{"id":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","slug":"applied-digital-delta-forge-1-boyce-louisiana","name":"Delta Forge 1 (Boyce / Rapides Parish)","aliases":["Delta Forge 1","APLD Delta Forge 1","Applied Digital Rapides Parish","Applied Digital Boyce Louisiana","Delta Forge 1 Alexandria Louisiana","APLD DF1","Applied Digital Rapides Parish AI Factory"],"locationId":"c7c0583f-7f32-442f-9d05-356483922ff0","lat":31.3904558,"lng":-92.6693132,"locationPrecision":"city","landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":"2027-07-01T00:00:00.000Z","expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":"other","waterSourceNotes":"Applied Digital describes proprietary waterless / closed-loop cooling for high-density AI halls ([Applied Digital IR](https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai); [Louisiana Economic Development](https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus)).","servingUtility":"Cleco","acreage":500,"totalBuildingSqft":null,"streetAddress":null,"notes":"Applied Digital AI Factory campus near Boyce in Rapides Parish, Louisiana (company materials also reference Alexandria). Company IR (Jan 22, 2026) announced groundbreaking for an initial 430 MW of total utility power enabling up to 300 MW of critical IT load across two 150 MW facilities on more than 500 acres, with initial operations targeted for mid-2027 and further scale contemplated in 2028 and beyond. April 23, 2026 Form 8-K / press release: Applied Digital entered a ~15-year lease with an unnamed U.S. high investment-grade hyperscaler covering 300 MW of critical IT load at ~$7.5B contracted value. Louisiana Economic Development (May 26, 2026) framed a $3.6B investment supporting 200 on-site jobs (418 including indirect), with Cleco supplying power; LED describes the initial two facilities across approximately 300 acres (company IR/8-K use more than 500 acres). Distinct from applied-digital-delta-forge-2 (Ellendale, ND / Polaris Forge).","keyFacts":[{"label":"Operator / developer","value":"Applied Digital (designs, builds, operates)"},{"label":"Location","value":"Boyce, Rapides Parish, Louisiana; first Applied Digital Louisiana campus"},{"label":"Timeline","value":"Groundbreaking announced Jan 22 2026; initial operations targeted mid-2027"},{"label":"Power (company-claimed)","value":"430 MW utility power enabling up to 300 MW critical IT across two 150 MW facilities"},{"label":"Hyperscaler lease (company-claimed)","value":"300 MW critical IT on a ~15-year lease with an unnamed US hyperscaler; about $7.5B contract value"},{"label":"Site size (sources differ)","value":"More than 500 acres per Applied Digital; about 300 acres for first two buildings per state"},{"label":"Serving utility","value":"Cleco"},{"label":"Cooling (company-claimed)","value":"Proprietary waterless, closed-loop cooling for high-density AI"},{"label":"Stated investment","value":"$3.6 billion per Louisiana Economic Development"},{"label":"Jobs","value":"200 full-time jobs; 1,000+ peak construction workers"},{"label":"State incentive","value":"Sales and use tax exemption on data center equipment under Act 730 (2024)"},{"label":"Related campus","value":"Distinct from Delta Forge 2 in Ellendale, ND"}],"reviewStatus":"reviewed","sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai","title":"Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus in a Southern U.S. State","sourceName":"Applied Digital IR"},{"url":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","title":"Central Louisiana Secures $3.6 Billion Applied Digital AI Factory Campus","sourceName":"Louisiana Economic Development"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"Applied Digital Form 8-K (Apr 23, 2026) — Delta Forge 1 hyperscaler lease","sourceName":"SEC Form 8-K / Applied Digital"}],"reviewNote":null,"createdAt":"2026-09-27T05:17:26.570Z","updatedAt":"2026-10-12T23:48:35.297Z","location":{"id":"c7c0583f-7f32-442f-9d05-356483922ff0","name":"Boyce","slug":"boyce-louisiana","kind":"city","parentLocationId":"4da30c61-f60d-487c-9f43-ae22f204b48b","region":"Louisiana","lat":31.3904558,"lng":-92.6693132,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-18T04:01:53.053Z","updatedAt":"2026-08-21T18:00:20.724Z"},"parties":[{"id":"8aa75290-24a5-41dc-98b8-c5267454d0bd","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","companyId":"67278635-e1c4-464f-8e6c-8efedbee2c2c","externalName":null,"role":"developer","structureNotes":"Designs, builds, and operates the Delta Forge 1 AI Factory campus.","createdAt":"2026-09-27T05:17:28.172Z","company":{"id":"67278635-e1c4-464f-8e6c-8efedbee2c2c","name":"Applied Digital","slug":"applied-digital"}},{"id":"d835ebf4-f836-42b9-91b6-49bbc732ac8f","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","companyId":null,"externalName":"Cleco","role":"utility","structureNotes":"Named power supplier in the Louisiana Economic Development announcement.","createdAt":"2026-09-27T05:17:28.950Z","company":null},{"id":"c76b5ec6-6716-4fe6-83f2-04c4d5cdee4f","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","companyId":null,"externalName":"Unnamed U.S. high investment-grade hyperscaler","role":"tenant","structureNotes":"April 23, 2026 lease for 300 MW critical IT (~$7.5B / ~15-year term). Company does not name the counterparty.","createdAt":"2026-09-27T12:41:03.229Z","company":null}],"capacityClaims":[{"id":"88662e56-a854-4ca3-9189-600dca46696e","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","series":"announced","valueGw":0.3,"asOf":"2026-05-26T00:00:00.000Z","sourceUrl":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","sourceType":"government","evidenceTier":"reported","supersedesId":null,"note":"LED and Applied Digital describe two facilities totaling 300 MW of critical IT load; IR also cites 430 MW total utility power enabling up to 300 MW critical IT.","createdAt":"2026-09-27T05:17:27.633Z"},{"id":"8602618c-9f24-4efc-ab37-f218ed95fdad","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","series":"contracted","valueGw":0.3,"asOf":"2026-04-23T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","sourceType":"sec_filing","evidenceTier":"reported","supersedesId":null,"note":"Form 8-K / press release: ~15-year lease covering 300 MW critical IT with unnamed U.S. high investment-grade hyperscaler; ~$7.5B contracted value.","createdAt":"2026-09-27T12:40:58.177Z"}],"financialClaims":[{"id":"d5b32109-b94a-4e75-98e1-abea3d4ab34d","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","kind":"capex","label":"LED-framed campus investment","valueUsd":"3600000000","capUsd":null,"conditions":"Louisiana Economic Development framing of a $3.6B Applied Digital AI factory campus investment.","asOf":"2026-05-26T00:00:00.000Z","sourceUrl":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","sourceType":"government","evidenceTier":"reported","createdAt":"2026-09-27T12:40:59.461Z"},{"id":"d26fa188-6652-4598-8f53-894ef1382565","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","kind":"lease_term","label":"Hyperscaler lease at Delta Forge 1 (300 MW critical IT)","valueUsd":"7500000000","capUsd":null,"conditions":"Company: approximately $7.5B total contracted value over an estimated 15-year base term covering 300 MW critical IT; tenant unnamed U.S. high investment-grade hyperscaler.","asOf":"2026-04-23T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","sourceType":"sec_filing","evidenceTier":"reported","createdAt":"2026-09-27T12:40:58.711Z"}],"metricClaims":[{"id":"f54dad06-5a13-44c1-bbfc-69aa7dafbec3","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","metricType":"capex_usd","valueNumeric":3600000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-05-26T00:00:00.000Z","sourceUrl":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","sourceType":"government","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-09-27T12:41:00.219Z"},{"id":"26c41a81-a694-45b5-90a8-4cc76467f910","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","metricType":"cooling_type","valueNumeric":null,"valueText":"closed-loop / waterless (company proprietary)","unit":null,"grantingJurisdiction":null,"asOf":"2026-01-22T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-09-27T12:41:02.479Z"},{"id":"b0ea10f2-e986-4ef8-81de-154a76cdcd79","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","metricType":"jobs_construction","valueNumeric":1000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-05-26T00:00:00.000Z","sourceUrl":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","sourceType":"government","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-09-27T12:41:01.728Z"},{"id":"45234c65-be3e-4e2f-a60c-6b2751e48e34","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","metricType":"jobs_permanent","valueNumeric":200,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-05-26T00:00:00.000Z","sourceUrl":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","sourceType":"government","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-09-27T12:41:00.973Z"}],"powerProjects":[],"permits":[{"id":"e11c56b3-3d2b-400b-9801-07b87c79dbae","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","agency":"LDEQ","jurisdiction":"Louisiana","kind":"air","permitType":"Air permit (proposed initial synthetic minor source operating permit)","number":"2360-00175-00","applicant":"Applied Digital Corporation","status":"pending","filedDate":null,"decidedDate":null,"docket":"AI 250709 / PER20260002","regulatedEntityId":null,"sourceUrl":"https://deq.louisiana.gov/public-notices?pn=12","reviewStatus":"reviewed","reviewNote":null,"lastCheckedAt":"2026-11-17T00:00:00.000Z","createdAt":"2026-11-18T02:56:16.513Z","updatedAt":"2026-11-18T02:56:16.513Z"}],"facilities":[],"incidents":[],"events":[{"id":"1d92af27-9a63-46f3-a7f9-1288f748f01d","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"LDEQ 2360-00175-00: pending","claimId":null,"detail":"Air permit (proposed initial synthetic minor source operating permit) 2360-00175-00 recorded from https://deq.louisiana.gov/public-notices?pn=12","occurredAt":"2026-11-18T02:56:16.738Z","createdAt":"2026-11-18T02:56:16.738Z"},{"id":"29cc293c-05b8-4653-a9e0-aced0843dcc7","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: Unnamed U.S. high investment-grade hyperscaler","occurredAt":"2026-09-27T12:41:03.610Z","createdAt":"2026-09-27T12:41:03.610Z"},{"id":"881fc31f-f5e0-4289-bd22-6c635961fdb2","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:cooling_type","occurredAt":"2026-09-27T12:41:02.857Z","createdAt":"2026-09-27T12:41:02.857Z"},{"id":"533bbe4b-92ee-477e-b48a-ac1294871425","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:jobs_construction=1000","occurredAt":"2026-09-27T12:41:02.103Z","createdAt":"2026-09-27T12:41:02.103Z"},{"id":"9f8081db-d63f-41ec-a944-9e6ceb7cc210","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:jobs_permanent=200","occurredAt":"2026-09-27T12:41:01.346Z","createdAt":"2026-09-27T12:41:01.346Z"},{"id":"d2977bec-271b-40f0-85d1-62e72bd43e2b","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:capex_usd=3600000000","occurredAt":"2026-09-27T12:41:00.601Z","createdAt":"2026-09-27T12:41:00.601Z"},{"id":"12e4e0ed-f96a-4298-a99b-2ef1e5ba47f8","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: LED-framed campus investment","occurredAt":"2026-09-27T12:40:59.836Z","createdAt":"2026-09-27T12:40:59.836Z"},{"id":"8cdb332e-a2bb-4da6-821e-49239241072e","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"lease_term: Hyperscaler lease at Delta Forge 1 (300 MW critical IT)","occurredAt":"2026-09-27T12:40:59.086Z","createdAt":"2026-09-27T12:40:59.086Z"},{"id":"8c185c08-ba0a-4e23-9a70-e700467e7edd","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"0.3","claimId":"8602618c-9f24-4efc-ab37-f218ed95fdad","detail":null,"occurredAt":"2026-09-27T12:40:58.490Z","createdAt":"2026-09-27T12:40:58.490Z"},{"id":"d7bd6a81-b330-4aeb-ae14-921dff7d2806","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"0.3","claimId":"8602618c-9f24-4efc-ab37-f218ed95fdad","detail":"reported · sec_filing","occurredAt":"2026-09-27T12:40:58.334Z","createdAt":"2026-09-27T12:40:58.334Z"},{"id":"93504c74-82cc-4dfc-adfe-0182e09cba95","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Cleco","occurredAt":"2026-09-27T05:17:29.322Z","createdAt":"2026-09-27T05:17:29.322Z"},{"id":"d102f164-9a0e-4b87-aa5a-0ad6699a6fa1","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: 67278635-e1c4-464f-8e6c-8efedbee2c2c","occurredAt":"2026-09-27T05:17:28.556Z","createdAt":"2026-09-27T05:17:28.556Z"},{"id":"805be2d3-dc15-4b90-849d-192ea41f0d77","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.3","claimId":"88662e56-a854-4ca3-9189-600dca46696e","detail":null,"occurredAt":"2026-09-27T05:17:27.940Z","createdAt":"2026-09-27T05:17:27.940Z"},{"id":"3387dc69-48c9-4ea1-b8f0-ce5cc655a0a5","dataCenterId":"8ad2dfad-c906-4d69-bfb9-b9d78a8671c3","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.3","claimId":"88662e56-a854-4ca3-9189-600dca46696e","detail":"reported · government","occurredAt":"2026-09-27T05:17:27.782Z","createdAt":"2026-09-27T05:17:27.782Z"}],"capacity_picture":{"announced_gw":0.3,"contracted_gw":0.3,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.3,"by_series":{"announced":{"valueGw":0.3,"asOf":"2026-05-26T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus"},"contracted":{"valueGw":0.3,"asOf":"2026-04-23T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf"},"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Delta Forge 1 (Boyce / Rapides Parish)","url":"https://registry.deploy.report/datacenters/applied-digital-delta-forge-1-boyce-louisiana","geo":{"@type":"GeoCoordinates","latitude":31.3904558,"longitude":-92.6693132},"address":{"@type":"PostalAddress","addressLocality":"Boyce"}}}