technology Campus in Ashburn, Loudoun County (Route 28 Tax District): 111-122 acres, over 800,000 sq ft across four two-story buildings. Amazon paid GWU $427.3M (closed Mar 2, 2026) and filed a concept site plan Jul 28, 2026 seeking by-right approval, with a county decision targeted Sep 15, 2026 amid documented opposition. Planned MW, docket number, and construction timeline unknown; coordinates approximate.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://virginiabusiness.com/amazon-data-centers-gwu-ashburn/","date":"2026-08-01","title":"Amazon data center campus plan for Ashburn hits Loudoun opposition","publisher":"Virginia Business"},{"url":"https://gwhatchet.com/2026/08/03/amazon-proposes-building-over-800000-square-feet-of-data-centers-on-gws-virginia-campus/","date":"2026-08-03","title":"Amazon proposes building over 800,000 square feet of data centers on GW's Virginia campus","publisher":"GW Hatchet"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:51.807Z","updatedAt":"2026-08-19T00:15:14.659Z","capacityClaims":[],"location":{"name":"Ashburn","slug":"ashburn-virginia"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"acd089aa-28ba-4d61-a840-e48de31172eb","slug":"prince-william-digital-gateway-virginia","name":"Prince William Digital Gateway (QTS + Compass)","aliases":["PW Digital Gateway","Pageland Lane data centers"],"locationId":"d2851311-72b6-4b51-b436-6e707df03265","lat":38.85,"lng":-77.58,"landStatus":"greenfield","lifecycleState":"cancelled","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":2100,"totalBuildingSqft":null,"streetAddress":null,"notes":"~2,100-acre (rezoning ~1,790 acres), ~23M sq ft, ~37-building campus along Pageland Lane near Manassas National Battlefield, Prince William County, jointly by QTS (GW Acquisition Co./Blackstone) and Compass (H&H Capital/Brookfield). Cancelled: circuit court voided the rezoning (Aug 2025) over defective public notice, Court of Appeals affirmed Mar 2026, Board declined to appeal, and QTS withdrew final petitions Jul 2, 2026. Compass portion up to 1.7 GW; QTS ~60% of that; exact combined MW and case numbers not surfaced; coordinates approximate.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://virginiabusiness.com/prince-william-digital-gateway-data-center-project-officially-dies/","date":"2026-07-15","title":"Prince William Digital Gateway data center project officially dies","publisher":"Virginia Business"},{"url":"https://www.datacenterdynamics.com/en/news/judge-rules-zoning-for-pw-digital-gateway-data-center-campus-in-virginia-voided/","date":"2025-08-01","title":"Judge rules zoning for PW Digital Gateway data center campus in Virginia voided","publisher":"DatacenterDynamics"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:46.361Z","updatedAt":"2026-08-19T00:28:45.579Z","capacityClaims":[{"id":"54f79f02-e13c-4818-8c73-0d8c3264e89b","dataCenterId":"acd089aa-28ba-4d61-a840-e48de31172eb","series":"announced","valueGw":1.7,"asOf":"2025-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterfrontier.com/site-selection/article/33016383/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Compass portion up to 1.7 GW; QTS said ~60% of that additional; project cancelled 2026","createdAt":"2026-08-17T20:21:47.068Z"}],"location":{"name":"Gainesville","slug":"gainesville-virginia"},"capacity_picture":{"announced_gw":1.7,"energized_gw":null,"announced_minus_energized_gw":1.7}},{"id":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","slug":"stack-stafford-technology-campus-virginia","name":"STACK Stafford Technology Campus","aliases":["Stafford Technology Campus"],"locationId":"f2bc33ef-c079-40aa-80da-8badd64e078e","lat":38.42,"lng":-77.42,"landStatus":"greenfield","lifecycleState":"permitted","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":"Reclaimed water system for industrial cooling; project funds water/sewer upgrades eliminating $58M from Stafford County's Capital Improvement Program","servingUtility":null,"acreage":500,"totalBuildingSqft":null,"streetAddress":null,"notes":"STACK Infrastructure campus on both sides of Eskimo Hill Rd (Falmouth District), Stafford County; ~500 acres, 19-23 buildings, ~5.8M sq ft, stated 1.1 GW drawing six committed 300 MW Dominion substations. Board of Supervisors approved rezoning (ag to heavy industrial) plus comp-plan change 6-1 on 2024-09-17; listed 'Approved' on the county's official data-center tracker. Formal case number, critical-IT MW vs total, and air-permit status unknown; coordinates approximate.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/","date":"2025-01-16","title":"STACK Infrastructure Announces Landmark 1+GW Stafford Technology Campus in Northern Virginia","publisher":"STACK Infrastructure"},{"url":"https://staffordcountyva.gov/government/departments_p-z/planning_and_zoning/data_centers/index.php","date":"2024-09-17","title":"Data Centers (official county tracker)","publisher":"Stafford County, VA"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:41.715Z","updatedAt":"2026-08-19T00:28:42.685Z","capacityClaims":[{"id":"11d09449-381c-41b7-ad96-f12179b5f069","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","series":"announced","valueGw":1.1,"asOf":"2025-01-16T00:00:00.000Z","sourceUrl":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"stated 1.1 GW; six committed 300 MW Dominion substations = 1.8 GW substation capacity; IT load not separated","createdAt":"2026-08-17T20:21:42.403Z"}],"location":{"name":"Stafford","slug":"stafford-virginia"},"capacity_picture":{"announced_gw":1.1,"energized_gw":null,"announced_minus_energized_gw":1.1}},{"id":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","slug":"meta-social-circle-newton-georgia","name":"Meta Social Circle / Stanton Springs Data Center","aliases":["Morning Hornet LLC","Meta Stanton Springs","Meta Newton"],"locationId":"e3578ee4-7617-4ce3-bb63-9365c8b265cd","lat":33.66,"lng":-83.72,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":"Served within Southern Company / Walton EMC territory (Southern Company is the balancing authority; not an RTO/ISO).","servingUtility":null,"acreage":628,"totalBuildingSqft":null,"streetAddress":null,"notes":"Meta campus (owning entity 'Morning Hornet, LLC') near Stanton Springs, Walton County, adjacent to Newton County; operational with active expansion. Interconnection trackers list 250+ MW; some trackers cite ~435 MW for the expanded footprint. Social Circle officials advanced a second data-center rezoning. Whether the site straddles the Walton/Newton line, the specific EPD air-permit ID, and confirmed final MW (250+ vs 435) are unknown.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.interconnection.fyi/data-center/project/meta-3274a316","date":"2023-01-01","title":"Meta data center — Walton County (interconnection tracker)","publisher":"interconnection.fyi"},{"url":"https://news.monroelocal.org/social-circle-officials-clear-way-for-second-data-center/","date":"2025-01-01","title":"Social Circle officials clear way for second data center","publisher":"Monroe Local"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:36.953Z","updatedAt":"2026-08-19T00:14:20.168Z","capacityClaims":[{"id":"7c032dd0-6baf-4000-ad9f-4ed193e42db9","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","series":"announced","valueGw":0.25,"asOf":"2023-06-01T00:00:00.000Z","sourceUrl":"https://www.interconnection.fyi/data-center/project/meta-3274a316","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Interconnection tracker lists 250+ MW; some trackers cite ~435 MW for the expansion. Multi-phase campus ~2M sq ft. Meta operates as Morning Hornet LLC (formerly Baymare LLC).","createdAt":"2026-08-19T00:14:20.876Z"}],"location":{"name":"Social Circle","slug":"social-circle-georgia"},"capacity_picture":{"announced_gw":0.25,"energized_gw":null,"announced_minus_energized_gw":0.25}},{"id":"ee24a4c1-dad9-4591-8bc2-dadbd2f88ba7","slug":"microsoft-fairwater-atlanta-fayetteville-georgia","name":"Microsoft Fairwater Atlanta / QTS Fayetteville Campus","aliases":["QTS Fayetteville","Project Excalibur","Fairwater Atlanta"],"locationId":"53fd332f-cca4-4553-b4ef-068a63bd1b83","lat":33.45,"lng":-84.55,"landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":"Closed-loop liquid cooling consuming almost zero water; initial fill equivalent to what 20 homes use in a year, no evaporation, ~6-year loop life (Microsoft). Grid-only, no on-site generation and no UPS/gen-sets.","servingUtility":null,"acreage":615,"totalBuildingSqft":null,"streetAddress":null,"notes":"Microsoft Fairwater buildings on a QTS-developed campus at 1435 Hwy 54 W, Fayette County (distinct from the excluded Fairwater Wisconsin). Fairwater 1 (340 MW IT) operational Oct 2025; Fairwater 2 (300+ MW IT) online; QTS ultimate campus ~1,500 MW across 13 buildings. Georgia Power's 2025 IRP repeatedly sizes the load 'just under 1,500 MW' and details a new Ashley Park 500/230-kV substation; grid-only, no on-site generators. Tenant split across all 13 buildings and final energized capacity unknown.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://measuredai.substack.com/p/microsoft-fairwater-atlanta-data-center","date":"2026-01-01","title":"Microsoft Fairwater Atlanta: A Grid-Only Gigawatt AI Data Center","publisher":"Measured AI"},{"url":"https://www.asbn.com/articles/qts-plans-worlds-largest-data-center-campus-in-fayetteville/","date":"2025-01-01","title":"QTS Plans World's Largest Data Center Campus in Fayetteville","publisher":"Atlanta Small Business Network"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:30.635Z","updatedAt":"2026-08-19T00:15:03.697Z","capacityClaims":[{"id":"e5df5385-3a36-4402-954d-2f46ff044a76","dataCenterId":"ee24a4c1-dad9-4591-8bc2-dadbd2f88ba7","series":"energized","valueGw":0.34,"asOf":"2025-10-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/microsoft-fairwater-atlanta-data-center","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Fairwater 1 IT load, operational Oct 2025","createdAt":"2026-08-17T20:21:31.374Z"},{"id":"1b203194-800c-46d4-9d7e-a2bee104f0d7","dataCenterId":"ee24a4c1-dad9-4591-8bc2-dadbd2f88ba7","series":"announced","valueGw":1.5,"asOf":"2025-01-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/microsoft-fairwater-atlanta-data-center","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"QTS full campus ~1,500 MW per Georgia Power 2025 IRP","createdAt":"2026-08-17T20:21:32.221Z"}],"location":{"name":"Fayetteville","slug":"fayetteville-georgia"},"capacity_picture":{"announced_gw":1.5,"energized_gw":0.34,"announced_minus_energized_gw":1.16}},{"id":"862aafbc-2b12-4754-90c0-23933b2ab1f4","slug":"meta-beaver-dam-wisconsin","name":"Meta Beaver Dam Data Center","aliases":[],"locationId":"2ad071ab-dee7-4bf0-9edf-ff5006376498","lat":43.43,"lng":-88.79,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":"Dry cooling; Meta states no water demand for cooling once operational, with water restoration returning 100% of consumed water to local watersheds.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Meta $1B+ campus (>700,000 sq ft) in Alliant Energy's Beaver Dam Commerce Park, Dodge County; up to 220 MW per newly unredacted portions of an Alliant service contract. PSC of Wisconsin approved a one-off 10-year Alliant-Meta service contract (~May 2026) while criticizing Meta's 'black box' transparency; MISO awarded the serving line to ATC. Building count and final energized MW not confirmed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://wisconsinwatch.org/2026/05/psc-approves-alliant-meta-data-center-power-deal-while-criticizing-black-box-approach/","date":"2026-05-07","title":"PSC approves Alliant-Meta data center power deal while criticizing 'black box' approach","publisher":"Wisconsin Watch"},{"url":"https://www.wisbusiness.com/2026/new-details-revealed-for-metas-beaver-dam-data-center/","date":"2026-05-01","title":"New details revealed for Meta's Beaver Dam data center","publisher":"WisBusiness"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:25.877Z","updatedAt":"2026-08-19T01:34:06.937Z","capacityClaims":[{"id":"a0d2f9ae-2f7a-48b2-8412-f59aaf239e30","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","series":"contracted","valueGw":0.22,"asOf":"2026-05-07T00:00:00.000Z","sourceUrl":"https://www.wisbusiness.com/2026/new-details-revealed-for-metas-beaver-dam-data-center/","sourceType":"utility_filing","evidenceTier":"verified","supersedesId":null,"note":"up to 220 MW per unredacted Alliant service contract","createdAt":"2026-08-17T20:21:26.621Z"},{"id":"a710f2c8-cfb6-4e69-a119-85a29d9e600e","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","series":"announced","valueGw":0.22,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.wpr.org/news/wisconsin-regulators-approve-rates-for-metas-beaver-dam-data-center-with-sharp-criticism","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Up to 220 MW peak per newly unredacted portions of Alliant Energy service contract; PSC of Wisconsin approved the rates.","createdAt":"2026-08-19T01:34:07.857Z"}],"location":{"name":"Beaver Dam","slug":"beaver-dam-wisconsin"},"capacity_picture":{"announced_gw":0.22,"energized_gw":null,"announced_minus_energized_gw":0.22}},{"id":"1029c4e4-3281-4fed-8d55-78c6e853c664","slug":"umich-lanl-ypsilanti-michigan","name":"University of Michigan / Los Alamos National Lab Computing Facility","aliases":["U-M Huron River computing facility"],"locationId":"34a93c9d-2a5c-465b-bacd-2bca6a5042ef","lat":42.21,"lng":-83.51,"landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":null,"servingUtility":null,"acreage":144,"totalBuildingSqft":null,"streetAddress":null,"notes":"University of Michigan (owner) and Los Alamos National Lab (DOE) $1.2B, 100 MW computing facility on ~144 acres off Textile Rd near the Ford Rawsonville plant, land confirmed Aug 2026, target ~2030. Township passed opposition/moratorium resolutions and YCUA imposed a 12-month water/sewer moratorium, but U-M is zoning-exempt as a public university. MISO queue and EGLE air permit not located.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://planetdetroit.org/2026/08/u-m-confirms-ypsilanti-data-center/","date":"2026-08-01","title":"U-M confirms Huron River site for $1.2 billion computing facility","publisher":"Planet Detroit"},{"url":"https://ypsitownship.org/government/boards___commissions/board_of_trustees/data_center_information.php","date":"2026-04-22","title":"Ypsilanti Township Data Center Information","publisher":"Ypsilanti Township"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:21.010Z","updatedAt":"2026-08-19T00:29:52.012Z","capacityClaims":[{"id":"871c7a2f-648b-42ca-b402-71aa243cd557","dataCenterId":"1029c4e4-3281-4fed-8d55-78c6e853c664","series":"announced","valueGw":0.1,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://planetdetroit.org/2026/08/u-m-confirms-ypsilanti-data-center/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"100 MW; $1.2B","createdAt":"2026-08-17T20:21:21.774Z"}],"location":{"name":"Ypsilanti Township","slug":"ypsilanti-township-michigan"},"capacity_picture":{"announced_gw":0.1,"energized_gw":null,"announced_minus_energized_gw":0.1}},{"id":"3855ca30-2f90-46ea-9f56-34907bfdf94c","slug":"google-dte-van-buren-michigan","name":"Google / DTE 'Project Cannoli' — Van Buren Township","aliases":["Project Cannoli","Van Buren Township data center"],"locationId":"b0c1aa40-cd4f-47bb-9a6b-f69b1cb2f30d","lat":42.22,"lng":-83.48,"landStatus":"greenfield","lifecycleState":"permitted","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":null,"servingUtility":null,"acreage":280,"totalBuildingSqft":null,"streetAddress":null,"notes":"Panattoni-developed ~280-acre site ('Project Cannoli') near I-94/Haggerty Rd with Google confirmed as end user (Mar 2026); ~1 GW data-center IT load, served by DTE building ~2.7 GW of new resources (1.6 GW renewable + 450 MW storage, no new fossil plants). DTE's special contract filed with MPSC Mar 2026 was forced into a contested case by the state AG; exact MPSC U-docket number and EGLE air permit status not surfaced.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.detroitnews.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007/","date":"2026-03-17","title":"Google weighs joining Van Buren Township data center project, DTE Energy","publisher":"The Detroit News"},{"url":"https://planetdetroit.org/2026/05/google-data-center-substation/","date":"2026-05-14","title":"Van Buren Township OKs Google data center substation","publisher":"Planet Detroit"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:14.642Z","updatedAt":"2026-08-19T01:33:54.904Z","capacityClaims":[{"id":"4d2cb263-3212-488c-8cf9-79bbdbef921b","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","series":"announced","valueGw":1,"asOf":"2026-03-17T00:00:00.000Z","sourceUrl":"https://www.detroitnews.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007/","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"~1 GW data-center IT load per DTE special-contract reporting","createdAt":"2026-08-17T20:21:15.326Z"}],"location":{"name":"Van Buren Township","slug":"van-buren-township-michigan"},"capacity_picture":{"announced_gw":1,"energized_gw":null,"announced_minus_energized_gw":1}},{"id":"6ee5bee5-33db-4414-bd34-d8a403194cad","slug":"google-fort-wayne-indiana","name":"Google Fort Wayne / New Haven Data Center","aliases":["Google New Haven data center"],"locationId":"4fa033bf-749d-46f8-9e36-b594bd3b94f6","lat":41.05,"lng":-85.05,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":892,"totalBuildingSqft":null,"streetAddress":null,"notes":"Google ~$2B campus on an 892-acre site near New Haven, Allen County, up to 12 buildings long-range; Phase 3 (three buildings, 867,435 sq ft) planned to start early 2027. IDEM air permit approved with 36 diesel units (community cites up to 179 in long-range plans). Total MW/IT load is not published by Google; grid operator for I&M/AEP service area not fully confirmed; coordinates approximate.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.wane.com/news/local-news/google-data-center-gets-idem-approval-air-qualiy/","date":"2024-07-01","title":"Google data center gets IDEM approval, air quality","publisher":"WANE 15"},{"url":"https://www.21alivenews.com/2026/03/17/google-requests-permit-third-phase-fort-wayne-data-center/","date":"2026-03-17","title":"Google requests permit for third phase of Fort Wayne data center","publisher":"21Alive News"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:11.487Z","updatedAt":"2026-08-19T00:15:42.865Z","capacityClaims":[],"location":{"name":"Fort Wayne","slug":"fort-wayne-indiana"},"capacity_picture":{"announced_gw":null,"energized_gw":null,"announced_minus_energized_gw":null}},{"id":"aca9e9b9-db6a-469a-926b-79c18512452f","slug":"meta-lebanon-leap-indiana","name":"Meta Lebanon Data Center (LEAP District)","aliases":["Hello Lebanon","Meta LEAP District data center"],"locationId":"b3ca5508-3241-4c38-be83-a96e30584053","lat":40.02,"lng":-86.47,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Meta $10B+ campus in the LEAP Innovation and Research District, Boone County, targeting ~1 GW across 13 buildings (~4M sq ft) on 1,500 acres; groundbreaking Feb 2026. Served by Boone County REMC with 400+ MW of new Meta-backed renewables. MISO queue position and any IURC special-contract docket not located; coordinates approximate.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/","date":"2026-02-11","title":"Meta Makes Lebanon Data Center Announcement Official","publisher":"City of Lebanon, Indiana"},{"url":"https://indianacapitalchronicle.com/2026/02/11/details-on-long-expected-meta-data-center-campus-unveiled/","date":"2026-02-11","title":"Details on long-expected Meta data center campus unveiled","publisher":"Indiana Capital Chronicle"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:06.684Z","updatedAt":"2026-08-17T20:26:29.143Z","capacityClaims":[{"id":"aba96197-d866-4a32-9664-a3cbf510ba79","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","series":"announced","valueGw":1,"asOf":"2026-02-11T00:00:00.000Z","sourceUrl":"https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"1 GW design target; phasing-to-MW not disclosed","createdAt":"2026-08-17T20:21:07.374Z"}],"location":{"name":"Lebanon","slug":"lebanon-indiana"},"capacity_picture":{"announced_gw":1,"energized_gw":null,"announced_minus_energized_gw":1}},{"id":"6f07a860-1b32-475f-b4ff-bc63bb17ca86","slug":"cologix-johnstown-ohio","name":"Cologix Johnstown Campus","aliases":["Cologix Central Ohio campus"],"locationId":"c0190cca-0f32-468c-a629-120107163c3e","lat":40.15,"lng":-82.68,"landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":154,"totalBuildingSqft":null,"streetAddress":null,"notes":"Cologix AI-ready campus in Johnstown, Licking County, planned for up to 800 MW across eight buildings (~2.0M sq ft) on 154 acres bought from Johnstown Land Company (a New Albany Company affiliate) for ~$45M. IT-load MW, on-site generation plans, and any PJM queue ID are not disclosed; coordinates town-level approximate.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/","date":"2024-11-01","title":"Cologix Expands Central Ohio Footprint with Land Acquisition for New AI-Ready 800MW Data Center Campus","publisher":"Cologix"},{"url":"https://www.datacenterdynamics.com/en/news/cologix-invests-7bn-in-licking-county-ohio-data-center-campus/","date":"2024-11-01","title":"Cologix invests $7bn in Licking County, Ohio, data center campus","publisher":"DatacenterDynamics"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:01.894Z","updatedAt":"2026-08-19T00:28:37.960Z","capacityClaims":[{"id":"0c9b8c95-c136-438c-bc7a-30a9909d0791","dataCenterId":"6f07a860-1b32-475f-b4ff-bc63bb17ca86","series":"announced","valueGw":0.8,"asOf":"2024-11-01T00:00:00.000Z","sourceUrl":"https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"up to 800 MW across 8 buildings at full build-out; IT vs total not split","createdAt":"2026-08-17T20:21:02.597Z"}],"location":{"name":"Johnstown","slug":"johnstown-ohio"},"capacity_picture":{"announced_gw":0.8,"energized_gw":null,"announced_minus_energized_gw":0.8}},{"id":"e3275f41-fe39-4e59-9e65-90b39478283d","slug":"edgeconnex-pcx-new-albany-ohio","name":"EdgeConneX / PowerConneX New Albany Energy Center","aliases":["PCX New Albany Energy Center","PowerConneX New Albany"],"locationId":"c8245e03-38b0-4243-9753-af44aa940c35","lat":40.08,"lng":-82.79,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":48.6,"totalBuildingSqft":null,"streetAddress":null,"notes":"Co-located EdgeConneX data center powered by an on-site, off-grid PowerConneX gas plant in the New Albany International Business Park, Licking County. Ohio Power Siting Board certificated Phase 1 (up to 140 MW) and Phase 2 (up to 216 MW plus battery storage). The data center's own IT load, building count, and end tenant are not disclosed; coordinates are town-level approximate.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.edgeconnex.com/pcx-new-albany-energy-center/","date":"2025-07-22","title":"PCX New Albany Energy Center","publisher":"EdgeConneX"},{"url":"https://www.farmanddairy.com/news/opsb-approves-natural-gas-plant-to-power-data-center-in-licking-county/899062.html","date":"2025-11-21","title":"OPSB approves natural gas plant to power data center in Licking County","publisher":"Farm and Dairy"}],"reviewNote":null,"createdAt":"2026-08-17T20:20:57.220Z","updatedAt":"2026-08-19T00:15:51.174Z","capacityClaims":[{"id":"8e69d506-3757-4fad-aac6-8264f616a7d1","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","series":"announced","valueGw":0.14,"asOf":"2025-07-22T00:00:00.000Z","sourceUrl":"https://www.edgeconnex.com/pcx-new-albany-energy-center/","sourceType":"permit_filing","evidenceTier":"reported","supersedesId":null,"note":"OPSB certificate (Case No. 25-90-EL-BLN) authorizes up to 140 MW max generating capacity; behind-the-meter natural gas serving on-site data center","createdAt":"2026-08-19T00:15:51.856Z"},{"id":"852c670d-fc3f-4725-91a6-0722bac30301","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","series":"under_construction","valueGw":0.14,"asOf":"2025-09-01T00:00:00.000Z","sourceUrl":"https://www.edgeconnex.com/pcx-new-albany-energy-center/","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"Construction commenced September 2025; not yet energized as of research date","createdAt":"2026-08-19T00:15:52.701Z"}],"location":{"name":"New Albany","slug":"new-albany-ohio"},"capacity_picture":{"announced_gw":0.14,"energized_gw":null,"announced_minus_energized_gw":0.14}},{"id":"92f624bd-bd8f-423b-a90b-1e2601a92712","slug":"poolside-project-horizon-pecos-texas","name":"Poolside Project Horizon (West Texas)","aliases":["Project Horizon","Poolside West Texas campus","Longfellow Ranch data center"],"locationId":"ae3cd15c-df05-435c-8296-4bcacf2b37b6","lat":null,"lng":null,"landStatus":"private","lifecycleState":"stalled","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":"Established water and processing infrastructure on Longfellow Ranch, adjacent to a Permian Basin natural gas hub.","servingUtility":null,"acreage":568,"totalBuildingSqft":null,"streetAddress":null,"notes":"Poolside's planned 2 GW AI training campus on ~568 acres of the Mitchell family's Longfellow Ranch, unincorporated Pecos County (~25 mi from Fort Stockton), designed in eight 250 MW phases powered behind-the-meter by on-site aero-derivative gas turbines on Permian Basin gas (islanded from the public ERCOT grid). Announced Oct 2025 with CoreWeave as anchor tenant (15-year, 250 MW lease). Status now in serious doubt: CoreWeave terminated the anchor lease around late March 2026 after Poolside's ~$2B Series C failed to close, and no replacement anchor has been reported. Nothing energized; exact coordinates and firm capex not confirmed. Recorded as stalled.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterfrontier.com/machine-learning/article/55326541/how-coreweave-and-poolside-are-teaming-up-in-west-texas-to-build-the-next-generation-of-ai-data-centers","date":"2025-10-29","title":"How CoreWeave and Poolside Are Teaming Up in West Texas to Build the Next Generation of AI Data Centers","publisher":"Data Center Frontier"},{"url":"https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Partnership-with-Foundation-Model-Company-Poolside-to-Deliver-AI-Cloud-Services/default.aspx","date":"2025-10-15","title":"CoreWeave Announces Partnership with Foundation Model Company Poolside to Deliver AI Cloud Services","publisher":"CoreWeave (investor relations)"},{"url":"https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas","date":"2025-10-30","title":"Plans Unveiled for 2 GW Artificial Intelligence Campus in West Texas","publisher":"American Public Power Association"},{"url":"https://www.datacenterdynamics.com/en/news/ai-startup-poolside-teams-up-with-coreweave-on-2gw-data-center-in-texas/","date":"2025-10-15","title":"AI startup Poolside teams up with CoreWeave on 2GW data center in Texas","publisher":"Data Center Dynamics"},{"url":"https://mlq.ai/news/coreweave-ends-2-gw-texas-data-center-deal-with-poolside/","date":"2026-04-01","title":"CoreWeave Ends 2 GW Texas Data Center Deal With Poolside","publisher":"MLQ.ai"}],"reviewNote":null,"createdAt":"2026-08-17T18:20:54.547Z","updatedAt":"2026-08-19T00:28:29.260Z","capacityClaims":[{"id":"cd578ad4-a40b-4397-9659-08de30e47255","dataCenterId":"92f624bd-bd8f-423b-a90b-1e2601a92712","series":"announced","valueGw":2,"asOf":"2025-10-15T00:00:00.000Z","sourceUrl":"https://www.datacenterfrontier.com/machine-learning/article/55326541/how-coreweave-and-poolside-are-teaming-up-in-west-texas-to-build-the-next-generation-of-ai-data-centers","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"2 GW total across eight 250 MW phases (Poolside/CoreWeave announcement)","createdAt":"2026-08-17T18:20:55.250Z"},{"id":"8f243319-739b-45cd-831f-39b951818297","dataCenterId":"92f624bd-bd8f-423b-a90b-1e2601a92712","series":"energized","valueGw":0,"asOf":"2026-04-01T00:00:00.000Z","sourceUrl":"https://mlq.ai/news/coreweave-ends-2-gw-texas-data-center-deal-with-poolside/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Nothing energized; anchor lease terminated and Series C failed to close","createdAt":"2026-08-17T18:20:56.098Z"},{"id":"1b25567e-106a-41a3-b372-d12fbb6dfbf7","dataCenterId":"92f624bd-bd8f-423b-a90b-1e2601a92712","series":"contracted","valueGw":0.25,"asOf":"2025-10-15T00:00:00.000Z","sourceUrl":"https://www.datacenterfrontier.com/machine-learning/article/55326541/how-coreweave-and-poolside-are-teaming-up-in-west-texas-to-build-the-next-generation-of-ai-data-centers","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"CoreWeave anchor tenant for first 250MW phase under a 15-year lease, with 500MW reserved for expansion.","createdAt":"2026-08-19T00:28:29.943Z"}],"location":{"name":"Fort Stockton","slug":"fort-stockton-texas"},"capacity_picture":{"announced_gw":2,"energized_gw":0,"announced_minus_energized_gw":2}},{"id":"62a538a8-7354-4051-8f41-c9c1b866510e","slug":"openai-oracle-stargate-saline-michigan","name":"Stargate Saline Township (OpenAI / Oracle / Related Digital)","aliases":["Stargate Michigan","Saline Township Stargate","Related Digital Saline"],"locationId":"1f1a110e-25d5-485e-85f0-4b3e21c64e64","lat":null,"lng":null,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Stargate data center campus on 250 acres in Saline Township, Washtenaw County (three 550,000 sq ft single-story buildings) announced Oct 2025, construction from early 2026. Official capacity is more than a gigawatt; DTE Energy's approved 1.4 GW power supply agreement is the concrete contracted power figure. DTE supplies 100% via existing resources plus new battery storage. Dollar cost was multi-billion at announcement (~$7B initial figure cited, reportedly more than doubling since); exact capex and site coordinates not confirmed in primary sources.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/openai-oracle-and-related-digital-announce-stargate-data-center-site-in-michigan-302600302.html","date":"2025-10-30","title":"OpenAI, Oracle, and Related Digital Announce Stargate Data Center Site in Michigan","publisher":"PR Newswire (Related Digital)"},{"url":"https://openai.com/index/expanding-stargate-to-michigan/","date":"2025-10-30","title":"Expanding Stargate to Michigan","publisher":"OpenAI"},{"url":"https://www.datacenterdynamics.com/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/","date":"2026-01-20","title":"Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan","publisher":"Data Center Dynamics"},{"url":"https://www.tomshardware.com/tech-industry/michigan-towns-rush-to-block-ai-data-centers-after-16-billion-stargate-project-overrode-local-opposition","date":"2026-06-15","title":"Michigan towns rush to block AI data centers after $16 billion Stargate project (1.4 GW power supply)","publisher":"Tom's Hardware"}],"reviewNote":null,"createdAt":"2026-08-17T18:20:45.001Z","updatedAt":"2026-08-17T18:21:10.644Z","capacityClaims":[{"id":"f710c4e0-14ba-4d1d-bca6-c3ecbae43e7a","dataCenterId":"62a538a8-7354-4051-8f41-c9c1b866510e","series":"announced","valueGw":1,"asOf":"2025-10-30T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/openai-oracle-and-related-digital-announce-stargate-data-center-site-in-michigan-302600302.html","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"Official language is more than a gigawatt of capacity; recorded conservatively as 1.0 GW","createdAt":"2026-08-17T18:20:45.773Z"},{"id":"eccda8d5-31f2-4cb0-a4c2-c307e30ed53e","dataCenterId":"62a538a8-7354-4051-8f41-c9c1b866510e","series":"contracted","valueGw":1.4,"asOf":"2026-06-15T00:00:00.000Z","sourceUrl":"https://www.tomshardware.com/tech-industry/michigan-towns-rush-to-block-ai-data-centers-after-16-billion-stargate-project-overrode-local-opposition","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"Michigan Public Service Commission conditionally approved DTE's 19-year, 1.4 GW power supply agreement","createdAt":"2026-08-17T18:20:46.631Z"},{"id":"8e025d23-1a95-495b-879b-c4719f585e95","dataCenterId":"62a538a8-7354-4051-8f41-c9c1b866510e","series":"energized","valueGw":0,"asOf":"2026-01-20T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Construction stage; no capacity energized","createdAt":"2026-08-17T18:20:47.584Z"}],"location":{"name":"Saline Township","slug":"saline-township-michigan"},"capacity_picture":{"announced_gw":1,"energized_gw":0,"announced_minus_energized_gw":1}},{"id":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","slug":"meta-blackrock-el-paso-texas","name":"Meta / BlackRock El Paso AI Data Center Campus","aliases":["Meta El Paso","Meta BlackRock El Paso venture"],"locationId":"50941799-df9d-424b-9bcb-ac459d1e38cc","lat":null,"lng":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":null,"servingUtility":null,"acreage":1039,"totalBuildingSqft":null,"streetAddress":null,"notes":"1 GW AI compute campus (~4M sq ft on ~1,039 acres) that Meta is building and then contributed into an 80/20 JV with BlackRock. Power is grid from El Paso Electric (WECC, not ERCOT) up to 1.0 GW plus a proposed dedicated ~366 MW on-site natural gas plant. Capacity is planned to begin coming online in 2028; nothing is energized yet. Exact site coordinates not disclosed in primary sources.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","date":"2026-07-28","title":"Meta Announces New Strategic Venture with BlackRock to Develop Data Center in El Paso","publisher":"Meta"},{"url":"https://www.cnbc.com/2026/07/28/meta-blackrock-partner-on-14-billion-el-paso-data-center.html","date":"2026-07-28","title":"Meta, BlackRock partner on $14 billion El Paso data center venture","publisher":"CNBC"},{"url":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","date":"2026-03-26","title":"Meta to spend $10 billion on AI data center in El Paso, 1GW by 2028","publisher":"CNBC"},{"url":"https://w.media/meta-hands-blackrock-majority-stake-in-1-gw-el-paso-data-center/","date":"2026-07-29","title":"Meta hands BlackRock majority stake in 1 GW El Paso data center","publisher":"W.Media"}],"reviewNote":null,"createdAt":"2026-08-17T18:20:32.848Z","updatedAt":"2026-08-19T01:34:00.296Z","capacityClaims":[{"id":"fa688b42-12c7-4f10-91a6-bccdaddc4444","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","series":"announced","valueGw":1,"asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"Official Meta figure: 1 gigawatt of compute capacity","createdAt":"2026-08-17T18:20:33.600Z"},{"id":"aff560af-4fc5-42af-928e-c8d0dd301fbc","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","series":"contracted","valueGw":1,"asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://cryptobriefing.com/meta-el-paso-data-center-1gw/","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"El Paso Electric contracted to deliver up to 1.0 GW, with right to request up to 1.4 GW","createdAt":"2026-08-17T18:20:34.727Z"},{"id":"bcf15300-b746-4e2d-9424-298bd1191511","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","series":"energized","valueGw":0,"asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"Capacity expected to begin coming online in 2028; none energized as of announcement","createdAt":"2026-08-17T18:20:35.704Z"}],"location":{"name":"El Paso","slug":"el-paso-texas"},"capacity_picture":{"announced_gw":1,"energized_gw":0,"announced_minus_energized_gw":1}},{"id":"7cc3015d-47e3-41e5-b9f1-3f120ead46ef","slug":"softbank-openai-sakai-osaka","name":"SoftBank/OpenAI Sakai AI Data Center (former Sharp LCD plant)","aliases":["Sharp Sakai AI data center","SB OpenAI Japan Sakai","Stargate Japan Sakai"],"locationId":"e4867342-5fd9-4533-ae42-af1e5dd82729","lat":34.5833,"lng":135.4667,"landStatus":"brownfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":108.7,"totalBuildingSqft":null,"streetAddress":null,"notes":"SoftBank is converting a defunct Sharp LCD panel factory in Sakai, Osaka (bought for ~$676M / 100bn yen) into an AI data center, operated with OpenAI via the SB OpenAI Japan JV and positioned as the Japanese anchor of the Stargate project. Capacity starts around 150MW, expanding to over 240MW (reported up to ~250MW by FY2028); Nikkei estimated ~100,000 GPUs and total spend approaching ~$6.7B at full scale. Full GPU count and exact final capacity are not officially confirmed; nothing energized at announcement.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://techcrunch.com/2025/03/14/softbank-buys-676m-old-sharp-plant-for-its-openai-collab-in-japan","date":"2025-03-14","title":"SoftBank buys $676M old Sharp plant for its OpenAI collab in Japan","publisher":"TechCrunch"},{"url":"https://www.datacenterdynamics.com/en/news/softbank-buys-former-sharp-factory-for-676m-to-build-ai-data-center-in-osaka-japan/","date":"2025-03-14","title":"SoftBank buys former Sharp factory for $676m to build AI data center in Osaka, Japan","publisher":"Data Center Dynamics"},{"url":"https://asia.nikkei.com/business/technology/artificial-intelligence/softbank-openai-to-run-ai-agents-at-former-sharp-lcd-plant","date":"2025-03-14","title":"SoftBank, OpenAI to run AI agents at former Sharp LCD plant","publisher":"Nikkei Asia"}],"reviewNote":null,"createdAt":"2026-08-17T18:20:23.227Z","updatedAt":"2026-08-19T00:28:32.532Z","capacityClaims":[{"id":"61ba080b-1bfa-4992-8915-c76e187c2f8f","dataCenterId":"7cc3015d-47e3-41e5-b9f1-3f120ead46ef","series":"announced","valueGw":0.15,"asOf":"2025-03-14T00:00:00.000Z","sourceUrl":"https://techcrunch.com/2025/03/14/softbank-buys-676m-old-sharp-plant-for-its-openai-collab-in-japan","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Initial capacity around 150MW","createdAt":"2026-08-17T18:20:24.057Z"},{"id":"c257a0db-aeec-4058-a603-78966fa4ed42","dataCenterId":"7cc3015d-47e3-41e5-b9f1-3f120ead46ef","series":"announced","valueGw":0.25,"asOf":"2025-03-14T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/softbank-buys-former-sharp-factory-for-676m-to-build-ai-data-center-in-osaka-japan/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Expansion to over 240MW (reported up to ~250MW by FY2028)","createdAt":"2026-08-17T18:20:25.022Z"},{"id":"25d10503-6bfe-483d-bb3f-9f9f385a4146","dataCenterId":"7cc3015d-47e3-41e5-b9f1-3f120ead46ef","series":"energized","valueGw":0,"asOf":"2025-03-14T00:00:00.000Z","sourceUrl":"https://techcrunch.com/2025/03/14/softbank-buys-676m-old-sharp-plant-for-its-openai-collab-in-japan","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Operations targeted to commence 2026; nothing energized at purchase","createdAt":"2026-08-17T18:20:25.759Z"},{"id":"ee3ea572-1305-479c-9aff-b9a768e944c5","dataCenterId":"7cc3015d-47e3-41e5-b9f1-3f120ead46ef","series":"announced","valueGw":0.4,"asOf":"2024-06-07T00:00:00.000Z","sourceUrl":"https://www.softbank.jp/en/corp/news/press/sbkk/2024/20240607_01/","sourceType":"company_filing","evidenceTier":"reported","supersedesId":null,"note":"Future expansion target of over 400MW.","createdAt":"2026-08-19T00:28:33.219Z"}],"location":{"name":"Sakai","slug":"sakai-osaka"},"capacity_picture":{"announced_gw":0.15,"energized_gw":0,"announced_minus_energized_gw":0.15}},{"id":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","slug":"mistral-mgx-bruyeres-le-chatel","name":"MGX/Bpifrance/Nvidia/Mistral AI Campus (Bruyeres-le-Chatel)","aliases":["Europe's largest AI campus","Mistral Eclairion Bruyeres-le-Chatel","France AI gigafactory"],"locationId":"4aee0440-710e-4ceb-86aa-b7a60ea2f255","lat":48.5667,"lng":2.1667,"landStatus":"private","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Joint venture (MGX, Bpifrance, NVIDIA, Mistral AI) announced 19 May 2025 at the Choose France Summit to build what partners call Europe's largest AI campus, ultimately 1.4GW, in the Paris region near Bruyeres-le-Chatel, Essonne. A smaller ~44MW first data center hosted by Eclairion at the same site is the near-term phase (in service targeted Q2 2026); full-campus construction is slated to begin H2 2026 with operations by 2028. Total campus capex is not publicly disclosed; runs on France's low-carbon (nuclear-heavy) grid.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france","date":"2025-05-19","title":"MGX, Bpifrance, Mistral AI, and NVIDIA Launch Joint Venture to Build Europe's Largest AI Campus in France","publisher":"Ecole Polytechnique"},{"url":"https://www.datacenterdynamics.com/en/news/mgx-bpifrance-nvidia-and-mistral-ai-plan-14gw-paris-data-center-campus/","date":"2025-05-20","title":"MGX, Bpifrance, Nvidia, and Mistral AI plan 1.4GW Paris data center campus","publisher":"Data Center Dynamics"},{"url":"https://www.usine-digitale.fr/editorial/mistral-ai-va-ouvrir-son-premier-data-center-en-france.N2227191","date":"2025-02-06","title":"Mistral AI va ouvrir son premier data center en France (Eclairion, Bruyeres-le-Chatel)","publisher":"L'Usine Digitale"}],"reviewNote":null,"createdAt":"2026-08-17T18:20:11.009Z","updatedAt":"2026-08-19T00:28:11.603Z","capacityClaims":[{"id":"6ed26d65-8053-4ed6-baa2-8d2d803ea7fb","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","series":"announced","valueGw":1.4,"asOf":"2025-05-19T00:00:00.000Z","sourceUrl":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Ultimate campus capacity; construction to begin H2 2026, operations by 2028","createdAt":"2026-08-17T18:20:11.830Z"},{"id":"126b254c-ea02-43d1-b8da-6dfee374eeaa","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","series":"announced","valueGw":0.044,"asOf":"2025-02-06T00:00:00.000Z","sourceUrl":"https://www.usine-digitale.fr/editorial/mistral-ai-va-ouvrir-son-premier-data-center-en-france.N2227191","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Near-term ~44MW first data center with Eclairion; targeted in service Q2 2026","createdAt":"2026-08-17T18:20:12.736Z"},{"id":"e26f2686-e4ea-4276-ac25-9ac7099ee824","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","series":"energized","valueGw":0,"asOf":"2025-05-19T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/mgx-bpifrance-nvidia-and-mistral-ai-plan-14gw-paris-data-center-campus/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"No campus capacity energized at announcement","createdAt":"2026-08-17T18:20:13.589Z"},{"id":"e9ab816b-ddf6-455e-8171-6c329821dfbb","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","series":"energized","valueGw":0.044,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/mistral-ai-raises-830m-in-debt-financing-for-data-center-in-paris-france/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Operational 44MW Mistral compute node in the Eclairion facility at Bruyeres-le-Chatel, ~18,000 NVIDIA GB200; first node toward 200MW across Europe by 2027.","createdAt":"2026-08-19T00:28:12.293Z"}],"location":{"name":"Bruyeres-le-Chatel","slug":"bruyeres-le-chatel-essonne"},"capacity_picture":{"announced_gw":0.044,"energized_gw":0.044,"announced_minus_energized_gw":0}},{"id":"30c92b75-7001-4e3c-b579-91a4de785cd9","slug":"stargate-norway-narvik","name":"Stargate Norway (Kvandal / Narvik)","aliases":["Stargate Norway","Nscale Narvik","Kvandal AI Gigafactory"],"locationId":"501b41f3-2b9c-4130-911e-902c25849893","lat":68.4385,"lng":17.4272,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":"Closed-loop direct-to-chip liquid cooling; excess heat available for regional low-carbon enterprises / district heating","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"50/50 Nscale-Aker JV in Kvandal outside Narvik; OpenAI is the initial offtaker under its OpenAI for Countries programme. Targets 230MW and 100,000 NVIDIA GPUs by end of 2026, with a stated ambition to add a further 290MW (total ~520MW). Powered by regional surplus hydropower with closed-loop direct-to-chip liquid cooling. Only a 20MW first phase is financially committed so far; energized capacity is effectively zero as of announcement.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.nscale.com/press-releases/stargate-norway-nscale-aker-openai","date":"2025-07-31","title":"Nscale, Aker and OpenAI to establish Stargate Norway","publisher":"Nscale"},{"url":"https://openai.com/index/introducing-stargate-norway/","date":"2025-07-31","title":"Introducing Stargate Norway","publisher":"OpenAI"},{"url":"https://www.datacenterdynamics.com/en/news/openai-partners-with-nscale-and-aker-for-stargate-norway-data-center-with-100k-gpus/","date":"2025-07-31","title":"OpenAI partners with Nscale and Aker for Stargate Norway data center with 100k GPUs","publisher":"Data Center Dynamics"}],"reviewNote":null,"createdAt":"2026-08-17T18:19:59.404Z","updatedAt":"2026-08-19T01:33:49.207Z","capacityClaims":[{"id":"f46b7955-4f1e-4034-b44f-593f9d1eba7e","dataCenterId":"30c92b75-7001-4e3c-b579-91a4de785cd9","series":"announced","valueGw":0.23,"asOf":"2025-07-31T00:00:00.000Z","sourceUrl":"https://www.nscale.com/press-releases/stargate-norway-nscale-aker-openai","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"230MW targeted by end of 2026; 100,000 NVIDIA GPUs","createdAt":"2026-08-17T18:20:00.107Z"},{"id":"a567807f-b965-4134-a834-8587270796d5","dataCenterId":"30c92b75-7001-4e3c-b579-91a4de785cd9","series":"announced","valueGw":0.29,"asOf":"2025-07-31T00:00:00.000Z","sourceUrl":"https://www.nscale.com/press-releases/stargate-norway-nscale-aker-openai","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Stated ambition to expand by an additional 290MW beyond the initial 230MW","createdAt":"2026-08-17T18:20:00.990Z"},{"id":"da4d7845-325c-479d-9e9d-137b17a80e15","dataCenterId":"30c92b75-7001-4e3c-b579-91a4de785cd9","series":"under_construction","valueGw":0.02,"asOf":"2025-07-31T00:00:00.000Z","sourceUrl":"https://www.nscale.com/press-releases/stargate-norway-nscale-aker-openai","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"20MW initial phase is the only financially committed tranche","createdAt":"2026-08-17T18:20:01.726Z"},{"id":"95509118-0381-45bc-869d-fdcf9486aea5","dataCenterId":"30c92b75-7001-4e3c-b579-91a4de785cd9","series":"energized","valueGw":0,"asOf":"2025-07-31T00:00:00.000Z","sourceUrl":"https://openai.com/index/introducing-stargate-norway/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"No capacity energized at announcement; GPUs targeted for end of 2026","createdAt":"2026-08-17T18:20:02.617Z"}],"location":{"name":"Narvik","slug":"narvik-nordland"},"capacity_picture":{"announced_gw":0.23,"energized_gw":0,"announced_minus_energized_gw":0.23}},{"id":"4c5d91e2-9598-4b3c-9128-702828bf4251","slug":"stargate-dona-ana-county-new-mexico","name":"Stargate Doña Ana County / Project Jupiter (New Mexico)","aliases":[],"locationId":"426e17fd-34c9-4de4-a2c4-c6a9d933fc9b","lat":31.9,"lng":-106.65,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"Closed-loop cooling; proposed domestic water use ~20,000 gallons/day; on-site microgrid targeting net-zero emissions by 2045.","servingUtility":null,"acreage":1400,"totalBuildingSqft":null,"streetAddress":null,"notes":"An Oracle-led Stargate site in Doña Ana County, New Mexico, developed by STACK Infrastructure under the name Project Jupiter (four large buildings). Epoch AI's April 2026 tracker reports foundation work underway with satellite imagery, a planned ~2.2 GW, and power from two on-site natural gas microgrids designed to limit local-grid impact. The site sits in the WECC region (not ERCOT/PJM/MISO/SPP). No energized capacity reported yet.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://openai.com/index/five-new-stargate-sites/","title":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites","sourceName":"OpenAI"},{"url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","title":"OpenAI Stargate: where the US sites stand","sourceName":"Epoch AI"}],"reviewNote":null,"createdAt":"2026-08-17T18:13:26.103Z","updatedAt":"2026-08-19T00:28:22.643Z","capacityClaims":[{"id":"afe50ea4-5ba6-4aaa-b4f6-e35ef8648845","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","series":"announced","valueGw":2.2,"asOf":"2026-04-17T00:00:00.000Z","sourceUrl":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Epoch AI planned-capacity estimate for Project Jupiter; part of the ~5.5 GW OpenAI attributed to the three Oracle-led sites.","createdAt":"2026-08-17T18:13:26.792Z"},{"id":"31529050-fa17-4d1b-a0ef-7220958a80b7","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","series":"energized","valueGw":0,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Epoch AI site tracker shows Project Jupiter (Santa Teresa) at 0 GW as of mid-2026 with foundation work underway. First GW targeted H2 2026, initial operations Q4 2026; nothing energized yet.","createdAt":"2026-08-17T18:33:40.755Z"}],"location":{"name":"Santa Teresa","slug":"santa-teresa-new-mexico"},"capacity_picture":{"announced_gw":2.2,"energized_gw":0,"announced_minus_energized_gw":2.2}},{"id":"ee721b56-04e9-45a0-a9e7-d35b1371566d","slug":"stargate-milam-county-texas","name":"Stargate Milam County (Texas)","aliases":[],"locationId":"a1c7c0ac-a267-4e72-b3ab-5522eef71afb","lat":30.655,"lng":-96.975,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"solar_storage","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":"Designed as a water-minimizing 'fast-build' campus.","servingUtility":null,"acreage":595,"totalBuildingSqft":null,"streetAddress":null,"notes":"One of the two SoftBank/OpenAI-led Stargate sites (announced Sept 24, 2025), built and operated by SoftBank subsidiary SB Energy as a water-minimizing 'fast-build' campus ~70 miles northeast of Austin near Rockdale in Milam County. Epoch AI's April 2026 tracker reports steel framing and roofing visible with delivery expected around October 2026 and a planned ~1.2 GW; on-site generation type not disclosed. No energized capacity reported yet.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://openai.com/index/five-new-stargate-sites/","title":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites","sourceName":"OpenAI"},{"url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","title":"OpenAI Stargate: where the US sites stand","sourceName":"Epoch AI"},{"url":"https://www.kcentv.com/article/news/local/stargate-ai-data-center-coming-milam-county/500-282d4a0a-1e79-4adc-ae6b-0dd858d4ab50","title":"Stargate AI data center coming to Milam County","sourceName":"KCEN-TV"}],"reviewNote":null,"createdAt":"2026-08-17T18:13:18.378Z","updatedAt":"2026-08-19T00:28:18.672Z","capacityClaims":[{"id":"a499d694-0d2e-46bd-861d-b0e5633c7737","dataCenterId":"ee721b56-04e9-45a0-a9e7-d35b1371566d","series":"announced","valueGw":1.2,"asOf":"2026-04-17T00:00:00.000Z","sourceUrl":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Epoch AI planned-capacity estimate for the Milam County fast-build site.","createdAt":"2026-08-17T18:13:19.063Z"},{"id":"9cb0e917-fe5e-4141-8c7d-0e1584db9b3a","dataCenterId":"ee721b56-04e9-45a0-a9e7-d35b1371566d","series":"announced","valueGw":1.5,"asOf":"2025-09-24T00:00:00.000Z","sourceUrl":"https://openai.com/index/five-new-stargate-sites/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"OpenAI's combined 1.5 GW figure for the two SoftBank sites (Milam + Lordstown) over ~18 months; not Milam alone.","createdAt":"2026-08-17T18:13:19.906Z"},{"id":"a73a5915-41cb-4eb7-a059-d9cefcd09d28","dataCenterId":"ee721b56-04e9-45a0-a9e7-d35b1371566d","series":"energized","valueGw":0,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Epoch AI tracker shows Milam County (Freebird, near Rockdale) 1.2 GW site at 0 GW as of mid-2026; March 2026 imagery showed only steel framing on the first building, TDLR filings target Oct 15 2026 structural completion (not energization). No IT load online.","createdAt":"2026-08-17T18:33:43.496Z"}],"location":{"name":"Rockdale","slug":"rockdale-texas"},"capacity_picture":{"announced_gw":1.2,"energized_gw":0,"announced_minus_energized_gw":1.2}},{"id":"8eb98cdb-8ad1-4fe9-9385-f6c54e2db0b6","slug":"stargate-lordstown-ohio","name":"Stargate Lordstown (Ohio)","aliases":[],"locationId":"70038cf8-8823-43ce-a620-b52afda06e6d","lat":41.166,"lng":-80.854,"landStatus":"former_industrial","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"One of the two SoftBank/OpenAI-led Stargate sites announced Sept 24, 2025, sited at the former Foxconn/Lordstown Motors EV plant (a SoftBank-Foxconn JV, plant acquired for ~$375M in Aug 2025). Epoch AI's April 2026 tracker describes it as primarily a modular server/equipment manufacturing facility with any datacenter block likely <0.3 GW; land cleared but minimal datacenter construction visible. OpenAI framed Lordstown plus Milam County as scaling to a combined 1.5 GW within ~18 months.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://openai.com/index/five-new-stargate-sites/","title":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites","sourceName":"OpenAI"},{"url":"https://group.softbank/en/news/press/20250924","title":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites","sourceName":"SoftBank Group"},{"url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","title":"OpenAI Stargate: where the US sites stand","sourceName":"Epoch AI"}],"reviewNote":null,"createdAt":"2026-08-17T18:13:09.024Z","updatedAt":"2026-08-17T18:14:14.261Z","capacityClaims":[{"id":"ac1e1fe8-b924-4ba4-82d0-a4963183cb26","dataCenterId":"8eb98cdb-8ad1-4fe9-9385-f6c54e2db0b6","series":"announced","valueGw":1.5,"asOf":"2025-09-24T00:00:00.000Z","sourceUrl":"https://openai.com/index/five-new-stargate-sites/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Combined figure for the two SoftBank sites (Lordstown + Milam County) scaling over ~18 months; not Lordstown alone.","createdAt":"2026-08-17T18:13:09.733Z"},{"id":"c03f7e7d-3a5c-4557-9577-b84cdad9b7fd","dataCenterId":"8eb98cdb-8ad1-4fe9-9385-f6c54e2db0b6","series":"announced","valueGw":0.3,"asOf":"2026-04-17T00:00:00.000Z","sourceUrl":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Epoch AI estimate: Lordstown datacenter block likely no more than ~0.3 GW; site is chiefly equipment manufacturing.","createdAt":"2026-08-17T18:13:10.588Z"},{"id":"dcc59f56-4b6f-4841-95b4-eef7b63cc31e","dataCenterId":"8eb98cdb-8ad1-4fe9-9385-f6c54e2db0b6","series":"energized","valueGw":0,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Epoch AI tracker shows Lordstown at 0 GW as of mid-2026; some land cleared, no large-scale construction visible. SoftBank/Foxconn hall conversion (up to 0.3 GW planned); no operational IT power.","createdAt":"2026-08-17T18:33:42.125Z"}],"location":{"name":"Lordstown","slug":"lordstown-ohio"},"capacity_picture":{"announced_gw":0.3,"energized_gw":0,"announced_minus_energized_gw":0.3}},{"id":"473bb952-2e13-4eb6-91a5-08fd9f8db306","slug":"qts-van-wert-ohio-campus","name":"QTS Data Centers — Van Wert, Ohio Campus","aliases":[],"locationId":"e50ba5fc-202e-454d-934a-1599adbcc905","lat":40.87,"lng":-84.58,"landStatus":"private","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"QTS (a Blackstone portfolio company) announced a $10B, ~500 MW data center campus on a 902-acre mega-site near U.S. 30 in Van Wert, northwest Ohio, in May 2026, with up to seven buildings and closed-loop (near-zero-water) cooling. Groundbreaking is set for Q4 2026, first building operational ~Q1 2029, full buildout ~2032. It is the best-documented current QTS gigawatt-class effort after the company abandoned its larger Prince William 'Digital Gateway' campus in July 2026 over voided zoning. Nothing energized yet.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/qts-behind-van-wert-ohio-mega-site-acquisition-announces-10-billion-data-center-campus/","title":"QTS behind Van Wert, Ohio mega-site; $10B data center campus","sourceName":"Data Center Dynamics"},{"url":"https://q.com/news/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/","title":"City of Van Wert and QTS Announce Data Center Campus in NW Ohio","sourceName":"QTS Data Centers"},{"url":"https://www.toledoblade.com/business/development/2026/05/29/van-wert-announces-agreement-for-10b-data-center-development/stories/20260529091","title":"Van Wert announces agreement for $10B data center development","sourceName":"The Toledo Blade"}],"reviewNote":null,"createdAt":"2026-08-17T18:13:02.311Z","updatedAt":"2026-08-17T18:14:13.520Z","capacityClaims":[{"id":"5655217a-c274-4fde-87ef-5f1371bf1dbe","dataCenterId":"473bb952-2e13-4eb6-91a5-08fd9f8db306","series":"announced","valueGw":0.5,"asOf":"2026-05-29T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/qts-behind-van-wert-ohio-mega-site-acquisition-announces-10-billion-data-center-campus/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"~500 MW across up to seven buildings on 902 acres; groundbreaking Q4 2026, first building ~Q1 2029, full buildout ~2032. No energized capacity (honest absence).","createdAt":"2026-08-17T18:13:02.989Z"},{"id":"c8fe3022-3a56-4af0-afbf-0b396ccb6272","dataCenterId":"473bb952-2e13-4eb6-91a5-08fd9f8db306","series":"energized","valueGw":0,"asOf":"2026-05-29T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/qts-behind-van-wert-ohio-mega-site-acquisition-announces-10-billion-data-center-campus/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"QTS/Van Wert $10B ~500 MW campus announced May 2026; officials stated not fully operational until 2032. Early/pre-construction; nothing energized.","createdAt":"2026-08-17T18:33:39.368Z"}],"location":{"name":"Van Wert","slug":"van-wert-ohio"},"capacity_picture":{"announced_gw":0.5,"energized_gw":0,"announced_minus_energized_gw":0.5}},{"id":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","slug":"vantage-frontier-shackelford-county","name":"Vantage Data Centers — Frontier (Shackelford County, TX)","aliases":[],"locationId":"27c61bbc-b9cf-40b0-aee9-0bf2c1972ecd","lat":32.73,"lng":-99.3,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Vantage's largest-ever campus: a $25B, 1.4 GW, 1,200-acre / 10-building (3.7M sq ft) AI mega-campus in Shackelford County, TX, unveiled Aug 19, 2025 and confirmed as a Stargate site for OpenAI. Designed for behind-the-meter natural-gas generation (a ~700 MW phase-one microgrid, ~210 generators per TCEQ air registrations) to bypass ERCOT interconnection queues. Construction underway with the first facility targeted for H2 2026; no capacity energized yet.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","title":"Vantage unveils Frontier, a $25B mega-campus in Texas","sourceName":"Vantage Data Centers"},{"url":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/","title":"Vantage breaks ground on Texas gigawatt data center campus for OpenAI","sourceName":"Data Center Dynamics"},{"url":"https://www.constructionowners.com/news/oracle-and-openai-to-power-new-texas-data-center-off-the-grid","title":"New off-grid Texas data center to run on ~700MW natural gas microgrid","sourceName":"Construction Owners"},{"url":"https://www.datacenterfrontier.com/machine-learning/article/55319132/scaling-stargate-openais-five-new-us-data-centers-push-toward-10-gw-ai-infrastructure","title":"Scaling Stargate: OpenAI's five new US data centers","sourceName":"Data Center Frontier"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:54.861Z","updatedAt":"2026-08-17T18:14:12.770Z","capacityClaims":[{"id":"76f20d22-19dc-40a0-8827-7e509348c6c7","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","series":"announced","valueGw":1.4,"asOf":"2025-08-19T00:00:00.000Z","sourceUrl":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"1.4 GW across 10 buildings / 3.7M sq ft on 1,200 acres; supports 250kW+ racks with liquid cooling.","createdAt":"2026-08-17T18:12:55.556Z"},{"id":"91cf5b5d-ca62-4696-b000-03e36efba1a7","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","series":"under_construction","valueGw":1.4,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Ground broken; first facility targeted H2 2026, full buildout ~2028. No energized capacity reported yet (honest absence).","createdAt":"2026-08-17T18:12:56.456Z"},{"id":"18f24181-8c64-4596-a452-fd18cfc4b7c3","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","series":"energized","valueGw":0,"asOf":"2026-08-17T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Vantage $25B 1.4 GW Frontier campus (10 buildings) has broken ground and is under construction; first data center scheduled H2 2026, full 1.4 GW by 2028. No building delivered or energized as of mid-August 2026.","createdAt":"2026-08-17T18:33:46.370Z"}],"location":{"name":"Albany (Shackelford County)","slug":"albany-shackelford-county-texas"},"capacity_picture":{"announced_gw":1.4,"energized_gw":0,"announced_minus_energized_gw":1.4}},{"id":"10010870-fc71-428e-b78e-66f972d37c33","slug":"fermi-amarillo-texas","name":"Fermi America HyperGrid (Project Matador)","aliases":[],"locationId":"6849f027-3dde-4d07-a4fc-819337209551","lat":35.3187,"lng":-101.5601,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"SPP","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Fermi America (Fermi Inc, co-founded by former Energy Secretary Rick Perry, partnered with the Texas Tech University System) is building 'Project Matador,' an announced 11 GW behind-the-meter HyperGrid campus on ~7,570 acres near the DOE Pantex plant in Amarillo, combining nuclear, combined-cycle gas, solar, wind and battery storage on a private grid rather than the public network. The generation is the story and is largely unbuilt: the first 1 GW is targeted online by late 2026, and Fermi is delivering an initial 2.3 GW phase. Fermi went public on Nasdaq (~$15B valuation, $682.5M IPO raise) with over $1.4B invested in site buildout to date.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.texastech.edu/stories/25-06-ttu-system-and-fermi-america-announce-partnership.php","title":"TTU System and Fermi America Announce the World's Largest Advanced Energy and Intelligence Campus","sourceName":"Texas Tech University System"},{"url":"https://www.datacenterdynamics.com/en/news/fermi-makes-stock-market-debut-valued-at-almost-15bn/","title":"Fermi makes stock market debut, valued at almost $15bn","sourceName":"DataCenterDynamics"},{"url":"https://www.prnewswire.com/news-releases/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors-11gw-private-hypergrid-campus-302693111.html","title":"Fermi America Makes Initial Draw on $200M Equipment Facility to Accelerate First 2.3GW of Project Matador's 11GW HyperGrid","sourceName":"PR Newswire / Fermi America"},{"url":"https://www.sec.gov/Archives/edgar/data/0002071778/000121390026078366/ea029807401ex99-1.htm","title":"Fermi Inc. Form 8-K FY2026 exhibit","sourceName":"SEC EDGAR"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:44.213Z","updatedAt":"2026-08-17T18:14:12.018Z","capacityClaims":[{"id":"b2cdcc96-3daa-4b4a-87b8-637509ab2a79","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","series":"announced","valueGw":11,"asOf":"2025-06-26T00:00:00.000Z","sourceUrl":"https://www.texastech.edu/stories/25-06-ttu-system-and-fermi-america-announce-partnership.php","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Up to 11 GW of power and 18M sq ft of AI capacity across ~5,800 acres (site total ~7,570 acres secured/leased).","createdAt":"2026-08-17T18:12:44.900Z"},{"id":"9da59816-3a06-49e5-983f-2a9cf68bdac6","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","series":"under_construction","valueGw":2.3,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors-11gw-private-hypergrid-campus-302693111.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"First 2.3 GW phase being financed/delivered; first 1 GW targeted online by late 2026.","createdAt":"2026-08-17T18:12:45.771Z"},{"id":"57104b60-2ed1-4b39-9f2c-c8c37a5e791e","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","series":"energized","valueGw":0,"asOf":"2026-08-17T00:00:00.000Z","sourceUrl":"https://www.myhighplains.com/news/your-local-election-hq/amarillo-ai-data-center-project/fermi-america-pauses-construction-near-amarillo-while-waiting-for-tceq-permits/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Project Matador/HyperGrid construction paused awaiting TCEQ air permits; ~1.1 GW-by-end-2026 goal pulled back to phased Phase-1 startup in H1 2027. Turbines in refurbishment/transit. Nothing energized.","createdAt":"2026-08-17T18:33:36.534Z"}],"location":{"name":"Amarillo","slug":"amarillo-texas"},"capacity_picture":{"announced_gw":11,"energized_gw":0,"announced_minus_energized_gw":11}},{"id":"1c60d653-887c-4221-ac49-ed56853a4c66","slug":"homer-city-pennsylvania","name":"Homer City Energy Campus","aliases":[],"locationId":"36688e75-5469-449d-a820-dff8b2f9c074","lat":40.5019,"lng":-79.1919,"landStatus":"brownfield","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Homer City Redevelopment is converting Pennsylvania's retired 2 GW Homer City coal plant (closed July 2023) into a 3,200+ acre, ~$10 billion natural gas-powered AI/HPC data center campus, positioned as the largest gas-fired power project in the US. The power is the story: seven GE Vernova 7HA.02 hydrogen-capable turbines will supply up to ~4.4-4.5 GW, with first turbine deliveries in 2026 and generation starting by 2027. Site prep and demolition are complete and vertical construction has begun; no data center load is energized yet.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.homercityredevelopment.com/project-overview","title":"Project Overview | Homer City Redevelopment","sourceName":"Homer City Redevelopment"},{"url":"https://www.utilitydive.com/news/homer-city-gas-fired-power-station-data-center-firstenergy/744332/","title":"Largest US gas-fired power plant planned for data centers in Pennsylvania","sourceName":"Utility Dive"},{"url":"https://www.enerdata.net/publications/daily-energy-news/ge-vernova-wins-turbine-order-45-gw-gas-powered-data-center-campus-us.html-0","title":"GE Vernova wins turbine order for 4.5 GW gas-powered data center campus (US)","sourceName":"Enerdata"},{"url":"https://constructionreviewonline.com/former-homer-city-plant-to-become-a-10-billion-ai-data-center-campus/","title":"Former Homer City Plant to Become a $10 Billion AI Data Center Campus","sourceName":"Construction Review Online"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:36.092Z","updatedAt":"2026-08-17T18:14:11.255Z","capacityClaims":[{"id":"08091fab-dd96-4f5b-ab59-b94aad1db08c","dataCenterId":"1c60d653-887c-4221-ac49-ed56853a4c66","series":"announced","valueGw":4.5,"asOf":"2025-04-02T00:00:00.000Z","sourceUrl":"https://www.enerdata.net/publications/daily-energy-news/ge-vernova-wins-turbine-order-45-gw-gas-powered-data-center-campus-us.html-0","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Announced 4.5 GW gas-powered campus (Homer City Redevelopment project-overview page states 'up to 4.4 GW'); backed by 7x GE Vernova 7HA.02 turbine order.","createdAt":"2026-08-17T18:12:36.770Z"},{"id":"ecb7eb24-af2a-45e2-9287-5a58689ede4a","dataCenterId":"1c60d653-887c-4221-ac49-ed56853a4c66","series":"energized","valueGw":0,"asOf":"2026-08-17T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Former coal plant being redeveloped into a 4.5 GW gas-fired campus (7x GE Vernova 7HA.02 turbines). Turbine delivery begins 2026, commercial operations slated 2027. No IT load energized yet.","createdAt":"2026-08-17T18:33:37.980Z"}],"location":{"name":"Homer City","slug":"homer-city-pennsylvania"},"capacity_picture":{"announced_gw":4.5,"energized_gw":0,"announced_minus_energized_gw":4.5}},{"id":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","slug":"crusoe-childress-texas","name":"Crusoe Childress Campus","aliases":[],"locationId":"81180bd0-68b8-42ee-a428-8210b3182a82","lat":34.4265,"lng":-100.2038,"landStatus":"private","lifecycleState":"announced","powerSourceMix":"solar_storage","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":"Closed-loop, non-evaporative liquid cooling to reduce water use.","servingUtility":null,"acreage":270,"totalBuildingSqft":null,"streetAddress":null,"notes":"Crusoe and Lancium announced (July 2026) a 1.4 GW AI data center campus in Childress, Texas on a 270-acre Lancium-owned site, mirroring their Abilene model: Crusoe develops/operates the data centers and Lancium manages behind-the-meter energy. Powered by behind-the-meter solar and storage with a 1 GW ERCOT-approved interconnect; closed-loop cooling. Construction expected to begin Q3 2026; no capacity energized yet.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/","title":"Crusoe to develop 1.4GW data center campus in Childress, Texas","sourceName":"DataCenterDynamics"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","title":"Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas","sourceName":"Crusoe"},{"url":"https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/","title":"Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas","sourceName":"Lancium"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:30.228Z","updatedAt":"2026-08-19T01:33:41.626Z","capacityClaims":[{"id":"b7434d0b-d7e0-45a1-b060-819c587b4038","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","series":"announced","valueGw":1.4,"asOf":"2026-07-15T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"DataCenterDynamics reports 1.4 GW; Crusoe/Lancium press release frames the initial announcement as 1.0 GW. 270-acre site.","createdAt":"2026-08-17T18:12:30.909Z"},{"id":"14e4a312-7062-47fe-9c52-90fca4c83f1a","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","series":"energized","valueGw":0,"asOf":"2026-07-15T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Crusoe/Lancium 1.0-1.4 GW campus announced July 15 2026, construction expected Q3 2026 on Lancium's 270-acre site. Nothing built or energized; no operational IT load.","createdAt":"2026-08-17T18:33:35.174Z"},{"id":"13afa868-ef26-40ce-bf48-30a59337d2bd","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","series":"announced","valueGw":1,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"1.0 GW grid-connected per the July 15 2026 Crusoe/Lancium announcement (DCD headlines up to 1.4 GW); purpose-built for an unnamed leading hyperscaler.","createdAt":"2026-08-19T01:33:42.313Z"}],"location":{"name":"Childress","slug":"childress-texas"},"capacity_picture":{"announced_gw":1,"energized_gw":0,"announced_minus_energized_gw":1}},{"id":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","slug":"coreweave-galaxy-helios-afton-texas","name":"Galaxy Helios Campus (CoreWeave)","aliases":[],"locationId":"7dbdf9ef-e452-4842-b2e2-67d67d1303d4","lat":33.7361,"lng":-100.7734,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":2200,"totalBuildingSqft":null,"streetAddress":null,"notes":"Galaxy Digital's Helios campus in Dickens County (near Afton, West Texas) is fully leased to CoreWeave under a 15-year agreement and is CoreWeave's largest US AI footprint. Galaxy holds over 1.6 GW of ERCOT-approved, utility-contracted grid capacity; Phase I delivered ~200 MW gross / 133 MW of critical IT load to CoreWeave in Q2 2026. CoreWeave has committed to 526 MW of critical IT load (800 MW gross) across Phases I-III.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/galaxy-completes-ercot-interconnection-studies-and-secures-approval-for-additional-830-megawatts-at-helios-data-center-campus-doubling-total-approved-power-capacity-to-over-1-6-gigawatts-302662509.html","title":"Galaxy Completes ERCOT Interconnection Studies and Secures Approval for Additional 830 MW at Helios, Doubling Total to over 1.6 GW","sourceName":"PR Newswire / Galaxy Digital"},{"url":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","title":"Galaxy Completes Phase I of Helios, Delivering 133 MW of Critical IT Load to CoreWeave","sourceName":"PR Newswire / Galaxy Digital"},{"url":"https://www.datacenterdynamics.com/en/news/galaxy-digital-closes-14bn-debt-facility-for-helios-data-center-campus-in-texas/","title":"Galaxy Digital closes $1.4bn debt facility for Helios data center campus in Texas","sourceName":"DataCenterDynamics"},{"url":"https://www.everythinglubbock.com/news/local-news/massive-3-5-billion-expansion-planned-at-ai-data-center-in-dickens-county/","title":"$3.5B Permits Filed for Galaxy Helios Data Center Phase 2","sourceName":"EverythingLubbock"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:20.017Z","updatedAt":"2026-08-19T01:33:46.072Z","capacityClaims":[{"id":"a7741d59-da0c-4043-a998-5434c8d71bce","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","series":"announced","valueGw":1.6,"asOf":"2026-01-31T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-ercot-interconnection-studies-and-secures-approval-for-additional-830-megawatts-at-helios-data-center-campus-doubling-total-approved-power-capacity-to-over-1-6-gigawatts-302662509.html","sourceType":"utility_filing","evidenceTier":"verified","supersedesId":null,"note":"ERCOT LLIS-complete, approved and utility-contracted grid capacity (not yet energized); long-term expansion potential cited up to 3.5 GW.","createdAt":"2026-08-17T18:12:20.698Z"},{"id":"4bd8ff3b-50d7-476c-8085-69a501e19a50","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","series":"contracted","valueGw":0.8,"asOf":"2026-05-31T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"CoreWeave lease Phases I-III: 800 MW gross / 526 MW critical IT load committed.","createdAt":"2026-08-17T18:12:21.548Z"},{"id":"cd2b3156-37d2-4386-8255-b10681afec22","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","series":"energized","valueGw":0.133,"asOf":"2026-05-31T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Phase I delivered ~200 MW gross / 133 MW critical IT load; rent commenced Q2 2026.","createdAt":"2026-08-17T18:12:22.375Z"},{"id":"c3c0c0ac-1a4b-4c63-a2b5-7dcdc7975c32","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","series":"announced","valueGw":1.63,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Total approved power capacity at Helios; company states it may scale to as much as 3.6 GW","createdAt":"2026-08-19T01:33:46.760Z"},{"id":"fadf0bef-5d72-4dcc-947f-03f4de1b07e2","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","series":"under_construction","valueGw":0.26,"asOf":"2027-06-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Phase II: 260 MW critical IT under greenfield development; data hall deliveries expected H1 2027","createdAt":"2026-08-19T01:33:47.447Z"}],"location":{"name":"Afton","slug":"afton-texas"},"capacity_picture":{"announced_gw":1.6,"energized_gw":0.133,"announced_minus_energized_gw":1.467}},{"id":"6c37130e-35d9-4987-8196-9ab3f0882584","slug":"ytl-green-data-center-park-kulai-johor","name":"YTL Green Data Center Park","aliases":[],"locationId":"ce12f299-2d7b-4120-88e3-c2a76f169ab3","lat":1.6615,"lng":103.6059,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"Tenaga Nasional Berhad (TNB)","waterSourceNotes":null,"servingUtility":null,"acreage":1640,"totalBuildingSqft":null,"streetAddress":null,"notes":"1,640-acre hyperscale park in Kulai, Johor developed by YTL Power International / YTL Data Center Holdings, planned for up to 500MW and pitched as Malaysia's first hyperscale park co-powered by on-site solar (500MW solar plant plus ~600MW grid backup). YTL completed and energized its first Nvidia-powered facility (YTL AI Cloud, liquid-cooled GB200 NVL72 GPUs) on 31 Oct 2025; ~300MW is currently being built/commissioned toward full capacity within about two years. Part of a RM10bn (~$2.1bn) YTL-Nvidia project within a broader ~$4.3bn Malaysia buildout.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://theedgemalaysia.com/node/776142","title":"YTL Power completes first Nvidia-powered AI data centre in Johor, YTL AI Cloud now operational","sourceName":"The Edge Malaysia"},{"url":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","title":"YTL Power completes Nvidia-powered AI data centre in Johor","sourceName":"W.Media"},{"url":"https://www.datacenterdynamics.com/en/news/nvidia-ytl-power-partner-for-43bn-ai-data-centers-in-malaysia/","title":"Nvidia & YTL Power partner for $4.3bn AI data centers in Malaysia","sourceName":"Data Center Dynamics"},{"url":"https://www.thestar.com.my/business/business-news/2026/06/29/ytl-power-stamping-its-mark-on-dc-sector","title":"YTL Power stamping its mark on DC sector","sourceName":"The Star"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:12.630Z","updatedAt":"2026-08-19T01:33:36.015Z","capacityClaims":[{"id":"132ac123-bed9-48cb-b7e4-0ca95f94d120","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","series":"announced","valueGw":0.5,"asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Park planned for up to 500MW total capacity.","createdAt":"2026-08-17T18:12:13.316Z"},{"id":"f14dfa5f-a122-40b6-bec1-8bb39a4fd2fc","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","series":"under_construction","valueGw":0.3,"asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"~300MW being built and commissioned; full capacity expected within ~2 years.","createdAt":"2026-08-17T18:12:14.161Z"},{"id":"d65785c4-818f-411b-b4e1-935b79eff34a","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","series":"energized","valueGw":0.048,"asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://theedgemalaysia.com/node/776142","sourceType":"journalist_report","evidenceTier":"verified","supersedesId":null,"note":"YTL Power completed its first Nvidia GB200-powered facility (JDC1) Oct 31 2025, YTL AI Cloud live; first-phase IT load 48MW (expandable to 72MW), 32MW anchor tenant. Energized operational phase within the 600MW park plan; operational as of Aug 2026.","createdAt":"2026-08-17T18:33:49.118Z"}],"location":{"name":"Kulai","slug":"kulai-johor"},"capacity_picture":{"announced_gw":0.5,"energized_gw":0.048,"announced_minus_energized_gw":0.452}},{"id":"5fcab939-95bb-45dd-8828-a530e6feea38","slug":"envision-galaxy-ulanqab-china","name":"Envision Galaxy Campus","aliases":[],"locationId":"577ee934-a104-463b-a36d-099a1a1f505e","lat":41.0006,"lng":113.1155,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"solar_storage","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Green-tech firm Envision Energy commissioned what it calls the world's largest single AI data center building at its Galaxy Campus in Ulanqab, Inner Mongolia (announced 6 Aug 2026), powered by on-site wind/solar plus storage as part of its 'Mission Gobi' program. Envision claims the campus can scale beyond 2GW and eventually house up to one million AI accelerators, but only an initial building is commissioned and the full capacity is still being built out. Chinese-sourced capacity figures are frequently inflated and unverified by independent utility/permit data, so the 2GW figure is treated as a company claim.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://interestingengineering.com/energy/envision-galaxy-campus-million-ai-accelerators-renewable-power","title":"China commissions world's largest data center campus built for 2 GW, 1M accelerators","sourceName":"Interesting Engineering"},{"url":"https://www.techtimes.com/articles/323410/20260806/envision-commissions-worlds-largest-ai-data-center-building-using-site-renewables.htm","title":"Envision Commissions World's Largest AI Data Center Building Using On-Site Renewables","sourceName":"Tech Times"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:08.355Z","updatedAt":"2026-08-19T00:14:54.430Z","capacityClaims":[{"id":"ef53db6f-b743-4238-a419-14a3bcb23c36","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","series":"announced","valueGw":2,"asOf":"2026-08-06T00:00:00.000Z","sourceUrl":"https://interestingengineering.com/energy/envision-galaxy-campus-million-ai-accelerators-renewable-power","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Company claim of scaling beyond 2GW / up to 1M AI accelerators; only an initial building commissioned. Chinese figures often inflated - provenance is an Envision announcement, not independent utility/permit data.","createdAt":"2026-08-17T18:12:09.050Z"},{"id":"6f5d5cd3-b1f8-40dd-9e06-bfc64133c2a6","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","series":"energized","valueGw":0.12,"asOf":"2026-08-06T00:00:00.000Z","sourceUrl":"https://www.energyconnects.com/news/renewables/2026/august/chinese-renewable-energy-giant-envision-launches-data-center/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Initial 120 MW phase commissioned, allocated to two local tech firms.","createdAt":"2026-08-19T00:14:55.108Z"}],"location":{"name":"Ulanqab","slug":"ulanqab-inner-mongolia"},"capacity_picture":{"announced_gw":2,"energized_gw":0.12,"announced_minus_energized_gw":1.88}},{"id":"68549634-6d59-45db-864b-212966f675e3","slug":"humain-saudi-arabia","name":"HUMAIN (Riyadh & Dammam flagship data centers)","aliases":[],"locationId":"dbfe2930-6ef3-4852-83ad-2a138e235a5d","lat":24.7136,"lng":46.6753,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"Saudi Electricity Company (SEC)","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"PIF-owned sovereign AI champion (launched May 2025) that broke ground on twin 100MW flagship campuses in Riyadh and Dammam (Eastern Province), with first facilities expected to go live Q2 2026. Riyadh phase 1 uses 18,000 Nvidia GB300 chips, with Nvidia committed to several hundred thousand more (up to ~500MW), plus a $10B AMD deal and a Qualcomm MoU (up to 200MW). Stated roadmap: 1.9GW by 2030 scaling toward 6.6GW; no independently confirmed energized capacity as of Aug 2026.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/","title":"Humain breaks ground two data centers, first facilities expected Q2 2026","sourceName":"Data Center Dynamics"},{"url":"https://www.datacenterdynamics.com/en/news/saudi-arabian-ai-venture-humain-buys-18000-nvidia-gb300-chips-several-hundred-thousand-more-on-the-way/","title":"Saudi AI venture Humain buys 18,000 Nvidia GB300 chips","sourceName":"Data Center Dynamics"},{"url":"https://www.tomshardware.com/pc-components/gpus/nvidia-sending-18-000-ai-gpus-to-saudi-arabias-state-backed-ai-data-centers-in-wake-of-cancelled-export-rules","title":"Nvidia to send 18,000 AI GPUs to Saudi Arabia's state-backed AI data centers","sourceName":"Tom's Hardware"},{"url":"https://www.arabnews.com/node/2630217/business-economy","title":"PIF-backed Humain secures up to $1.2bn to expand AI infrastructure","sourceName":"Arab News"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:59.355Z","updatedAt":"2026-08-17T18:14:07.434Z","capacityClaims":[{"id":"f70a7380-9400-4625-a590-44ee694d6ae3","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","series":"announced","valueGw":1.9,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Roadmap target 1.9GW by 2030, scaling toward 6.6GW long-term.","createdAt":"2026-08-17T18:12:00.022Z"},{"id":"cd1371e0-84b5-4d75-8cf5-c6c3508d9b4e","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","series":"under_construction","valueGw":0.2,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Twin 100MW flagship campuses (Riyadh + Dammam) under construction, go-live expected Q2 2026.","createdAt":"2026-08-17T18:12:00.861Z"},{"id":"7ea7962c-0a8c-4e70-9c2d-87479f85e3f7","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","series":"energized","valueGw":0,"asOf":"2026-07-31T00:00:00.000Z","sourceUrl":"https://vision2030.ai/analysis/humain-data-centers-riyadh-dammam-status/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"As of July 31 2026 no filing or credible report confirms HUMAIN's Riyadh or Dammam sites (each ~100MW announced) in commercial service; both under construction, original Q2 2026 go-live missed. No operational confirmation.","createdAt":"2026-08-17T18:33:50.559Z"}],"location":{"name":"Riyadh","slug":"riyadh-riyadh-province"},"capacity_picture":{"announced_gw":1.9,"energized_gw":0,"announced_minus_energized_gw":1.9}},{"id":"49b3f935-bec2-46b6-9958-1d30f62fee79","slug":"stargate-uae-abu-dhabi","name":"Stargate UAE","aliases":[],"locationId":"a04ed750-42ca-420b-9d58-7284c4c96959","lat":24.4539,"lng":54.3773,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"EWEC (Emirates Water and Electricity Company)","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"First international node of OpenAI's Stargate program, developed by G42 subsidiary Khazna Data Centres in Abu Dhabi. The Stargate UAE cluster is a 1GW build (part of a broader announced 5GW UAE-US AI Campus); the first 200MW phase is under construction with long-lead equipment procured and first mechanical systems delivered, targeting go-live around September 2026. Provisioned with ~100,000 Nvidia GB300 Grace Blackwell chips; not yet energized as of Aug 2026.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html","title":"G42 Provides Update on Construction of Stargate UAE AI Infrastructure Cluster","sourceName":"G42 / PR Newswire"},{"url":"https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae","title":"Global Tech Alliance Launches Stargate UAE","sourceName":"G42"},{"url":"https://gulfnews.com/business/markets/uae-openai-will-build-massive-stargate-ai-center-in-abu-dhabi-1.500136990","title":"Stargate UAE: OpenAI to build world's largest AI data centre in Abu Dhabi","sourceName":"Gulf News"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:50.986Z","updatedAt":"2026-08-17T18:14:06.664Z","capacityClaims":[{"id":"d8df7d01-de88-4441-8a01-0026084e0b27","dataCenterId":"49b3f935-bec2-46b6-9958-1d30f62fee79","series":"announced","valueGw":1,"asOf":"2025-10-13T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"1GW Stargate UAE cluster; part of a broader announced 5GW UAE-US AI Campus.","createdAt":"2026-08-17T18:11:51.671Z"},{"id":"2c93a6e6-2483-499e-a72c-808b16e6ce5e","dataCenterId":"49b3f935-bec2-46b6-9958-1d30f62fee79","series":"under_construction","valueGw":0.2,"asOf":"2025-10-13T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"First 200MW phase under construction, ~100k Nvidia GB300 chips, targeting live 2026.","createdAt":"2026-08-17T18:11:52.580Z"},{"id":"12dfb77c-6f99-44ff-be5b-10df9a9eb363","dataCenterId":"49b3f935-bec2-46b6-9958-1d30f62fee79","series":"energized","valueGw":0,"asOf":"2026-08-17T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"G42 construction update (Oct 16 2025): civil/structural work well advanced, MEP being finalized; first 200MW of the 1GW cluster targeted Q3 2026, still upcoming as of Aug 2026. No IT load online yet.","createdAt":"2026-08-17T18:33:47.754Z"}],"location":{"name":"Abu Dhabi","slug":"abu-dhabi-abu-dhabi"},"capacity_picture":{"announced_gw":1,"energized_gw":0,"announced_minus_energized_gw":1}},{"id":"49044b3a-b534-4134-b8b4-461e0eb98bf2","slug":"amazon-project-rainier-indiana","name":"Amazon Project Rainier Data Center (New Carlisle)","aliases":[],"locationId":"c047df0e-c90d-414c-a6db-cc46828fa89f","lat":41.7,"lng":-86.5,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Project Rainier is AWS's ~$11B New Carlisle campus dedicated to training and serving Anthropic's Claude models on Amazon's own Trainium chips; Amazon declared it operational in October 2025 with ~500,000 Trainium2 chips running. As of March 2026 Buildings 1-16 were operational (~910 MW IT power per Epoch), with the full site planned for 30 buildings and >2.2 GW; Anthropic targets roughly 1 GW of Trainium online by end of 2026. Power is grid-supplied by Indiana Michigan Power (AEP) within PJM. This is the most-energized of the four: a real operating figure exists, well below the 2.2 GW announced ceiling.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html","title":"Amazon opens $11 billion AI data center Project Rainier in Indiana","sourceName":"CNBC"},{"url":"https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle","title":"Anthropic-Amazon New Carlisle | AI Data Centers","sourceName":"Epoch AI"},{"url":"https://www.blackridgeresearch.com/project-profiles/aws-project-rainier-new-carlisle-indiana-usa-data-center-supercluster-cost-contractors-timeline-latest-updates","title":"AWS Project Rainier, Indiana: Latest Updates (2026)","sourceName":"Blackridge Research"},{"url":"https://measuredai.substack.com/p/aws-new-carlisle-data-center-campus","title":"AWS New Carlisle Data Center Campus: Project Rainier","sourceName":"MeasuredAI"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:39.758Z","updatedAt":"2026-08-17T18:14:05.899Z","capacityClaims":[{"id":"8e5a7b13-016e-4b9f-91be-f668668a1a49","dataCenterId":"49044b3a-b534-4134-b8b4-461e0eb98bf2","series":"announced","valueGw":2.2,"asOf":"2025-10-29T00:00:00.000Z","sourceUrl":"https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Full site to span 30 buildings and draw >2.2 GW.","createdAt":"2026-08-17T18:11:40.533Z"},{"id":"fb49a3b4-db56-481d-9a1b-4b1281a9fca6","dataCenterId":"49044b3a-b534-4134-b8b4-461e0eb98bf2","series":"energized","valueGw":0.91,"asOf":"2026-03-23T00:00:00.000Z","sourceUrl":"https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Buildings 1-16 operational, ~910 MW IT power; ~500k Trainium2 chips running since Oct 2025.","createdAt":"2026-08-17T18:11:41.369Z"},{"id":"abb11870-8f79-4edf-a520-b14d8797bb42","dataCenterId":"49044b3a-b534-4134-b8b4-461e0eb98bf2","series":"under_construction","valueGw":1.925,"asOf":"2028-01-01T00:00:00.000Z","sourceUrl":"https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Projected ~1,925 MW IT power by Q1 2028 as remaining buildings complete; Anthropic targets ~1 GW Trainium online by end 2026.","createdAt":"2026-08-17T18:11:42.184Z"}],"location":{"name":"New Carlisle","slug":"new-carlisle-indiana"},"capacity_picture":{"announced_gw":2.2,"energized_gw":0.91,"announced_minus_energized_gw":1.29}},{"id":"824d3b90-2903-4335-9716-8f73fb969f7a","slug":"microsoft-fairwater-wisconsin","name":"Microsoft Fairwater Data Center (Mount Pleasant)","aliases":[],"locationId":"1f1633ba-b8ba-4d54-ae81-4666aa6420c5","lat":42.75,"lng":-87.94,"landStatus":"former_industrial","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Microsoft completed and energized the first Fairwater facility (Building 1) in Mount Pleasant in June 2026 (operational since April 2026), on the former Foxconn site, calling it one of the world's most powerful AI supercomputers. Phase 1 filed a hard load of 450 MW with the Public Service Commission of Wisconsin; roughly 369 MW of IT power / ~446k H100-equivalents is operational today, with a second facility under construction targeting 2028 and campus IT power projected to exceed 2.2 GW. Power is entirely grid-supplied by We Energies, which is building ~1.2 GW of new gas generation (Oak Creek + Paris) justified partly on this load.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","title":"Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin","sourceName":"Microsoft Source"},{"url":"https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin","title":"Microsoft Fairwater Wisconsin | AI Data Centers","sourceName":"Epoch AI"},{"url":"https://www.utilitydive.com/news/wisconsin-gas-plant-proposals-test-state-review-process/825885/","title":"Wisconsin gas plant proposals test state review process","sourceName":"Utility Dive"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:29.591Z","updatedAt":"2026-08-17T18:14:05.146Z","capacityClaims":[{"id":"d78823b9-53f5-4e65-9d8f-4133d15085ad","dataCenterId":"824d3b90-2903-4335-9716-8f73fb969f7a","series":"announced","valueGw":0.45,"asOf":"2025-01-01T00:00:00.000Z","sourceUrl":"https://www.utilitydive.com/news/wisconsin-gas-plant-proposals-test-state-review-process/825885/","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"Phase 1 hard load of 450 MW filed with the Public Service Commission of Wisconsin (Jan 2025).","createdAt":"2026-08-17T18:11:30.311Z"},{"id":"f2a7229e-f471-4c76-a50c-89fe73d7ef4f","dataCenterId":"824d3b90-2903-4335-9716-8f73fb969f7a","series":"energized","valueGw":0.369,"asOf":"2026-04-16T00:00:00.000Z","sourceUrl":"https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"~369 MW IT power / ~446k H100-equivalents operational (Building 1 online since Apr 2026, construction completed June 2026).","createdAt":"2026-08-17T18:11:31.134Z"},{"id":"27714a1c-9783-4472-9dd6-3645f6b60b55","dataCenterId":"824d3b90-2903-4335-9716-8f73fb969f7a","series":"under_construction","valueGw":2.26,"asOf":"2028-05-13T00:00:00.000Z","sourceUrl":"https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Projected campus IT power ~2,263 MW by Q2 2028 as additional buildings complete; second facility due 2028.","createdAt":"2026-08-17T18:11:31.971Z"}],"location":{"name":"Mount Pleasant","slug":"mount-pleasant-wisconsin"},"capacity_picture":{"announced_gw":0.45,"energized_gw":0.369,"announced_minus_energized_gw":0.08100000000000002}},{"id":"d7c13110-4def-4903-9828-a30b405f3afb","slug":"meta-prometheus-ohio","name":"Meta Prometheus Data Center (New Albany)","aliases":[],"locationId":"c8245e03-38b0-4243-9753-af44aa940c35","lat":40.09,"lng":-82.71,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Prometheus is Meta's ~1 GW New Albany supercluster (5 traditional buildings plus 7 weatherproof 'tent' structures on ~740 acres at 1500 Beech Road), billed as the world's first gigawatt-class AI data center and slated to come fully online by end of 2026. As of May 2026 more than 500 MW of AI compute was reported already installed, so it is partially energized rather than fully built. Power is a mix: Williams' Socrates South behind-the-meter gas (~200 MW firm) under construction, plus contracted renewables (~800 MW) and nuclear PPAs (Vistra, Constellation, plus future Oklo/TerraPower).","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","title":"Meta's Prometheus and Google's Central Ohio Cluster: An AI Data Center Primer","sourceName":"MeasuredAI"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/meet-prometheus-worlds-highest-capacity-data-center-slated-to-open-in-ohio-in-2026/","title":"Meet Prometheus: World's highest capacity data center slated to open in Ohio in 2026","sourceName":"NBC4 WCMH-TV"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/","title":"Meta will use nuclear power for its New Albany A.I. data center","sourceName":"NBC4 WCMH-TV"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:19.103Z","updatedAt":"2026-08-17T18:14:04.396Z","capacityClaims":[{"id":"228dd5de-1edc-4e06-b4ca-be483e4224f0","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","series":"announced","valueGw":1,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"~1 GW spanning multiple buildings; described as world's first 1 GW-class data center.","createdAt":"2026-08-17T18:11:19.800Z"},{"id":"a834afe5-e82f-446d-9e0b-f2fa2d7b80ce","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","series":"energized","valueGw":0.5,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"More than 500 MW of AI compute reported already installed as of May 2026; full campus targeted to come online by end of 2026.","createdAt":"2026-08-17T18:11:20.627Z"}],"location":{"name":"New Albany","slug":"new-albany-ohio"},"capacity_picture":{"announced_gw":1,"energized_gw":0.5,"announced_minus_energized_gw":0.5}},{"id":"89efdd2f-1ec9-47a1-bb7c-a1ad597bc991","slug":"meta-hyperion-louisiana","name":"Meta Hyperion Data Center (Richland Parish)","aliases":[],"locationId":"57bb40b8-4f5e-411d-9d79-b12532206904","lat":32.42,"lng":-91.49,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"MISO","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Meta broke ground Dec 2024 on Hyperion, since scaled from an initial 2 GW / $10B plan to a 5 GW compute campus with more than $50B in stated investment; ground is broken but no compute is energized yet (Meta targets ~2 GW by 2030, no date set for full 5 GW). Power is utility-built by Entergy Louisiana: the LPSC approved three new gas plants in 2025 and Entergy is seeking seven more (10 plants / ~7.5 GW total), plus Meta-funded renewables and battery storage. Announced capacity is a company claim; nothing is operational.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","title":"Deepening our investment in Richland Parish, Louisiana","sourceName":"Meta Data Centers"},{"url":"https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html","title":"Meta's Louisiana data center investment to reach $50 billion","sourceName":"CNBC"},{"url":"https://fortune.com/2026/03/27/meta-hyperion-10-gas-power-plants-louisiana-entergy/","title":"Meta orders 10 gas-fired power plants for its Hyperion AI campus","sourceName":"Fortune"},{"url":"https://www.rtoinsider.com/129344-entergy-7-more-gas-plants-necessary-meta-data-center/","title":"Entergy Louisiana Says 7 More Gas Plants Necessary for Meta Data Center","sourceName":"RTO Insider"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:08.651Z","updatedAt":"2026-08-17T18:14:03.636Z","capacityClaims":[{"id":"cecaca49-db18-4d33-ae42-b487786f73ac","dataCenterId":"89efdd2f-1ec9-47a1-bb7c-a1ad597bc991","series":"announced","valueGw":5,"asOf":"2026-07-13T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"5 GW of compute capacity; scaled up from originally announced 2 GW (Dec 2024).","createdAt":"2026-08-17T18:11:09.333Z"},{"id":"c3eb3fbb-e00f-4360-b096-85de34c371ea","dataCenterId":"89efdd2f-1ec9-47a1-bb7c-a1ad597bc991","series":"under_construction","valueGw":2,"asOf":"2026-07-13T00:00:00.000Z","sourceUrl":"https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Meta says on track to hit 2 GW by 2030; no date set for full 5 GW. Nothing energized yet.","createdAt":"2026-08-17T18:11:10.175Z"},{"id":"aca9e6db-b726-4db4-a5b5-36a9c06a01fa","dataCenterId":"89efdd2f-1ec9-47a1-bb7c-a1ad597bc991","series":"energized","valueGw":0,"asOf":"2026-08-17T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Hyperion (Richland Parish/Holly Ridge) fully under construction as of Aug 2026; civil work mobilized around Jan 2026; Entergy building gas plants to power it. Targets ~2 GW by 2030, 5 GW by ~2032. No IT capacity energized yet.","createdAt":"2026-08-17T18:33:44.859Z"}],"location":{"name":"Delhi","slug":"delhi-louisiana"},"capacity_picture":{"announced_gw":5,"energized_gw":0,"announced_minus_energized_gw":5}},{"id":"5e637e75-ee05-435d-91ce-18fa574c2eff","slug":"stargate-abilene","name":"Stargate Abilene","aliases":["Stargate Texas","Abilene Stargate","OpenAI Oracle Abilene"],"locationId":"4495a090-7118-4c79-8522-882b737dd11c","lat":32.45,"lng":-99.73,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":875,"totalBuildingSqft":null,"streetAddress":null,"notes":"The flagship site of the OpenAI / Oracle / SoftBank Stargate project, built by Crusoe in Abilene, Texas (ERCOT). It is the most complete Stargate site: roughly 0.3 GW is operating across about four of eight buildings, housing Nvidia Blackwell chips. OpenAI and Oracle capped the site at 1.2 GW in March 2026 after grid-interconnection delays exceeding a year, reversing an earlier plan to expand it to 2.1 GW and redirecting that capacity to other Stargate locations.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://winbuzzer.com/2026/03/09/openai-oracle-cap-texas-ai-data-center-abilene-stargate-xcxwbn/","title":"OpenAI and Oracle Cap Texas AI Data Center at 1.2 GW","sourceName":"WinBuzzer"},{"url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","title":"OpenAI Stargate: where the US sites stand","sourceName":"Epoch AI"}],"reviewNote":null,"createdAt":"2026-08-17T17:02:32.018Z","updatedAt":"2026-08-19T01:33:28.175Z","capacityClaims":[{"id":"ca3aee69-bf05-4e48-b98a-afffa80e02b5","dataCenterId":"5e637e75-ee05-435d-91ce-18fa574c2eff","series":"energized","valueGw":0.3,"asOf":"2026-06-30T12:00:00.000Z","sourceUrl":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"About 0.3 GW operating across roughly four of eight buildings.","createdAt":"2026-08-17T17:02:34.478Z"},{"id":"b464bca9-6f02-48cb-984b-a0db4dcce702","dataCenterId":"5e637e75-ee05-435d-91ce-18fa574c2eff","series":"announced","valueGw":1.2,"asOf":"2024-07-18T00:00:00.000Z","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-200mw-ai-data-center","sourceType":"press_release","evidenceTier":"reported","supersedesId":"8581142e-0b52-401c-ba6e-5552093ee1d9","note":"1.2 GW at Lancium Clean Campus. Original claimant Crusoe own release 2024-07-18 (reaffirmed 2025-03-18).","createdAt":"2026-08-17T17:02:33.557Z"},{"id":"8581142e-0b52-401c-ba6e-5552093ee1d9","dataCenterId":"5e637e75-ee05-435d-91ce-18fa574c2eff","series":"announced","valueGw":2.1,"asOf":"2026-03-27T00:00:00.000Z","sourceUrl":"https://www.datacenterknowledge.com/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"~2.1 GW combined campus (1.2 GW Crusoe/Oracle/OpenAI + 900 MW Microsoft AI factory). Original claimant Crusoe (900 MW addition, 2026-03-27); access source Data Center Knowledge.","createdAt":"2026-08-17T17:02:32.721Z"}],"location":{"name":"Abilene","slug":"abilene-texas"},"capacity_picture":{"announced_gw":1.2,"energized_gw":0.3,"announced_minus_energized_gw":0.8999999999999999}},{"id":"c174e6dd-1a31-4984-be75-5ca3adf7aafa","slug":"xai-colossus-memphis","name":"xAI Colossus (Memphis)","aliases":["Colossus","Colossus 1","Colossus 2","xAI Memphis supercluster"],"locationId":"1ffe2451-a057-475c-a4a9-f6ef8b9015a9","lat":35.02,"lng":-90.03,"landStatus":"former_industrial","lifecycleState":"partially_energized","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"xAI's Colossus AI training campus in the Whitehaven area of Memphis, Tennessee (Colossus 1 at 3231 Riverport Rd; Colossus 2 at 5420 Tulane Rd), with associated on-site gas generation. Elon Musk announced a 2 GW total-capacity target in January 2026 (555,000 Nvidia GPUs, ~$18B). As of mid-2026 the combined sites provided on the order of 1 GW of operating AI-compute capacity, powered largely behind the meter by on-site gas turbines supplied by Solaris Energy Infrastructure (about 400 MW serving xAI, with Solaris expecting over 1.1 GW operating for xAI by Q2 2027).","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://introl.com/blog/xai-colossus-2-gigawatt-expansion-555k-gpus-january-2026","title":"xAI Colossus Hits 2 GW: 555,000 GPUs, $18B","sourceName":"Introl"},{"url":"https://newsletter.semianalysis.com/p/xais-colossus-2-first-gigawatt-datacenter","title":"xAI's Colossus 2: First Gigawatt Datacenter","sourceName":"SemiAnalysis"}],"reviewNote":null,"createdAt":"2026-08-17T17:02:25.186Z","updatedAt":"2026-08-17T17:02:41.086Z","capacityClaims":[{"id":"60e1bcca-863d-43f2-87b0-96329ae0b22d","dataCenterId":"c174e6dd-1a31-4984-be75-5ca3adf7aafa","series":"announced","valueGw":2,"asOf":"2026-01-15T12:00:00.000Z","sourceUrl":"https://www.techzine.eu/news/infrastructure/137578/xai-expands-colossus-megadata-center-to-2-gigawatts/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Musk's announced 2 GW total-capacity target.","createdAt":"2026-08-17T17:02:25.915Z"},{"id":"baf1e855-3460-4871-844b-062e7fa81f91","dataCenterId":"c174e6dd-1a31-4984-be75-5ca3adf7aafa","series":"energized","valueGw":1,"asOf":"2026-06-30T12:00:00.000Z","sourceUrl":"https://introl.com/blog/xai-colossus-2-gigawatt-expansion-555k-gpus-january-2026","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"On the order of 1 GW of AI compute operating across the combined sites, mid-2026.","createdAt":"2026-08-17T17:02:26.833Z"}],"location":{"name":"Memphis","slug":"memphis-tennessee"},"capacity_picture":{"announced_gw":2,"energized_gw":1,"announced_minus_energized_gw":1}},{"id":"c6de1f86-d0f5-4aa2-b82c-448149f7a8d0","slug":"sb-energy-openai-ohio","name":"PORTS-Pike Technology Campus (SB Energy / OpenAI)","aliases":["Ports-Pike","SB Energy Ohio campus","OpenAI Ohio data center","Pike County OpenAI campus"],"locationId":"f88dafd1-ca11-4901-b537-e1e03dfd1993","lat":39.0673,"lng":-83.0157,"landStatus":"doe","lifecycleState":"announced","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Announced 2026-08-17: SB Energy (a SoftBank subsidiary) will build and operate an AI data-center campus on federal DOE land in Piketon, Pike County, Ohio (the former Portsmouth uranium-enrichment site), leased to OpenAI on a 20-year term and hosting Nvidia compute exclusively. Announced capacity is up to 10 GW of energy (about 8 IT-GW). The first 800 MW phase is targeted to begin operating in 2028; nothing is energized today. Nvidia agreed to guarantee up to $105B of OpenAI's conditional lease and power-payment obligations to SB Energy (per an SEC filing), scaled down from an originally reported $250B and initially backing 4.25 GW, and is investing $1.5B in SB Energy. The campus depends on 9.2 GW of new gas-fired generation that is itself unbuilt and that U.S. officials say Japan would fund under a 2025 trade and investment deal.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute","title":"NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio","sourceName":"NVIDIA"},{"url":"https://www.cnbc.com/2026/08/17/nvidia-financing-open-ai-data-center-ohio.html","title":"Nvidia backing $105 billion in financing for OpenAI data center in Ohio","sourceName":"CNBC"},{"url":"https://www.axios.com/2026/08/17/openai-nvidia-ohio-data-center-sb-energy","title":"OpenAI announces massive Ohio data center with Nvidia guarantee","sourceName":"Axios"}],"reviewNote":null,"createdAt":"2026-08-17T16:40:29.335Z","updatedAt":"2026-08-17T16:58:39.897Z","capacityClaims":[{"id":"2d53dd28-c2b7-4c27-b585-a6099da63b49","dataCenterId":"c6de1f86-d0f5-4aa2-b82c-448149f7a8d0","series":"announced","valueGw":10,"asOf":"2026-08-17T12:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/openai-in-talks-to-lease-10gw-data-center-from-sb-energy-in-ohio/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Up to 10 GW of energy / ~8 IT-GW announced for the full campus.","createdAt":"2026-08-17T16:40:30.923Z"},{"id":"11819a43-cc46-41c9-92d0-f272e397e1e5","dataCenterId":"c6de1f86-d0f5-4aa2-b82c-448149f7a8d0","series":"contracted","valueGw":4.25,"asOf":"2026-08-17T12:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Nvidia initially backs 4.25 GW of OpenAI capacity at the site.","createdAt":"2026-08-17T16:40:32.653Z"},{"id":"672c7195-71eb-40e3-ad0d-771c08e2c324","dataCenterId":"c6de1f86-d0f5-4aa2-b82c-448149f7a8d0","series":"energized","valueGw":0,"asOf":"2026-08-17T12:00:00.000Z","sourceUrl":"https://www.axios.com/2026/08/17/openai-nvidia-ohio-data-center-sb-energy","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"No capacity operational; the first 800 MW phase is targeted for 2028.","createdAt":"2026-08-17T16:40:34.637Z"}],"location":{"name":"Piketon","slug":"piketon-ohio"},"capacity_picture":{"announced_gw":10,"energized_gw":0,"announced_minus_energized_gw":10}}]}