{"id":"9296361c-cc72-45d3-af78-92a1b47e790f","slug":"applied-digital-delta-forge-2","name":"Delta Forge 2","aliases":["Delta Forge 2","APLD Delta Forge 2","Applied Digital Delta Forge 2","Delta Forge 2 Brookwood","Delta Forge 2 Alabama"],"locationId":"ae80803f-b11f-4a54-86fe-d579cc2ad8dc","lat":null,"lng":null,"locationPrecision":null,"landStatus":null,"lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Applied Digital's fifth AI Factory campus (Delta Forge 2): 210 MW critical IT leased to an unnamed U.S. high investment-grade hyperscaler under a 15-year take-or-pay structure. Company IR (Jun 8, 2026) locates the campus only as a \"new southern state\" with initial operations targeted for Q1 2028. Local and trade press (DCD, al.com, WBRC, Sep 2026) report the site near Brookwood in Tuscaloosa County, Alabama (~1,300-acre site; ~$3.2B investment claimed in secondary coverage). This row was previously mislabeled as an Ellendale, ND / CoreWeave building; that Ellendale content belongs to Polaris Forge 1. Polaris Forge 2 is already tracked at Harwood, ND.","keyFacts":[{"label":"Critical IT (contracted)","value":"210 MW under a 15-year take-or-pay lease"},{"label":"Tenant","value":"Unnamed US investment-grade hyperscaler, not CoreWeave"},{"label":"Location (reported)","value":"Brookwood, Tuscaloosa County, Alabama"},{"label":"Contracted revenue (company-claimed)","value":"About $5.2B base term; $12.7B with all renewals over 30 years"},{"label":"Initial operations (targeted)","value":"Q1 2028"},{"label":"Related campuses","value":"Distinct from Polaris Forge 1 (Ellendale) and Polaris Forge 2 (Harwood, ND)"}],"reviewStatus":"reviewed","sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2","date":"2026-06-08","title":"Applied Digital Signs 210 MW Lease at Delta Forge 2","publisher":"Applied Digital (IR)"},{"url":"https://www.datacenterdynamics.com/en/news/applied-digital-reveals-32bn-delta-forge-2-ai-data-center-will-be-built-in-alabama/","title":"Applied Digital reveals $3.2bn Delta Forge 2 AI data center will be built in Alabama","sourceName":"Data Center Dynamics"},{"url":"https://www.al.com/business/2026/09/data-center-company-confirms-32-billion-hyperscale-ai-factory-for-alabama.html","title":"Applied Digital confirms $3.2B hyperscale AI factory for Brookwood","sourceName":"al.com"}],"reviewNote":null,"createdAt":"2026-08-28T02:09:31.083Z","updatedAt":"2026-10-12T23:51:15.579Z","location":{"id":"ae80803f-b11f-4a54-86fe-d579cc2ad8dc","name":"Brookwood","slug":"brookwood-alabama","kind":"city","parentLocationId":"a9a93000-c700-46aa-b2ef-72f6a274ef94","region":"Alabama","lat":33.2556719,"lng":-87.3208336,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T04:41:48.064Z","updatedAt":"2026-08-21T18:00:34.113Z"},"parties":[{"id":"ebe62361-436f-46c1-8dbd-a01866ba6be8","dataCenterId":"9296361c-cc72-45d3-af78-92a1b47e790f","companyId":"67278635-e1c4-464f-8e6c-8efedbee2c2c","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-08-28T02:09:31.675Z","company":{"id":"67278635-e1c4-464f-8e6c-8efedbee2c2c","name":"Applied Digital","slug":"applied-digital"}},{"id":"e7edcfd6-b61c-44c1-8e1f-a13d9023d438","dataCenterId":"9296361c-cc72-45d3-af78-92a1b47e790f","companyId":null,"externalName":"Unnamed U.S. high investment-grade hyperscaler","role":"offtaker","structureNotes":null,"createdAt":"2026-09-28T03:07:49.535Z","company":null}],"capacityClaims":[],"financialClaims":[],"metricClaims":[],"powerProjects":[],"permits":[{"id":"d80a9a6c-82d1-428b-b39d-9bbe64f8e1a5","dataCenterId":"9296361c-cc72-45d3-af78-92a1b47e790f","agency":"ADEM","jurisdiction":"Alabama","kind":"air","permitType":"Air permit application (facility ID 413-0132; type not shown in index)","number":"413-0132","applicant":"Applied Digital Corporation","status":"pending","filedDate":"2026-10-01T00:00:00.000Z","decidedDate":null,"docket":null,"regulatedEntityId":null,"sourceUrl":"https://app.adem.alabama.gov/eFile/","reviewStatus":"reviewed","reviewNote":null,"lastCheckedAt":"2026-11-17T00:00:00.000Z","createdAt":"2026-11-18T02:56:16.899Z","updatedAt":"2026-11-18T02:56:16.899Z"},{"id":"2db78663-560a-4377-9ca7-542d2a10323b","dataCenterId":"9296361c-cc72-45d3-af78-92a1b47e790f","agency":"ADEM","jurisdiction":"Alabama","kind":"stormwater","permitType":"Construction stormwater general permit coverage (NOI)","number":"ALR10C8B4","applicant":"Applied Digital Corporation (eFile facility: APPLIED DIGITAL CORPORATION BROOKWOOD FORGE1; permittee per press APLD BHM-01 LLC)","status":"active","filedDate":null,"decidedDate":"2026-07-20T00:00:00.000Z","docket":null,"regulatedEntityId":null,"sourceUrl":"https://app.adem.alabama.gov/eFile/","reviewStatus":"reviewed","reviewNote":null,"lastCheckedAt":"2026-11-17T00:00:00.000Z","createdAt":"2026-11-18T02:56:17.264Z","updatedAt":"2026-11-18T02:56:17.264Z"}],"facilities":[],"incidents":[],"events":[{"id":"14460fea-f5ce-4ac6-98b8-55ac5aec94ff","dataCenterId":"9296361c-cc72-45d3-af78-92a1b47e790f","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"ADEM ALR10C8B4: active","claimId":null,"detail":"Construction stormwater general permit coverage (NOI) ALR10C8B4 recorded from https://app.adem.alabama.gov/eFile/","occurredAt":"2026-11-18T02:56:17.415Z","createdAt":"2026-11-18T02:56:17.415Z"},{"id":"c0bd8e21-aab1-48eb-982f-cfc667581e7c","dataCenterId":"9296361c-cc72-45d3-af78-92a1b47e790f","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"ADEM 413-0132: pending","claimId":null,"detail":"Air permit application (facility ID 413-0132; type not shown in index) 413-0132 recorded from https://app.adem.alabama.gov/eFile/","occurredAt":"2026-11-18T02:56:17.047Z","createdAt":"2026-11-18T02:56:17.047Z"}],"capacity_picture":{"announced_gw":null,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Delta Forge 2","url":"https://registry.deploy.report/datacenters/applied-digital-delta-forge-2","address":{"@type":"PostalAddress","addressLocality":"Brookwood"}}}