{"id":"d3473917-8d06-4873-9049-d953c9440389","slug":"5c-amd-mount-carmel-township-data-center-campus-pennsylvania","name":"5C Mount Carmel Township data center campus (Northumberland County, Pennsylvania)","aliases":[],"locationId":"28da1987-e444-4658-a95b-d59b784aa2d7","lat":null,"lng":null,"locationPrecision":"county","landStatus":"former_industrial","lifecycleState":"announced","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Project Phoenix is a proposed data center campus on about 351 acres of former mining property in Mount Carmel Township, Northumberland County, Pennsylvania. Fit Energy USA filed the conditional-use application; the township-hosted filing names AMD as the ultimate end user and 5C PHL01 Inc. as the operator, with the purchase of the site from Fit Energy still under negotiation. The first single-story building could total 160MW of IT capacity across 482,895 sq ft, and the first phase could see two buildings totaling 1.5 million sq ft. The News-Item reported the project could become the first building in a development of up to 2,400 acres across four sites. The application remains under township review with public hearings required.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.newsitem.com/news/local/amd-named-tenant-in-mount-carmel-township-data-center-project-with-potential-2-400-acre/article_6a0b5525-4f57-4072-9715-854786ce5784.html","title":"AMD named tenant in Mount Carmel Township data center project with potential 2,400-acre campus","sourceName":"The News-Item","publishedAt":"2026-11-18"},{"url":"https://dataphoenix.info/news/amd-project-phoenix-pennsylvania-filing","title":"Pennsylvania filing names AMD as Project Phoenix tenant","sourceName":"Data Phoenix"},{"url":"https://www.privatewealthdaily.com/story/amd-named-intended-tenant-at-5c-s-pennsylvania-campus","title":"AMD named intended tenant at planned 5C Pennsylvania data campus","sourceName":"Private Wealth Daily","publishedAt":"2026-11-20"}],"reviewNote":null,"createdAt":"2026-11-22T00:35:43.261Z","updatedAt":"2026-11-22T00:35:43.707Z","location":{"id":"28da1987-e444-4658-a95b-d59b784aa2d7","name":"Pennsylvania","slug":"pennsylvania","kind":"state","parentLocationId":"aa8b9c05-c836-4021-801f-59801970401e","region":"Northeast","lat":41.2033,"lng":-77.1945,"reviewStatus":"reviewed","aliases":["Commonwealth of Pennsylvania","PA"],"collisionRisk":"none","reviewNote":null,"createdAt":"2026-05-25T22:46:00.778Z","updatedAt":"2026-07-10T01:01:17.260Z"},"parties":[{"id":"465c605a-c814-4040-a82c-8ca08a7feaae","dataCenterId":"d3473917-8d06-4873-9049-d953c9440389","companyId":"f1eec17a-ac6a-44b0-b792-29e365601eca","externalName":null,"role":"operator","structureNotes":null,"createdAt":"2026-11-22T00:35:45.716Z","company":{"id":"f1eec17a-ac6a-44b0-b792-29e365601eca","name":"5C Data Centers","slug":"5c-data-centers"}},{"id":"d93d2712-a768-427b-af01-677df53c197c","dataCenterId":"d3473917-8d06-4873-9049-d953c9440389","companyId":"8eee5c2f-0939-4459-b1a6-5245bd94d514","externalName":null,"role":"tenant","structureNotes":null,"createdAt":"2026-11-22T00:35:47.062Z","company":{"id":"8eee5c2f-0939-4459-b1a6-5245bd94d514","name":"AMD","slug":"amd"}},{"id":"e33f39b2-bc0f-46dd-8773-93dbc392ab50","dataCenterId":"d3473917-8d06-4873-9049-d953c9440389","companyId":null,"externalName":"Fit Energy USA","role":"land_owner","structureNotes":null,"createdAt":"2026-11-22T00:35:48.328Z","company":null}],"capacityClaims":[{"id":"b26d75c1-f926-4a64-8e88-159b5efdecf1","dataCenterId":"d3473917-8d06-4873-9049-d953c9440389","series":"announced","valueGw":0.16,"asOf":"2026-11-20T00:00:00.000Z","sourceUrl":"https://www.privatewealthdaily.com/story/amd-named-intended-tenant-at-5c-s-pennsylvania-campus","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"intake proposal 47867301-ee28-46ed-a498-2e7ae476a355","createdAt":"2026-11-22T00:35:49.972Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"permits":[],"facilities":[],"incidents":[],"events":[{"id":"3e1add5d-6b95-47b5-9598-b8326412bef9","dataCenterId":"d3473917-8d06-4873-9049-d953c9440389","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.16","claimId":"b26d75c1-f926-4a64-8e88-159b5efdecf1","detail":null,"occurredAt":"2026-11-22T00:35:50.357Z","createdAt":"2026-11-22T00:35:50.357Z"},{"id":"489b8faa-a20d-433f-b45e-086db3c6c9db","dataCenterId":"d3473917-8d06-4873-9049-d953c9440389","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.16","claimId":"b26d75c1-f926-4a64-8e88-159b5efdecf1","detail":"reported · journalist_report","occurredAt":"2026-11-22T00:35:50.212Z","createdAt":"2026-11-22T00:35:50.212Z"},{"id":"710876aa-8835-4b8c-876e-46f4d81a5bb9","dataCenterId":"d3473917-8d06-4873-9049-d953c9440389","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"land_owner: Fit Energy USA","occurredAt":"2026-11-22T00:35:48.781Z","createdAt":"2026-11-22T00:35:48.781Z"},{"id":"5440dfe2-ae9f-4825-a36a-254777719929","dataCenterId":"d3473917-8d06-4873-9049-d953c9440389","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: 8eee5c2f-0939-4459-b1a6-5245bd94d514","occurredAt":"2026-11-22T00:35:47.422Z","createdAt":"2026-11-22T00:35:47.422Z"},{"id":"4b73cc0a-6111-4710-ae4c-f8aaedfceff4","dataCenterId":"d3473917-8d06-4873-9049-d953c9440389","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: f1eec17a-ac6a-44b0-b792-29e365601eca","occurredAt":"2026-11-22T00:35:46.163Z","createdAt":"2026-11-22T00:35:46.163Z"}],"capacity_picture":{"announced_gw":0.16,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.16,"by_series":{"announced":{"valueGw":0.16,"asOf":"2026-11-20T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.privatewealthdaily.com/story/amd-named-intended-tenant-at-5c-s-pennsylvania-campus"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"5C Mount Carmel Township data center campus (Northumberland County, Pennsylvania)","url":"https://registry.deploy.report/datacenters/5c-amd-mount-carmel-township-data-center-campus-pennsylvania","address":{"@type":"PostalAddress","addressLocality":"Pennsylvania"}}}