{"id":"6ece29a4-41b2-4134-9a89-b5778ac70a8e","slug":"applied-digital-garden-city-data-center","name":"Garden City Data Center","aliases":["Garden City"],"locationId":"2f2b5c49-aa2d-4268-8191-7c00786260da","lat":null,"lng":null,"locationPrecision":null,"landStatus":null,"lifecycleState":"energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Legacy hosting (Cloud Services / bitcoin hosting) campus.","keyFacts":[{"label":"IT capacity (company-claimed)","value":"200 MW hosting facility"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.applieddigital.com/","title":"Garden City Data Center — applied-digital facility"}],"reviewNote":null,"createdAt":"2026-08-28T02:09:29.405Z","updatedAt":"2026-10-13T00:14:56.565Z","location":{"id":"2f2b5c49-aa2d-4268-8191-7c00786260da","name":"Garden City","slug":"garden-city-texas","kind":"city","parentLocationId":"e253b74b-a639-4a87-871c-343095bd8ee3","region":"Texas","lat":31.8640373,"lng":-101.4813478,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-18T04:02:59.153Z","updatedAt":"2026-08-21T18:03:50.854Z"},"parties":[{"id":"a14b7899-575c-43e7-84ea-ea2019d39f63","dataCenterId":"6ece29a4-41b2-4134-9a89-b5778ac70a8e","companyId":"67278635-e1c4-464f-8e6c-8efedbee2c2c","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-08-28T02:09:29.801Z","company":{"id":"67278635-e1c4-464f-8e6c-8efedbee2c2c","name":"Applied Digital","slug":"applied-digital"}}],"capacityClaims":[],"financialClaims":[],"metricClaims":[],"powerProjects":[],"permits":[{"id":"13cba4f0-dfab-4342-a8b4-30f19e7452cd","dataCenterId":"6ece29a4-41b2-4134-9a89-b5778ac70a8e","agency":"TCEQ","jurisdiction":"Texas","kind":"stormwater","permitType":"Construction stormwater authorization","number":"TXR1596IV","applicant":"Onyx General Contractors LLC","status":"expired","filedDate":null,"decidedDate":null,"docket":null,"regulatedEntityId":"RN111484481","sourceUrl":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN111484481&re_name_txt=&pgm_area=&addn_num_txt=&addn_id_status_cd=&deliv_txt=&city_name=&zip_cd=&cnty_name=","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: TCEQ registers this site as APPLIED BLOCKCHAIN in Garden City, Glasscock County, and Applied Blockchain (now Applied Digital) built its 200 MW Garden City facility there. The authorization is expired and the campus has since been sold to MARA. https://www.sec.gov/Archives/edgar/data/1144879/000114487922000005/apldex991opspr7182022.htm \"Construction of Applied Blockchain's 200-Megawatt (\"MW\") facility in Garden City, Texas is progressing with several buildings erected and electrical equipment delivered.\"","lastCheckedAt":"2026-11-17T21:27:16.770Z","createdAt":"2026-11-17T21:13:23.539Z","updatedAt":"2026-11-18T18:51:11.073Z"}],"facilities":[],"incidents":[],"events":[{"id":"a235f13b-4551-43df-94a2-24bb6baed2e8","dataCenterId":"6ece29a4-41b2-4134-9a89-b5778ac70a8e","eventType":"permit_status_changed","series":null,"oldValue":"unknown","newValue":"expired","claimId":null,"detail":"TCEQ TXR1596IV: unknown to expired (Central Registry, 2026-11-17)","occurredAt":"2026-11-17T21:27:17.156Z","createdAt":"2026-11-17T21:27:17.156Z"},{"id":"c666116c-d289-44fe-a4af-fba3fc895dde","dataCenterId":"6ece29a4-41b2-4134-9a89-b5778ac70a8e","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"TCEQ TXR1596IV: unknown","claimId":null,"detail":"Construction stormwater authorization TXR1596IV recorded from https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN111484481&re_name_txt=&pgm_area=&addn_num_txt=&addn_id_status_cd=&deliv_txt=&city_name=&zip_cd=&cnty_name=","occurredAt":"2026-11-17T21:13:24.059Z","createdAt":"2026-11-17T21:13:24.059Z"}],"capacity_picture":{"announced_gw":null,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Garden City Data Center","url":"https://registry.deploy.report/datacenters/applied-digital-garden-city-data-center","address":{"@type":"PostalAddress","addressLocality":"Garden City"}}}